WP6 Pilot Set-up, Model Calibration and Assessment Task T6.2 Tertiary Buildings infrastructures installations CNet / CERTH

2 Equipment Procurement / Installation Status per space
Developer’s Office Meeting Room Corridor & Rest Area Kitchen Add Dimmable Lights 3 different zones Replace Lights Actuators Yes Door Double-Beam Sensors Internal Luminance Acoustic Sensors External Temperature + Luminance No RFID TBD Water Heater Refrigerator

3 Sensor Integration / Data Availability Planning
Installation Integration to Linksmart Data Stored in IAM HVAC Monitoring & Control OPC Server OK End of June? Lighting Control EnOcean Actuators / end of June July Lighting Energy Consumption EnOcean clamps / end of June Occupancy Extraction (Kinect, PIR, Double Beams etc.) Provided by CERTH Component Office & Home Appliances Monitoring & Control (PC Screens, printers, Microwave Ovens, etc.) Smart Plugs / end of June Early July Water Heater TBD Refrigerator RFID

4 Software Installations
Local Hub Installed with OPC Client software Testing and configuration in process Local Hub Installed with Linksmart and IoTDevices for EnOcean and Plugwise. Is used for testing of updated components and models (Event and RESTful interfaces) before deployment to CERTH. Plan: Initial deployment of a complete but ”small” Local Hub Gateway by end of June delivering data from a smaller set of sensors Accept and perform control actions for a limited set of actuators by late July Gradual expansion with additional sensors and actuators in September/October

5 Developer’s Office Occupancy Extraction User Profiling Environmental
Kinect Cameras Motion Detectors Door Counters (Pressure mats + Double-Beam) User Profiling HVAC settings + controls Lighting settings + controls (Dimmable) Smart-plugs for PC Screens + Printer Environmental Temperature / Luminance Thermal Zone Magnetic traps on windows Energy Consumption HVAC, Lights Smart Plugs (PC Screens, PC Towers, Printer)

6 Meeting Room User Profiling Environmental Thermal Zone
Occupancy Extraction Motion Detectors + CO2 Door Counters (Pressure mats + Double-Beam) Acoustic Sensors User Profiling HVAC settings + controls Lighting settings + controls Smart-plugs for big screen + laptops Environmental Temperature / Luminance Humidity Thermal Zone Magnetic traps on windows Energy Consumption HVAC, Lights Smart Plugs for big screen + laptop

7 Corridor & Rest Area User Profiling Environmental Thermal Zone
Occupancy Extraction Kinect Cameras Motion Detectors Acoustic Sensors User Profiling HVAC settings + controls Lighting settings + controls Environmental Temperature / Luminance Thermal Zone Magnetic traps on doors Energy Consumption HVAC, Lights Venting Machines Water Heater

8 Kitchen User Profiling Environmental Occupancy Extraction
Kinect Cameras Motion Detectors Acoustic Sensors Appliances Usage through Smart Plug User Profiling HVAC settings + controls Lighting settings + controls Environmental Temperature / Luminance Ventilation Energy Consumption HVAC, Lights Smart Plugs (Refrigerator, microwave ovens, etc.)