Download presentation
Presentation is loading. Please wait.
1
WBPDCL An overview
2
WBPDCL-installed capacity 3865 MW
3
WBPDCL At A Glance Incorporated in July 1985
WBPDCL provides 56% of Power Demand of the state. Present installed Capacity – 3865 MW Under construction : Sagardighi Phase – II units of 500 MW
4
GROWTH OF WBPDCL Year Landmarks 1985:
Started with 2 Units of Kolaghat TPS 1995: All 6 Units of Kolaghat TPS started generation 2001: Start of 3 units of Bakreshwar TPP Bandel and Santaldih Stations handed over to WBPDCL 2008: Start of 2 units of Sagardighi TPP 2009: Addition of another 2 units at Bakreshwar TPP Addition of 1 unit at STPS 2011:
5
Year of Commercial Operation
WBPDCL Power Stations Station Capacity (MW) Units Year of Commercial Operation Kolaghat TPS 1260 Stg-I- 3x210 Stg-II-3x210 Bakreswar TPS 1050 Stg-I - 3x210 Stg-II- 2x210 2009 Bandel TPS 455 Stg-I- 4x60 Stg-II-1x215 1983 Santaldih TPS 500 2x250 2009 & 2011 Sagardighi TPS 600 2x300 2008 TOTAL 3865 20
6
Efficiency Parameters
DESCRIPTION Capacity (MW) 3860 Generation (MU) PLF (%) 69.56 61.42 70.54 Availability Factor ( % ) 84.23 79.38 83.79 APC (%) 10.4 11.0 10.3 Oil Rate ( ml/kwh ) 1.89 2.68 1.44 Coal Rate ( kg/kwh ) 0.73 0.77 0.75 Manpower 4418 4467 4339 Man-MW Ratio 1.14 1.16 1.12 12/6/2017
7
Variable cost (Rs./KWH)
TARIFF FOR Power Plant Fixed cost (Rs./KWH) Variable cost (Rs./KWH) Total Cost (Rs./KWH) KTPS 0.54 2.45 3.00 BKTPP 0.93 2.16 3.09 BTPS 0.46 2.70 3.16 STPS 1.34 2.17 3.51 SGTPP 1.10 3.27
8
Projects under Construction
WBPDCL is adding two extension units of 500 MW each which are under construction at Sagardighi TPS and are expected to commence generating power by 3rd quarter of 2016.
9
EER&M Programme WBPDCL has also taken R&M project for Bandel Unit #5 of 210 MW capacity under Energy Efficient Renovation & Modernization (EER&M) programme with world bank assistance.
10
Future Expansions 1. Sagardighi Thermal Power Project (Ph-III)
One no. 500 MW at Sagardighi TPP is proposed during the 12th five year plan. “In principle” clearance from the Government of West Bengal was received for the project. Draft DPR is also under preparation. The existing land at Sagardighi will be sufficient for the proposed project. Availability of Coal is from the Captive Coal Blocks.
11
Future Expansions : 2. Santaldih Thermal Power Station (Ph-III)
In Phase-III, 2 units of 660 MW at Santaldih TPS is proposed during the 12th & 13th five year plan. The project is under consideration by WBPDCL. The project will be constructed in place of 4 units of 120 MW capacity decommissioned.
12
Future Expansions : 3. Bakreswar Thermal Power Project (Ph-III) ‘In principle’ clearance from the Government of West Bengal was received for construction of one additional unit of 660 MW at Bakreswar Thermal Power Project.
13
Coal blocks allotted to WBPDCL
Mine Reserves Gangaramchak Bhadulia 9.15 MMT Barjore 2.34 MMT Barjora (North) 61.11 MMT Panchhwara (North) MMT Tara (East & West) 65 MMT Kasta (East) 95.45 MMT Deocha Pachami 2100 MMT
14
Coal Blocks Allotted To WBPDCL & End Use Plants
S.No. COAL MINE Allotment Order No. Prior Allot tee END USE PLANTS COMMON FOR ALL COAL BLOCKS PLANTS CONFIGURATION CAPACITY 1 Barjora 103/6/2015/NA BECML STPS 2 X 250 MW 500 MW 2 Barjora (North) 103/7/2015/NA DVC EMTA KTPS 6 X 210 MW 1260 MW 3 Gangaramchak & Gangaramchak- Bhadulia 103/8/2015/NA BkTPP 5 X 210 MW 1050 MW BTPS 4 X 60 MW 1 X 210 MW 450 MW 4 Tara (East) & Tara (West) 03/10/2015/NA SgTPP (Unit #1 &2) 2X 300 MW 600 MW 5 Pachhwara (North) 03/12/2015/NA (Unit #3 &4) 2X 500 MW 1000MW
15
Thank You