Download presentation
Presentation is loading. Please wait.
1
Logoplaste UK Ltd Coleford Plant
2
7 step process Step 1 We Committed to making zero pellet loss a priority Step 2 Assessed our Plants situation and needs Step 3 Conducted a site wide audit Step 4 Determined if we had appropriate facilities and equipment. Step 5 Do employees have and are they following the procedures. Step 6 Make needed upgrades in facilities and equipment as appropriate Step 7 Raise employee awareness and create accountability.
3
Each load has 1.75 billion pellets
Material Flow Chart – Audit Process Lorry arrives at unloading point Meet driver and receive documentation Take seal off and get sample Unlock silo port Connect pipe to silo port Start unloading process Finish tipping Pack equipment away and leave unloading point Each load has 1.75 billion pellets A spillage of 0.01% = 175,000 lost pellet “opportunities” Where spillages could occur: Not likely Average High
4
Material Flow Chart – Audit Process
Silo pipe work Factory Delivery pipe work Material Manifold Drier delivery pipe work Blender/Drier Metal dectector Injection Machine Material converted to preforms Where spillages could occur: Not likely Average High
5
Improvements Purchased catch trays – these are placed under the sampling port on the vehicle They are also be used to empty pipes when silo blockages occur
6
Improvements Catch tray under silo ports – this contains any pellets lost whilst hooking and unhooking vehicle pipe work.
7
Improvements In 2015 all Silo pipe work was upgraded from flexi pipe to metal solid pipework. No leaks experienced as yet Deep clean the silos. Fitted skirting underneath the silo ring to contain / control spillages
8
Improvements Information posted in Silo area for the team and vehicle drivers to maintain awareness. Use of air lines to blow pellets around is not allowed.
9
Improvements High risk drains fitted with rubber sheeting to contain any loose pellets and prevent them from entering the drains. Making it easier to clean up any spills
10
Improvements Silo connection ports have been enclosed to prevent wide spread pellets loss in a connection fails under loading. Allowing for a quicker and easier containment and clean up.
11
Improvements Fitted mesh screens over drains directly opposite silo loading point. Allows water through but catches the pellets
12
Improvements Installed a vacuum in the Silo area to allow the drivers and team member to clean up any spills quickly.
13
Improvements Fitted mesh screens over bunded drains by the silo loading point. Allows water through but catches the pellets Fit internal catch tray in larger open drains that lead to site effluent plant.
14
Improvements Drains are deep cleaned on an annual basis
A road sweeper is used every fortnight to sweep the silo delivery ports and surrounding areas. The inside of the silos are inspected monthly for pipe work security to detect any potential risk before a problem occurs. A Donaldson dust extraction system is used to remove any dust from the system allowing to be prevented from entering the atmosphere.
15
Supplier engagement Main suppliers contacted to make them aware of our commitment to Operation Clean Sweep. Suppliers engaged with a review of driver work instructions and systems used. Signed commitment document from them.
16
Join in the quiz and win. Employee engagement
A competition is being held for employees to help increase knowledge of OCS and our Objectives. All answers can be found on the Operation Clean sweep web site Join in the quiz and win. Take a form from below and Return it filled out with your Answers to Martin Lock. To be in with a chance to win an £100 Meal Voucher for the Moody Cow pub in Upton Bishop, Herefordshire! Good Luck To All The winner will be announced on Friday 30th September 2016
17
18 slide presentation running on Large screen TV’s
Employee engagement 18 slide presentation running on Large screen TV’s Plastic Pellets Environment in the ZERO PELLET LOSS
18
The Journey from GOOD to EXCELLENCE Never ends!
Step 3 Conducted a site wide audit Step 4 Determined if we had appropriate facilities and equipment. Step 5 Do employees have and are they following the procedures. Step 6 Make needed upgrades in facilities and equipment as appropriate Step 1 We Committed to making zero pellet loss a priority Step 2 Assessed our Plants situation and needs Step 7 Raise employee awareness and create accountability. COLEFORD Operation Clean sweep The Journey from GOOD to EXCELLENCE Never ends! PROJECT OVERVIEW Rubber covers to prevent drain ingress Catch tray for driver connection point Changed from flexi to solid pipe work Increased signage for improved awareness Catch tray and connection points Enclosure to prevent busrt pipe spills
19
End Thank You !