Presentation is loading. Please wait.

Presentation is loading. Please wait.

Sun Gongxing, IHEP, Beijing

Similar presentations


Presentation on theme: "Sun Gongxing, IHEP, Beijing"— Presentation transcript:

1 Sun Gongxing, IHEP, Beijing
Grid Activity in China Sun Gongxing, IHEP, Beijing

2 The Grid Projects in China
• Vega Grid Project ( ICT, MOST) • National High Performance Computing Environment funded by 863 program (Many participants, MOST) • Scientific Data Grid. (CAS, MOST) • HEP data grid.(IHEP) • Grid infrastructure building (MOE)

3 Overview of China’s Grid Project
Build a superserver for major grid sites. Build a few of HPC centers. Develop system software for the Grid system. Develop demo applications on the Grid. Build 2Gbps interconnection among 100 university.

4 • Design and implement Grid-level software.
The Vega Project 1. Design goals: • Design and implement Grid-level software. • Build a national-scale infrastructure supporting HPC. • Develop application running on testbed. 2. Grid-oriented superservers—Dawning 4000, 5000,etc. 3. Service Grid

5

6 Stress Distribution of 3800TEU

7 500hPa Contours in Weather Forecasting

8 The Vega Grid Topology It is Router-centered structure:

9 The Vega Grid Computing Protocol

10 The Vega OS Vega OS overview client commands.
1, A user-level middleware running on client machine • Vega GOS constructed by 2 components: GOS and gnetd - GOS is a daemon running on client machine. - gnetd is a daemon on grid server response to client commands.

11 gridclose(): close a connected grid. ……
Grid process and Grid thread - Grid process is a unit for managing the whole resource of the Grid. - Grid thread is a unit for executing computation on the Grid. 2, Vega APIs introduction Vega GOS APIs - GOS APIs for application developers grid(): constructs a Grid process on client machine. gridcon(): grid process connects to Grid system. gridclose(): close a connected grid. ……

12 • gnetd APIs for service developer on Grid servers
- grid_register(): register a service to Grid. - grid_unregister(): unregister a service. …….

13 The Vega Grid Batch System
- A GOS-based application. - No central control - shell commands: > gsub > gstat > gkill, ……

14 - All kinds of resources registered in Grid.
> Computational resources: cycles, mem, disk, networks…… > software: DB, CAD…… > services: ftp, http, mail……

15 Global Batch System in Vega Grid

16 Travel-An Online Transaction system
An online transaction system----travel in China GOS-based application 4 different basic services registered in the Grid. * Wheather forecasting * airline ticket booking * sight spot ticket booking * charging - Putting these 4 services into an application

17

18

19 The National HPC Project
Overview - Set up 9 HPC sites across China - Interconnected these 9 sites with available networks ( Cernet & NSTTet) - equipped each site with Dawning 2000/3000, Galaxy 3(20Gflops), Sunway 1(460Gflops), PC-cluster(8Gflops)

20

21 Overview of the Grid System Software
A function layer on top of node OSs. Management of resources, users and tasks. Authentication and authorization. Hardware-enhanced encryption. Web –based user interface.

22 The Grid System Software

23 User Management

24 Job Management(submit)

25 Resource Management (Find a User)

26 The Grid System Monitoring

27 The Grid Utilities

28 The Grid Applications Weather forecasting.
Petroleum reservoir simulation. Bio-information database and applications. Numerical wind tunnel simulation. Automobile collision simulation. Ship structure analysis. National scientific databases and applications. Digital library.

29 Internet NHPCE Gigabit IP Network Audio Notebook HPC BP, Mobile phone
Video Camera Tel. Game TV DVD PC Internet Gigabit IP Network Node DB Info lib. Instr. NHPCE

30 International Cooperation
Joint research supported by European and China. Source sharing - Computing power - Database - Software tools - Application software

31 The Scientific Data Grid Project
Build on the top of scientific databases. Belong to CAS, but open to the world. Plan to provide service in

32 Scientific Database(SDB)
SDB funded by CAS since 1986. SDB is a collection of multiple disciplinary databases, including chemistry, biology, geography, astronomy, ecology, etc. By 2005, there are member institutions across China. databases which is distributed and heterogeneous. - 10TB+ data volume size.

33 Why do SDG? Resource level—sharing and development.
- make data more accessible. - data integration - and more easy to do: data->information->knowledge. Application level—emerging applications - can do what we can not do before. - cross multiple databases/multiple disciplines. - require more resources ( cycles, bandwidth, instrument, etc.)

34 Tasks Build testbed Middleware - information service Applications
- one data center - and three sub data center. Middleware - information service - security - user interface Applications - Chemistry/Geo-science/astronomy/biology…

35 Data Center (CNIC) Cluster 16 nodes 15TB
Bio Center Cluster 8 nodes 1-2TB Beijing SDG Resources: TB PC Clusters CSTNET 1000M Data Center (CNIC) Cluster 16 nodes 15TB 1000M Chemistry Center Cluster 8 nodes 1-2TB Shanghai 155M Geo Center Cluster 8 nodes 1-2TB Beijing

36 Supercomputers at CNIC ~2 TFLOPS
Mass Storage Database Application Server MDS Server CA Server Portal Server SDG Data Center Supercomputers at CNIC ~2 TFLOPS

37 Grid Middleware Application GAPI xMDS DRB UAI GSI Local DBMS
applications xMDS GAPI app-oriented, unified program interface DRB coordinated access to multiple data resources UAI universal access interface to single data resource GSI Local DBMS local data management system, could be DBMS or file system databases

38 Projects CAS The tenth five-year program (2001—2005) (37MRMB).
863 program (MOST) A special program (proposed).

39 Collaboration PRAGMA APGrid SDSC KISTI ASCC Texas A&M Univ.

40 HEP Data Grid Currently funded by IHEP, CAS.
Build a BES VO in IHEP campus network environment for BES experiment. Probably Add to CMS and Atlas Vos in the future for CMS and Atlas collaborations. ARGO-YBJ VO for ARGO-YBJ experiment.

41 The HEP Grid Testbed Topology
GIIS Two 6 CPUs PC-FARM GRIS GRIS Condor PBS

42 Current Main Tasks Large Scale Linux Configuration and maintenance—LCFG. Authentication/authority—GSI. Resource Information Management—MDS. Grid Resource Allocation Management—GRAM. Data Replication Management—GDMP. HEP analysis software gridifying—Appln.

43 The Future Work Build IHEP campus Grid computing environment sharing about ten PC-Farms. Promote collaboration with National Grid Projects and international Grid communities Make effort to propose Regional Center 2 project in China.


Download ppt "Sun Gongxing, IHEP, Beijing"

Similar presentations


Ads by Google