Presentation is loading. Please wait.

Presentation is loading. Please wait.

UPU Reform PAPU Administrative Council May 2017

Similar presentations


Presentation on theme: "UPU Reform PAPU Administrative Council May 2017"— Presentation transcript:

1 UPU Reform PAPU Administrative Council May 2017
© UPU 2017 – All rights reserved

2 Agenda 1- Overview AHGUR mandate Members and observers
2- Summary of feedback and pending issues Overview of current situation Analysis of pending issues 3- Next steps Questionnaire AGHUR work plan

3 Istanbul Congress resolution C 27/2016
1- Overview of AHGUR work Mandate of Ad Hoc Group on UPU Reform Through C 27/2016 ("Management of the work of the Union – Reform of the UPU"), the Istanbul Congress decided to defer examination of reform issues to an Extraordinary Congress, to be convened in 2018 to instruct the CA and POC to apply a series of principles as a basis for their respective structures and decision-making processes that each Council shall meet twice a year, for a maximum total period of 10 working days, with the two councils meeting consecutively to establish an ad hoc group charged with studying and advising on the reform of the Union Istanbul Congress resolution C 27/2016 Ad Hoc Group on UPU Reform (AGHUR) established by the CA at its constituent meeting of 7 October 2016 China appointed as Chairman

4 1- Overview of AHGUR work
75 members/observers worldwide Including 65 member countries 5 Restricted Unions (APPU, PAPU, PostEurop, PUASP, WAPCO) 5 other CA Observers (EU, GEA, Ecommerce Europe, IPPA Italy, eInstituto)

5 1- Overview of AHGUR work
75 members/observers worldwide; 17 from Africa Group 5: Africa Algeria Benin Burkina Faso Cameroon Congo (Rep.) Côte d'Ivoire (Rep.) Guinea Kenya Mauritania South Africa Sudan Togo Tunisia Zambia Zimbabwe Total: 15 Camaroun to be added + PAPU and WAPCO

6 Agenda 1- Overview AHGUR mandate Members and observers
2- Summary of feedback and pending issues Overview of current situation Analysis of pending issues 3- Next steps Questionnaire AHGUR work plan

7 2- Summary of feedback and pending issues Overview of current situation
Body Members Function Congress Member Countries non-permanent "supreme body of the Union" consisting of the representatives of member countries (article 14) CURRENT CA Member Countries "ensure the continuity of the work of the Union in accordance with the provisions of the Acts of the Union" (article 17) POC Member Countries “responsible for operational, commercial, technical and economic questions concerning the postal service“ (article 18)

8 2- Summary of feedback and pending issues Analysis of pending issues
Chairmanship & composition of coordinating body Q1: What is the composition/membership of the coordinating bodies? Chair: Congress host Members: 5 Board Members each from PBC and GBC Chair: ? Members: Chairs and vice-chairs of Councils and standing groups Chair: ? Members: Chairs and vice-chairs of Councils and standing groups Q2: What is the election process for chairmanship and membership of the coordinating bodies? Need for coordinating body Management Committee Joint Mgmt. Committee Mgmt. Committee Board GPC PBC Board CA MC MC POC CA POC Q3: What are the decisions that can be taken at the pillar/commission-level? Pillars Govt. Operational Govt. Operational Govt. Operational CA Proposal France Proposal Germany Proposal Q4: What is the composition of the pillars/commissions? (Election methodology)

9 Q6. Functional separation:
2- Summary of feedback and pending issues Analysis of pending issues Key questions CA Proposal France Proposal Germany Proposal Q5. Legal separation: Should the UPU have legal separation between governmental and operational activities? NO UPU will remain an intergovernmental organization and a specialized agency of the UN Q6. Functional separation: Should the UPU have functional separation between governmental/ regulatory and operational issues? YES "…two commissions with distinct responsibilities: – the Postal Business Commission, mainly responsible for postal operational and technical matters; – the Governance and Policy Commission, mainly responsible for governance, policy and regulatory matters" "…two commissions: a Postal Business Commission and a Regulatory Policy and Governance Commission, with clearly defined roles and responsibilities" "…to develop a structure…with the ultimate objective of creating a distinct decision-making body for governments and operators respectively"

10 Agenda 1- Overview AHGUR mandate Members and observers
2- Summary of feedback and pending issues Overview of current situation Analysis of pending issues 3- Next steps Questionnaire AHGUR work plan

11 3- Next steps Questionnaire: Introduction
Questionnaire content decided in the AHGUR meeting of 6 April 2017 and approved by the CA Plenary through AHGUR’ s report (CA Doc 12) Content of questionnaire revolves around key pending questions identified by AHGUR Questionnaire sent to all UPU member countries Deadline to respond: 22 May 2017

12 3- Next steps Issues to be addressed by the questionnaire: Composition and elections
Section I: Composition of pillars and their coordinating body Coordinating Body Coordinating body: Who are the members? Coordinating body: How is chairmanship determined? Govt./ Regulatory Pillar Operational Pillar Pillars: How many members and how are they elected?

13 Section II: Mid-term Congress
3- Next steps Issues to be addressed by the questionnaire: Mid-term Congress Section II: Mid-term Congress Congress Mid-Term Congress Congress What are the function of mid-term Congress, and should it be a permanent feature?

14 Govt./ Regulatory Pillar
3- Next steps Issues to be addressed by the questionnaire: Functions and decision-making Section III: Decision-making within the pillars and their coordinating body Coordinating Body Coordinating body: What are its functions and decisions? Govt./ Regulatory Pillar Operational Pillar Pillars: What are its functions and decisions? Governmental functions and decisions Operational functions and decisions

15 Section IV: Any other issues
3- Next steps Issues to be addressed by the questionnaire: Any other issues Section IV: Any other issues Section I Section II Section III Any other issues

16 3- Next steps AGHUR work plan
Extraordinary Congress late 2018 Physical meeting June 2017 CA S1 April 2017 CA S2 Oct 2017 CA S3 Mar 2018 2017 2018 Questionnaire 22 May 2017 * Detailed work plan can be found in CA AHGUR Doc 4

17 Thank you ! E-mail: reformahg@upu.int
For Members/Observers: workspaces.upu.int Questionnaire: EN: FR: © UPU 2017 – All rights reserved


Download ppt "UPU Reform PAPU Administrative Council May 2017"

Similar presentations


Ads by Google