Presentation is loading. Please wait.

Presentation is loading. Please wait.

Appalachian Power Update

Similar presentations


Presentation on theme: "Appalachian Power Update"— Presentation transcript:

1 Appalachian Power Update
Ron Jefferson, Manager External Affairs, Appalachian Power May 26, 2016

2 Appalachian Power Operates in three states serving approximately 957,000 customers (VA ,000). ~6,400 MW of directly-owned generation

3 Rate Stability Virginia
Residential Rates 11.56 ₵/kWh 11.23 ₵/kWh February % decrease in rates Residential rate cent - below National Average 13.3kwh / East Coast Average 15.2kwh / RGGI States Average 16.9kwh Industrial rate 6.55 cent - National Average 8.2 / East Coast Average / 9.7 Stable Rates 2010 2016

4 Generation Coal Amos Plant Mountaineer Plant 3 units / 2,930 MW
Closing 4 plants with 1,735 MWs of lost capacity 2 plants in Virginia / 2 in West Virginia Converting Clinch River plant to natural gas 2 coal plants remaining - both located in WV Amos 2 units are 800 MW each / 1 unit 1,300 MW Mountaineer 1 unit 1,300 MW 1 unit / 1,305 MW Mountaineer Plant 4

5 Generation Gas Virginia Clinch River / 2 units / 484 MW West Virginia
Ceredo / 6 units / 450 MW Ohio Dresden / 1 units / 555 MW 3 natural gas plants Complete Clinch River gas conversion in 2016 Dresden is a combined cycle plant Clinch River and Ceredo are peaker plants Clinch River Plant 5

6 Generation Pump Storage / Hydro
Virginia Smith Mountain / 5 units / 615 MW Leesville / 2 units / 5 MW Claytor / 4 units / 15 MW Byllesby / 4 units / 4 MW Buck / 3 units / 3 MW Niagara / 2 units / 1 MW West Virginia Winfield / 3 units / 9 MW London / 3 units / 7 MW Marmet / 3 units / 6 MW 1 Pump Storage 8 Hydro 665 MW total Smith Mountain Dam 6

7 Generation Purchase Power Agreements PPAs
Wind Beech Ridge (WV) MW Fowler Ridge (IN) 100 MW Camp Grove (IL) 75 MW Grand Ridge (IL) MW Hydro Summersville (WV) 48 MW 4 wind contracts totaling 375 MWs 1 hydro totaling 48 MWs 7

8 2016 APCo Nameplate Capacity Mix
Integrated Resource Plan 2016 APCo Nameplate Capacity Mix

9 2030 APCo Nameplate Capacity Mix
Integrated Resource Plan 2030 APCo Nameplate Capacity Mix Wind production tax credit PTC $22 per MWh Solar investment tax credit ITC 30% 2016 = 10 MW of Utility Scale Solar and 150 MW of Wind June 1, 2020 PJM new capacity rules takes effect 418 MW by 2020.

10 Integrated Resource Plan
2016 APCo Energy Mix

11 Integrated Resource Plan
2030 APCo Energy Mix

12 Clean Power Plan ~30% Reduction in CO2 (2005-2015)
CO2 Reductions Have Occurred ~30% Reduction in CO2 ( )

13 Clean Power Plan Emission Reductions Are Not Uniform
Emissions have increased in AR & LA Majority of reductions occurred prior to 2012 EPA CPP baseline in OH & WV Coal use has since been eliminated in KY & VA 6 6

14 Transmission Virginia Projects
Four major transmission projects started construction in 2014 Jackson ferry / clover dale (improvement of west to east flow of capacity) Total budget for those projects is over $450 million Total amount of investment in Virginia for transmission projects already started = $450 million Cloverdale Station Expansion 765KV and 500kV Yards


Download ppt "Appalachian Power Update"

Similar presentations


Ads by Google