3 ad valorem tax based on value of property in the district -
FUNDING ad valorem tax based on value of property in the district - 2.34 mills (current) MISSION to work with Corps of Engineers to accomplish their mission to maintain authorized width and depth of the Red River as well as maintaining 24/7/365 lock operations. to acquire right of ways for Red River Waterway project. to participate in economic development for waterway area via assistance to ports to develop initial facilities and by providing and maintaining navigable channels between ports and the river channel. GOALS increase tonnage through economic development. continued funding support for ports. continued development of recreation areas at appropriate locations. support Corps of Engineers in their civil works effort.

4 The Red River Before the Red River Waterway project began, the river was full of debris making transportation dangerous and difficult.

5 Current Position 5 Lock & Dams 20 Recreation Areas
(Over 2 million visitors ) Public / Private Ports ( 8.2 M barge tons – 2011 – as reported by U.S. Corps of Engineers ) 6.3 M tons projected for Already surpassed initial projections. Today, the Red River is a 225-mile navigable and controlled waterway providing commerce, education, and recreational opportunities for future generations.

6 Navigation Lindy C. Boggs L&D John H. Overton L&D Lock & Dam #3
Russell B. Long L&D Joe D. Waggonner L&D

7 Recreation Boating Recreation Areas RV Park Water Sports
Hiking & Nature Trails Fishing Tournaments

8 Florida Bass Stocking 2000 to 2006 – partnership with LA Dept. of Wildlife & Fisheries. 5-7 inch Phase II fingerlings released in 5 pools. Result #1 - improved quality of fishery and trophy-sized bass. Resume partnership in 2013. Result #2 ...

9 Economic Impact – over $45 million
Major Tournaments 2009 & 2012 August 2013 Economic Impact – over $45 million Attendance – 231,000 plus Economic Impact $5.6 million Bassmaster Classic to return in The same or greater results expected from FLW.

10 LA Port Priority Program
Primary goal to improve the infastructure of LA ports and harbors. Funded by the LA Transportation Trust Fund $20M average funding level Currently, amt. of program funds for one project limited to $15 million ($5 million/year based on historical level of funding). Construction of project can be phased in to allow for early construction. Recommended but unfunded projects can be built with 100% port funds and reimbursed by program when project is finished.

11 Projects – Red River Ports
24 (22 complete, 2 withdrawn) $61,201,648 committed $10,237,800 withdrawn $375,153,109 benefits 1,772 jobs created

12 Caddo-Bossier Port Projects
14 projects (13 complete, 1 withdrawn) $38,035,016 committed $637,500 withdrawn $252,414,705 benefits 1,577 jobs created or retained

13 Port Priority Program Projects
Caddo - Bossier Port Commission Support Infrastructure support infrastructure Consists of: LF 2-lane service road, 3430 LF rail extension, 450 LF rail trestle crossing, 60,000 SF cargo dock, & utilities (including 20,000 LF gray water return & supply pipelines, potable water & sewer service) $10.1MM constr, $9MM state share, 267 jobs created Steelscape commodity: Cold Rolled Coils (master coils) tons each, Zinc and Aluminum Ingots, Coated Steel Coils – Finished product 13 13

14 Significant and positive economic impacts on JBJ Waterway
Over $2 billion invested by non-federal sources in projects on Red River which match or exceed federal investment - businesses locating on river … Benteler Steel, Ron-Pak recreation facilities ,000 estimated jobs (direct and indirect) - events and major tournaments … - Bassmaster Classic 2009 & 2012 with combined economic impact of over $45 million & combined attendance of more than 231,000 people. - Forrest Wood Cup - August $5.6 million CY M tons shipped on Red River; surpasses 2016 projection of 6.3 M tons.