1 Supply Chain Customer Order Decoupling Point
Keep Source, Make, Deliver, Return in perspective The point at which inventory is positioned to allow entities in the supply chain to operate independently. The closer the point is to the customer, the quicker the customer can be served Lead times Benefits of being close? Examples? Benefits of being farther? Examples?

2 Decoupling Point Options
Make to stock (in between made and deliver) Served finished goods Assemble to order (right at make) Use preassembled parts to make Make to order (closer to start of make heading towards source) Use raw materials to make Engineer to order (in between source and make) Work w/ customer to design and then purchase materials

3 Little’s Law Long term relationship between the inventory, throughput rate, and flow time A way to predict how many products are consistently in progress If we are finishing on average 50 desks a day and it takes 3 days to build a desk Day 1 = starting 50 Day 2 = continuing 50 plus starting another 50 Day 3 = finished 50, plus continuing 100 Day 4 = Finishing 100 plus starting another 50 Inventory = throughput rate x flow time

4 Assembly-Line Balancing
Objective is to minimize the imbalance between machines or personnel while meeting required output Starts with the precedence relationships Determine cycle time Calculate theoretical minimum number of workstations Balance the line by assigning specific tasks to workstations

5 Wing Component Example
TABLE 9.2 Precedence Data for Wing Component TASK ASSEMBLY TIME (MINUTES) TASK MUST FOLLOW TASK LISTED BELOW A 10 B 11 C 5 D 4 E F 3 C, D G 7 H I G, H Total time 65 This means that tasks B and E cannot be done until task A has been completed

6 Wing Component Example
TABLE 9.2 Precedence Data for Wing Component TASK ASSEMBLY TIME (MINUTES) TASK MUST FOLLOW TASK LISTED BELOW A 10 B 11 C 5 D 4 E F 3 C, D G 7 H I G, H Total time 65 480 available mins per day 40 units required Cycle time = Production time available per day Units required per day = 480 / 40 = 12 minutes per unit Figure 9.12 I G F C D H B E A 10 11 5 4 3 7 Minimum number of workstations = 65 / 12 =5.42, or 6 stations