1 Proposals for 2012-13 State: ……..
Presentation to the Steering Committee on Integrated Watershed Management Programme Proposals for State: …….. Date: …………

2 STRUCTURE OF PRESENTATION
Status of IWMP - MIS Perspective Plan of the State on a map Review of progress in implementation of pre-IWMP projects Review of progress under IWMP in , & Proposal under IWMP for the year Strategy of implementation for projects proposed for

3 Online Status of IWMP-MIS
S.No Parameters Present Status 1. WCDC User Account created X out of Y Districts 2. PIA User Account created X out of Y projects 3. State Share Released from State Govt. to SLNA 4. Fund Released from SLNA to WCDC 5. Fund Released from WCDC to PIA or GP or WC 6. State Profile Yes/No 7. Baseline survey 8. Physical and Financial Plan / Achievement (Data entry started)

4 ABSTRACT OF THE STATE:……………….
S. No. Item Details No. Area (lakh ha) 1 Total micro-watersheds (MWS) in the State 2 Total untreatable MWS (Barren Rocky, assured irrigation, etc.) 3 Total treatable MWS in the State (1-2) 4 a Total MWS covered under pre-IWMP schemes of DoLR b Total MWS covered under schemes of other Ministries c Total MWS covered under IWMP upto of DoLR d Total of 4 a to c 5 Balance micro-watersheds not covered till date (3-4d) 6 Plan for covering balance micro-watersheds 12th Plan 13th Plan 14th Plan Total 7 No. of projects (clusters) proposed for Estimated project cost (Rs. in crores) Central share (Rs. in crores) State share (Rs. in crores)

5 LOCATION OF PROJECTS IN THE STATE MICRO WATERSHEDS MAP with clear legends for area treated/ ongoing treatment areas, untreatable areas and area to be taken up in different Plans upto 14th Plan as per uniform colour scheme given below LEGEND RGB Combination Colour Red Green Blue Microwatersheds covered under pre-IWMP projects of DoLR 153 102 51 Microwatersheds covered under other programmes 204 Microwatersheds covered under IWMP for XI Plan 255 Microwatersheds proposed under IWMP for 14 120 17 Microwatersheds proposed under IWMP for remaining part of XII Plan Microwatersheds proposed under IWMP for XIII Plan Microwatersheds proposed under IWMP for XIV Plan Microwatersheds not proposed for treatment (Reserved Forest, Barren Rocky, assured irrigation, etc.)

6 No. of ongoing Hariyali projects which have taken
STATUS & ACTION PLAN FOR COMPLETION OF ONGOING PRE-IWMP PROJECTS OF DOLR Programme No. of ongoing Hariyali projects which have taken 1 inst. 2 inst. 3 inst. 4 inst. Total IWDP DPAP DDP Time by which proposals for release of next installment to be submitted ---

7 STATUS & ACTION PLAN REGARDING SUBMISSION OF UCs UNDER PRE-IWMP
Programme No. of pending UCs Year of oldest pending UC Amount involved in pending UCs (Rs. in crore) Unspent balance available as on IWDP DPAP DDP Total Time by which the pending UCs to be submitted ---

8 STATUS OF NON- PERFORMING PROJECTS UNDER PRE IWMP
Programme No. of projects identified for Foreclosure No. of projects in which all requisite documents submitted No. of projects in which requisite documents submitted partially Date by which all documents will be furnished IWDP DPAP DDP Total

9 INSTITUTIONAL PREPAREDNESS - 1
Particulars For projects sanctioned during For projects sanctioned during For projects sanctioned during No. of projects sanctioned so far No. of Districts covered No. of WCDCs set up No. of projects in which PIAs are appointed No. of NGOs/ VOs appointed as PIAs

10 INSTITUTIONAL PREPAREDNESS - 2
No. of experts & staff to be engaged for projects sanctioned during No. of experts & staff actually engaged for projects sanctioned during SLNA WCDCs WDTs WCs

11 INSTITUTIONAL PREPAREDNESS - 3
(Rs. in crore) Particulars For SLNA For WCDCs Total Central assistance released so far from to Other miscellaneous receipts (incl. interest accrued), if any Total funds available Total expenditure % of expenditure

12 PROGRESS IN DPR PREPARATION (AS ON )
Particulars For projects sanctioned during For projects sanctioned during For projects sanctioned during Total No. of projects sanctioned No. of DPRs already prepared & approved No. of projects in which Works Phase started Timeline for completion of remaining DPRs --- No. of DPRs uploaded in the website of the Nodal Dept. URL of the website

13 PROGRESS IN EPAs (AS ON )
Year No. of EPAs planned No. of EPAs completed No. of beneficiaries of EPAs For projects sanctioned during For projects sanctioned during For projects sanctioned during Total

14 PROGRESS IN CAPACITY BUILDING
Level of stakeholder During the year During the year During the year Total Target (no.) Achieve-ment (no.) SLNA level District level WDT level WC level

15 EXPENDITURE FACT-SHEET (PROJECT FUND) (As on --------)
(Rs. in crore) Budget Component Amount released for projects sanctioned during (Central share + State share) Total expenditure incurred (at all levels) % of Expenditure Total Unspent Balance Total DPR EPA Institution & capacity building Administrative cost Watershed Works Livelihood activities for the asset-less persons Production system & micro-enterprises Monitoring Evaluation Consolidation Phase

16 IWMP – Abstract of Fund Requirement by SLNA during 2012-13
Sl. No. Item I st Quarter II nd Quarter III rd Quarter IV th Quarter Total Unspent Balance as on Actual requirement (7-8) (1) (2) (3) (4) (5) (6) (7) (8) (9) 1 Batch-I (Projects Sanctioned in ) 2 Batch-II (Projects Sanctioned in ) 3 Batch-III (Projects Sanctioned in ) 4 Batch-IV (Projects to be Sanctioned in )

17 Physical & Financial Targets for 2012-13 (Batch-wise)- 3 Slides
Sl. No. Activities to be taken up Unit Total activities planned as per DPR Completed upto previous year Balance to be taken up during the year Phy Fin I Preparatory Phase 1 2 . Sub-Total II Works Phase 3

18 CONSTRAINTS OF STATE GOVT. IN IMPLEMENTING THE PROGRAMME, IF ANY
Measures suggested to overcome the constraints

19 Photographs (FEW SLIDES) For each batch separately
with name of project location, District (including GPS coordinates) type of activity photograph indicating impact before & after the activity

20 PROPOSAL FOR 2012-13 Area allocated for 2012-13 (lakh ha)
Area already appraised & cleared by the Committee for (lakh ha) Area proposed during this meeting (lakh ha) No. of projects No. of Districts

21 DISTRICT-WISE SUMMARY OF PROJECTS PROPOSED FOR 2012-13
S. No. District No. of IWMP projects already sanctioned No. of micro- watersheds covered Area covered in sanctioned IWMP projects (ha) Total projects now proposed No. of Microwater- sheds covered in proposed projects Area to be covered in proposed projects (ha) 1 2 3

22 DISTRICT-WISE PROPOSALS (Separate slide for each District)
Project Name (proposed for ) Weight-age No. of MWS Total project area (ha) Total untreatable area (area under assured irrigation, & uncultivable waste land) Total treatablewasteland area (ha) Total rainfed agricultural area (ha) Project area proposed for treatment (ha) PIA (Designation of the Officer & Department/ Organization should be clearly mentioned) Unit cost (only if differential costs proposed) (1) (2) (3) (4) = (5) + (6) + (7) (5) (6) (7) (8) = (6) + (7) = (4) – (5) (9) (10) District map with clear legends (standard colour scheme given) showing the microwatershed treated/ ongoing treatment areas, untreatable areas, covered by other schemes, MWS covered under IWMP , MWS proposed for , proposed for different Plans upto 14th Plan. The project boundaries may be clear and the projects be labelled. Four major reasons for IWMP in the district, as mentioned in the PPRs:

23 Implementation strategy for projects proposed for 2012-13 – Project level Institutions
WDT WC No. of experts & staff to be employed Procedure of employment Timeline for engagement of experts & staff

24 Implementation strategy for projects proposed for 2012-13 – Capacity Building Plan
Approximate no. of persons to be trained Proposed strategy (institutions, consortiums, model watersheds, etc.) Timeline for completing the initial capacity building

25 Implementation strategy for projects proposed for 2012-13 – Detailed Project Report (DPR)
No. of DPRs to be prepared Strategy for DPR preparation Timeline for completion of DPRs