Presentation is loading. Please wait.

Presentation is loading. Please wait.

Name of Your Project Your name Target audience for your presentation.

Similar presentations


Presentation on theme: "Name of Your Project Your name Target audience for your presentation."— Presentation transcript:

1 Name of Your Project Your name Target audience for your presentation

2 Connecting Change Management to Business Results
Project Name Purpose Particulars People What is the project Why we are changing What we are changing Who will be changing Payoff – what does success look like and how do we measure it

3 Connecting Change Management to Business Results – 5Ps
Project Name Purpose Particulars People Pay-Offs

4 Why do we need to manage the change well?
What is the potential impact of improving how we manage the change? This slide is your opportunity to link the data about success rates to your project.

5 Health Check – PCT Results
Insert your PCT assessment results from your Impact Index (if you need help copying and pasting your results, please refer to the Breakout Instructions). What were the insights from this assessment? What do you need to do as a result of this assessment?

6 Potential consequences to the organisation if this change is poorly managed
What is the risk to the organisation if this change fails?

7 Change characteristics
Risk assessment grid Change Medium risk High risk resistant Organizational Attributes Change ready Low risk Medium risk Small Large Incremental Disruptive Change characteristics

8 Impact assessment by group
Insert your Group Report – Degree of Impact visuals This is an example only. Use your own data! What insights did you gain from this data?

9 Team structure and sponsor model
Create your combined team structure and sponsor model Use and adapt the visuals that are provided in the “Library of Figures” (the PowerPoint pack that you downloaded from the Prosci Practitioner eToolkit)

10 Change management team preparation strategies
What type of training will your team need in change management? What components of change management represent the largest gaps for your team?

11 Anticipated resistance
Impacted Group Risk / Challenge Mitigation Approach Where do you expect to encounter resistance and why? What can you do to mitigate resistance?

12 Sponsor assessment diagram
This diagram is the number one predictor of success or failure for a project. Take a photo of your sponsor assessment diagram and put it on this slide, or bring your flip chart paper with you tonight. Summarise the sponsorship issues that have been revealed in the sponsor assessment diagram. If you have time, complete the Primary Sponsor and Sponsor Coalition assessments in your Impact Index and add this work to your presentation.

13 Steps for educating sponsors
How will you prepare your business leaders to be effective sponsors?

14 Prosci® ADKAR® Model

15 Current ADKAR Levels of Impacted Groups
Insert your ADKAR Analyzer graph/s here What are the ADKAR challenges for each group? Insights?

16 Communication plan How will you use ADKAR to influence your Communications Plan for one group over the coming 2 -3 months?

17 Sponsor roadmap What are the key actions you need from your Primary Sponsor in the next 4 to 8 weeks? Be sure to address the issues identified in the sponsor assessment diagram. Be specific and make sure you are using your sponsor sparingly.

18 Next Steps

19 Key Insights


Download ppt "Name of Your Project Your name Target audience for your presentation."

Similar presentations


Ads by Google