Contents Sample rollout check list Rollout phases and activities

Similar presentations


Presentation on theme: "Contents Sample rollout check list Rollout phases and activities"— Presentation transcript:

0 Scheduler Roll-Out at HCCRC Institutions
Open Source Community Call May 9th 2017

1 Contents Sample rollout check list Rollout phases and activities
Example small institution timeline Data migration / ETL process Scheduler data flow Template building

2 Sample Rollout Checklist

3 Major Rollout Phases and Activities

4 Sample Small Institution Rollout Timeline

5 Data Migration (ETL) Approach Scheduler Roll-Out at HCCRC Institutions

6 State of Data at the Institutions
Varying methods for scheduling used at each of the four CRCs Methods include: Paper and pencil (scheduling book) Turbo software Outlook Epic Each method yielded different levels of available data in varying formats

7 Data Loaded into Scheduler
Scheduled visits Each visit was put in as an overbook Subjects Resource intensities added to existing visit templates Notes Prior to data migration, studies and visit templates were modeled out and then built directly in the system, resources were added directly to the database For some sites, we were able to move data over programmatically. For other sites, we decided to enter certain data manually based on: Levels of effort for each approach Data available Developer and operational staff availability

8 Approach to ETL Established formats in which each institution would provide their data File format (CSV) and layout Data formats (e.g. dates, strings) Required close communication, trial and error with Harvard Catalyst engineers and institution engineers Coded a program to extract institution data from the CSV files and transform it into our domain objects Created a code branch with a copy of Scheduler code used to populate the database Send sample data (no PHI) Code program, including proper validation messages Run the program on a test system and report errors Engineer at Institution Harvard Catalyst Engineer

9 Challenges & Lessons Learned
Because we are outside of the hospital and there is sensitive patient data, we were only able to utilize sample data when coding and testing This caused a lot of back and forth between engineers at Harvard Catalyst and at the hospital The method used to populate the Scheduler database is not re-usable and was a one-time effort

10 Data Flow

11 Ref. Letter Table(s) A sublocation B resource resource_annotation line_level_annotations resource_type resource_sublocation C resource_schedule resource_alternate D sublocation_closure_interval E user F study_user G study H I J visit_template template_resource template_resource_annotation K template_approval_history L subject M study_subject