1 Vision 2020 Building Updates
Elders Presentation to Congregation Congregational Meeting January 2017

2 History of this Project
Vision planning process Nov 2014 Vision 2020 launched – 125 Anniversary Teams have been meeting to develop plans to accomplish Vision Two particular teams had facility needs in their key targets – these focused on the worship center and the worship center entrance area (lobbies, coatroom, hall, library) Worship & Word, Assimilation -> Property Utilization Committee Jan 2016 $36,000 in 2016 budget for consultation and plans from Clair Solutions (sound and media equipment) and Mann Hughes (architect) Mid Teams worked for Clair Solutions , Mann Hughes and Miller Miller & McLachlan for cost estimates What key targets do the Elders believe the Lord wants CCBFC to hit by 2020?

3 Vision 2020 Key Targets established by the Elders
Gathering & Going Targets Progress in the sound, look, and feel of the 2nd service towards a more energetic, upbeat, expressive, and authentic contemporary worship style in order to speak to the Contemporary segment of our culture Speak to the Traditional segment of our culture in the 1st service by blending traditional music with newer hymns and praise songs Provide an on-staff 2nd Service Worship Leader - also on College Committee report (Staffing or Hire) Upgrade sound system and make architectural changes to worship Center for improved sound (Facility)

4 Vision 2020 Key Targets established by the Elders
Caring (Welcoming / Assimilation) Targets Improve physical appearance and signage for good first impression (Facility) Improve web appearance for a good first impression Recruit and use more and younger greeters for a warm welcome - Also on College Committee results Create a comfortable reception and hang out area for new people and church family (Facility). As teams met to make recommendations on these goals, we learned some things…

5 What we learned Sound system: not designed for contemporary music; 23 yr. old electronics. Ceiling lights: – outdated; close to obsolete. Lights for the speakers face: –shadows and dark spots; incorrect angle (20° vs. 45°); too far away. Lighting control system: – 23 yr. old electronics, some failures starting to occur. The cross & front of church – the cross is covered with a screen during much of the worship time. Baptismal – leaking; pump is obsolete; baptisms are far away and dimly lit. Sound system - has aged and is now in poor condition. Not designed for contemporary music Lights - High energy, incandescent. There is only one company who makes replacement bulbs. Replacing them is a difficult due to the height. Lighting system – for ceiling and platform lights. they have gone out of control several times in last two years. Platform lights - have incorrect angle and “throw”. Lights above platform are behind the front of the stage. Cross – compromise between old school non projector people and projector people. it’s the one from the old chapel.

6 What we learned Platform: undersized for holding a contemporary band, choir chairs, organ, and grand piano. Carpet: 23years old; near end of life. Ceiling: must be accessed from below (must remove pews). Informal meeting areas: needed for welcoming newcomers and fellowship. Windows and entry doors: some are leaking At 23 years old, the Worship Center is aging and needs some repairs What did the teams recommend and the Elders approve as goals? Sound system - has aged and is now in poor condition. Not designed for contemporary music Lights - There is only one company who makes replacement bulbs. Replacing them is a difficult due to the height. Ligting system – they have gone out of control several times in last two years.

7 Recommendations Worship Center – Meeting Area (Sanctuary)
Simplify and update the rear platform wall Create a more modern stone and wood center area behind platform with Cross as a focal point Remove canopies above wall recesses at organ speaker openings Remove baptismal and use portable baptistery that can be closer to the congregation Video screens on left and right sides so The Cross is visible during worship Extend Platform and remove most of the steps (only two sets on left and right sides of platform) New Flooring: Carpet in aisles and tile under pews

8 Recommendations Worship Center – Meeting Area (Sanctuary) con’t
Paint all walls and ceiling New acoustically better entry doors Update sound system Update video equipment New ceiling lighting – hanging grid style New platform lighting – also from grid Examples

9 WC Example #1 – Hershey E Free
Note ceiling and pipe Grid. Ignore Blue light in center

10 WC Example #2 – Hershey E Free

11 Recommendations Lobbies (Inner and Outer Narthex) and Other Areas
New Front Entry Doors and new windows in Lobby Atrium space Remove the wall between the coat rack and library Remove Walls and Doors Between Inner and Outer Lobbies, Library and Corridor and Coat Room and Lobby to create opening concept flow in Lobby Atrium space Add millwork cabinets, counters, and sink as a possible Café area with Coffee prep. Create Seating areas with table seating and Lounge Seating surrounding new double sided Fireplace

12 Recommendations Lobbies (Inner and Outer Narthex) and Other Areas con’t New flooring throughout – Tile/Carpet creating delineation between circulation and seating areas New Ceiling Tile and Grids in warmer color tone New Welcome Greeter Desk centrally located New Lighting Paint walls Examples

13 Lobby – Computer Generated View #1

14 Lobby – Computer Generated View #2

15 Lobby Example #1 Calvary Chapel of Delaware Valley, Chadds Ford, PA

16 Lobby Example #2 Lifepoint Church, Reiserstown, MD
Corner Coffee/Tea Prep area Note - Wood “Clouds”

17 Dollars and Cents Systems and Equipment from Clair $672,397
Audio $268,785 Video $49,132 Ceiling Lights $101,593 Platform Lighting $146,305 Rigging & Labor $106,580 Worship Center Architectural Changes $500,000 Lobby Architectural Changes $550,000 TOTAL $1,722,397

18 What’s next? Use a portion of our Vision 2020 Fund, up to half, toward the project: approx. $300,000 The other portion is to be reserved for church planting. Raise a significant portion of the remaining $1,400,000 through an internal Funding Campaign Vision 2020 Category on Envelope – you can start contributing now. A gathering in the Spring for fundraising kickoff, detailed questions, answers, and commitments to the project. Listen for regular communications Congregational vote as we get close to project initiation. Borrow some short term money if needed. Depending on amount raised, scale back or extend time of project if needed. Initial target date to begin project: Summer 2018 Sunday service needs to meet in AC for 3 to 4 months