Presentation is loading. Please wait.

Presentation is loading. Please wait.

***No expected disruptions to normal CDC operations***

Similar presentations


Presentation on theme: "***No expected disruptions to normal CDC operations***"— Presentation transcript:

1 ***No expected disruptions to normal CDC operations***
CHILD DEVELOPMENT CENTER SERVICE ACCESS ROAD REPAIR CDC B308 WHEN: Construction 28 Jun – 2 Aug WHERE: West Side of CDC Bldg, Maintenance Service Access Road from Club Parking Lot WHO: 319th Civil Engineer Squadron POC: Mr. Jim Rosinsky or Capt Ordorica FITNESS CENTER B308 Northern Lights Club Contractor will repair existing curb/gutter and pavements as indicated by the red shaded area. Users are cautioned to avoid areas marked with orange cones. Workers and equipment will be present. ***No expected disruptions to normal CDC operations***


Download ppt "***No expected disruptions to normal CDC operations***"

Similar presentations


Ads by Google