1 Task 4.2 Grid Coordination & DR Activation Module
TECNALIA Joseba Jimeno

2 Task 4.2 Index Task Overview DR Activation and Grid Coordination
Work plan Deliverable D4.2 Current status Issues

3 T4.2 -Task Overview Objective: Duration: Partners involved:
“Design tools required by the DSO to operate the network in a safe and optimal way. These tools provide the link between the network operators and their requirements of flexibility from the customers” [DoW] Duration: Start: March 2013 (M6) End: September 2014 (M24) Partners involved: TECNALIA (8 pm), ENG (6 pm), PPC (5 pm), ALMENDE (4 pm), ETC (2 pm) Deliverables: D4.2 “Grid Coordination & DR Activation based on multi-agents framework Modules” (M24)

4 T4.2 – DR Activation and Grid Coordination
Architecture of the DSO Control Hub

5 T4.2 – DR Activation and Grid Coordination
Interaction between the DSO and Aggregator Control Hub

6 T4.2 – Work plan Identification of the DR services
Main responsible partner: PPC + ETC Expected deadline: M20 Network operation components Main responsible partner: TECNALIA Expected deadline: M24

7 T4.2 – Work plan DSO-Aggregator communications and data management
Main responsible partner: ENG Expected deadline: M22

8 T4.2 – Deliverable D4.2 D4.2 Compiles results form Task 4.2 and 4.3 (M24) Two separate parts: DSO Control Hub (Task4.2) Aggregator control and optimization (Task4.3)

9 T4.2 – Current Status Identification of the services that the INERTIA Aggregator can provide to the DSO First draft from PPC - Done ETC to review/expand the current draft - Pending Characteristic of the DR - Pending Time from service request to service deployment Duration of the flexibility service Energy to be deployed Reliability requirements

10 T4.2 – Current Status Implementation of network operation components
Network management - Done Restriction analysis - Done DR dispatch calculation - Pending Definition of Demo Scenarios Congestion management: network reconfiguration after a fault - Done Voltage control: high renewable production - Pending

11 T4.2 – Current Status Implementation of the DSO-Aggregator communications and data repository Status??? (ENGINEERING) Reporting for the deliverable D4.2 Task 4.2 Services – First draft Demo scenarios - First draft Description of components – Pending Task 4.3 (ALMENDE) ????

12 T4.2 – Issues Mapping between MV supply points and Local Control Hubs
Integration in the DSO Control Hub: Data repository Communications interface Anything else from ENG side???