1 Control activities in LS1
G. Pigny, TE-VSC-ICM

2 Control activities in LS1
Outline ICM Manpower Activities for: LHC SPS CPS (L2, PSB, PSR, LT) AD LINAC 4 HIE-ISOLDE NA62 26/10/2012 Control activities in LS1

3 Control activities in LS1
ICM Manpower : 10 staffs 4 FSUs, +2 1 Fellow 6 PJAS/UPAS/USAS, +2 26/10/2012 Control activities in LS1

4 Control activities in LS1
LHC Insulation vacuum Turbos installation controls / cables: QRL (sect A, I ): new 16x VGPF VPGF: new cabling for TMP (Q8R3, Q6R3), long cables Rebuild mobile pumping groups controls: VPGMA,B : modify (20+41), connection to Profibus/PVSS Insulation vacuum - Additional valves controls: Valves bypass (Arc 23), cables reconnection He-leaks controls / cables: (Re)move temporary cabling of He-leak (Arc 34 & 45) QRL: Sec A (pair) sect I (impair), Q8 début d’arc VPGF: new cabling => cables trops long => nouvelle boite VPGMA, B: profibus => PVSS Vanne by pass: reconnexion des cables (vanne entre deux secteurs cryo) He leaks: Remove existing temporary cables 26/10/2012 Control activities in LS1

5 Control activities in LS1
LHC BV STI EC – Installation controls / cables: NEG Cartridges New equipment (DC power supplies), mobile configuration New interconnection boxes and cables (Pt1 exp, Pt3, Pt5 exp, Pt7) Fixed thermocouple installation controls / cables: Fixed thermocouples (Pt 3, 7) New equipment (thermocouple chassis and local boxes) New development software Mobile thermocouple installation controls / cables: Mobile thermocouples (Pt 1, 2, 4, 5, 6, 8) New equipment (thermocouples chassis and local boxes) New cables 26/10/2012 Control activities in LS1

6 Control activities in LS1
LHC BV ARC additional gauges installations controls/cables: New interlocks Q12/Q13 (32x TPG) ALICE – Installation controls / cables: New VGP, VGI STI EC&TDI - Installation controls / cables: IP2, IP8: Install sector valves in TDI (2x TPG + 3x TPG) RF VPNC - Installation controls / cables: Fast Shutter (4x cables) CMS – Installation controls / cables: New GIS (3x TPG + 1x VGI) Collimators TDI: Beam Absorber for Injection, Internal 26/10/2012 Control activities in LS1

7 Control activities in LS1
LHC BV ABT – Consolidation controls / cables: New TCDQ (4x VPI), New MKB (4x VPI + 2x TPG) LHCb – Installation controls: LHCb VELO smog VV (1x cable) IP7 - VPI interlocks controls: Cabling interlock of VPI P7 - R2E racks relocation: Equipment disconnection, move cables UJ76 Cables campaign UJ76  TZ76 (EN/EL) Patch panels installation Moving all equipment in TZ76 Commissioning all Vacuum control equipment in TZ76 TCDQ: Target Collimator Dump Quadrupole (Mobile Diluter Block – Protect Q4) 26/10/2012 Control activities in LS1

8 Control activities in LS1
LHC BV STI EC – Installation controls / cables: IP8: Electron Cloud Diagnostic (x39 cables) NEG pilot sector installation controls / cables: IP2, IP7, IP8: New VGI Interlock VVGS consolidation controls / cables: IP2: New VGIs (MKI) IP4: New VGP and VGI (RF) IP6: New VPI cabling IP7: New VGIs IP8: New VGIs (MKI) 26/10/2012 Control activities in LS1

9 LHC material procurement
Equipment LHC # Foreseen 2012 [kCHF] Committed 2012 [kCHF] Pending 2012 [kCHF] Year VPGF ctrl 17 12 39 4 2012, Portugal, EFACEC VPGM ctrl 75 112 108 10 2012, CERN ET200 TC + loc 101 99 14 2012, Siemens, CERN VPI ctrl 13 59 43 23 2012, Spain, Barrachina VGR/P 168 169 2012, CERN store VGI ctrl 25 107 2012, CH, Volotek NEG PS + loc 11 77 68 2012, Delta, CERN UJ76 patch (R2E) 49 20 5 Tot 2012 [kCHF] 661 645 70 26/10/2012 Control activities in LS1

10 Control activities in LS1
SPS SPS ARCS – Sectorization controls / cables: New sectors X10, X60 (BA1-6) Faster pumping time Racks reorganization, inter rack cabling, new equipment VPI recabling at new valves position, update PVSS/DB SPS Maintenance controls / cables: All ring, TT20, BA1, TDC2/TCC2 replace irradiated cables TS1+ and TDC2/TCC2 - EN/EL cables replacement campaign All ring, TT20 asked by ICM Replace all RXVA/RXVE (260), local cables, recabling and test 26/10/2012 Control activities in LS1

11 Control activities in LS1
SPS BA1 - Modification of sectorization controls/cables MKD & DUMP: new sectorization BA1 consolidation New cables installation (EN/EL) Add new equipment, inter rack cabling, tests, update PVSS/DB BA4 - COLDEX refurbishment controls / cables: TCC2, TBIU/D – Refurbishment controls / cables: Replace bad cables for the targets Connection and tests (ICM) 26/10/2012 Control activities in LS1

12 Control activities in LS1
SPS TDC2, TT10, BA1: Heaters controls / cables: Feedthrough heaters Install heater feedthrough on VPI against moisture Power installation for heaters (EN/EL) Cables connexion and commissioning (ICM) TT10 – Installation controls / cables: New control cables VG,VVS,VPI Replace local (31x) VPI power supplies by a remote system New cables installation (EN/EL) Dismounting old equipment (rack, underground) (ICM) Installation of new equipment and cabling Commissioning, update PVSS/DB 26/10/2012 Control activities in LS1

13 Control activities in LS1
SPS BA5 - New cabling controls / cables: Ghost VVSF Add remote control for existing ghost valves New cables installation (EN/EL) Installation of new equipment and cabling Commissioning, update PVSS/DB New cabling for VG in sector 510,520 Additional gauges for C-coating tests 26/10/2012 Control activities in LS1

14 SPS material procurement
Equipment SPS # Foreseen 2012 [kCHF] Committed Pending Year VGR/P 17 46 2012, CERN store Interlock RXVF 19 24 9 2012, CERN VVS ctrl (card) 15 5 VPI ctrl (local) 200 207 102 72 2012, Spain, Barrachina VPIs’ heater 150 23 2012, CERN (spared) COLDEX 1 25 VPGF (VRCP) 2 1.4 Tot 2012 [kCHF] 332 158 125 26/10/2012 Control activities in LS1

15 Control activities in LS1
CPS LINAC 2 - New fixed TMP groups: Tanks : 6 VPGF + VGR/P Change TMP, Improve pumping capacity (IVM) New cables installation: VGR/P (EN/EL) Replace VPGF control crate: profibus connection and PVSS ctrl. (ICM) New equipment installation: 3x TPG300 (ICM) HW an SW Commissioning, update PVSS/DB (ICM) PSR – Maintenance: Replacement of x21 irradiated cables on PS septum (EN/EL) Re-connection and tests (ICM) LT10: L2 sector ITH: L3 sector ITFS: Experiment 26/10/2012 Control activities in LS1

16 Control activities in LS1
CPS PSB – Consolidation: PSB (ring ) : Remote control for VPS Inter-rack cabling (ICM) Installation of 6x chassis for VPS remote control (ICM) Commissioning, update PVSS/DB (ICM) BTP Line : Cables replacement Replacement of irradiated cables (2xVPI, VVS) (EN/EL) Cables reconnection and tests (ICM) 26/10/2012 Control activities in LS1

17 Control activities in LS1
CPS PSR – Consolidation: Controls Have profibus connection and PVSS control New cables installation (EN/EL) Remove old equipment (156 VPI ctrl) Rack re-organization, inter-rack cabling (~273) New equipment mounting (~200) Commissioning, update PVSS/DB 26/10/2012 Control activities in LS1

18 CPS material procurement
Equipment CPS # Foreseen [kCHF] Committed Pending 2012 [kCHF] Year VVS ctrl 44 58 28 2012, CERN Interlock 2 2.4 7 VPI ctrl (ET200) 5 39 22 4 2012, CERN, Imprelec VGR/P 14 11 2.7 2012, CERN store VPS ctrl 91 81 2012, Spain, PHmic PLC master 1 2011, 11k, Siemens Tot [kCHF] 11+204 11+149 35 26/10/2012 Control activities in LS1

19 Control activities in LS1
AD AD consolidation Controls / cables: New cables installation (control) (EN/EL) Remove old equipment, removing cables Inter rack cabling PLC/PVSS development, DB update Update racks power: Multiple outlet-socket installation (EN/EL) Power installation for VPIs’ heaters feedthrough: Power installation (EN/EL) Cables connection and commissioning (ICM) 26/10/2012 Control activities in LS1

20 Control activities in LS1
AD VPGF Controller / cables: Remove old VPGF (ICM/IVM) New VPGF installation (ICM/IVM) Commissioning VPGM controller / cables: New VPGM installation Profibus Network testing/re-connection 26/10/2012 Control activities in LS1

21 AD material procurement
Equipment AD # Foreseen [kCHF] Committed Pending 2012 [kCHF] Year VPGF ctrl 5 25 29 4.4 2012, Portugal, EFACEC VPGM ctrl 30 2011, Greece, CEO VVS ctrl 15 12 8 2012, CERN CRYO ctrl 1 2013, CERN VPI ctrl 65 (57) 182 135 2012, Spain, Barrachina VGR/P com. 22 18 2011, 18k CERN store VGI ctrl 19 84 2011, 84k Switz. Volotek VPS ctrl 13 58 45 2012, Spain, PHmic PLC master 10 9.5 2012, B1130A/09 Tot [kCHF] 27 26/10/2012 Control activities in LS1

22 Control activities in LS1
LINAC 4 HW installation cables: Check cables for Dump line Local cables Inter-rack cabling (interlock, BIC) local cables installation (VRJA, VPG, VVS) HW installation crates: Replace defective HV transformers (x50 in the worst case) Install the remaining controllers (SVCU cards, ET200 VPI) Installation of profibus boxes (for VPGM address) Gas Injection System Controls for diagnostic line 26/10/2012 Control activities in LS1

23 Control activities in LS1
LINAC 4 Software: PLC/SCADA Development I/O and filed objects Specs and DB Software deployment and commissioning Global commissioning (HW + SW) 26/10/2012 Control activities in LS1

24 Control activities in LS1
HIE-ISOLDE Vacuum control system development and installation: Cables installation Equipment installation, Racks cabling PLC/SCADA development DB updates HW and SW commissioning 26/10/2012 Control activities in LS1

25 Control activities in LS1
NA62 Vacuum control system development and installation Cables installation Equipment installation, inter-racks cabling PLC/SCADA development I/O and field Objects + DB updates Software deployment and commissioning Global commissioning (HW + SW) 26/10/2012 Control activities in LS1

26 Control activities in LS1
Thank you for your attention 26/10/2012 Control activities in LS1

27 Control activities in LS1
26/10/2012 Control activities in LS1


Download ppt "Control activities in LS1"

Similar presentations


Ads by Google