KwaZulu-Natal Regional Bulk Water Supply
A CONCEPT PLAN Presented by Umgeni Water to the Portfolio Committee on Provincial and Local Government Date: 7 June 2005 Version 4 6 June 2005
2
Introduction & Background
Global targets & challenges: Millennium Development Goal (MDG) is to halve proportion of people without access to a sustainable water and sanitation supply by 2015 Estimated 1.5 billion people without adequate water Estimated 2.5 billion people without adequate sanitation Africa challenges: Estimated one third of 800 million population without adequate water Estimated two thirds of population without adequate sanitation SADC is unlikely to meet the MDGs unless something drastic takes place
3
Introduction & Background (contd.)
RSA targets & challenges : Provision of clean running water to all households by 2008 Provision of decent safe sanitation by 2010 4.4 million people do not have access to formal water infrastructure 10.4 million people have access to below basic water RDP standards Natural disasters-drought conditions in Western Cape and Free State Range of water institutions-some limited in capacity to deliver on targets
4
Introduction & Background (contd.)
KZN challenges: KZN has a population of 9.4 million (2001 census) Of which more than households do not have access to basic water supply standards (RDP standard) Water Service Authorities can partner with the existing Bulk Water Suppliers to provide more sustainable long term solutions ie a REGIONAL SOLUTION, which also supports the country’s macro policies
5
Context Water Service Authorities (WSAs) have a responsibility to provide adequate water services within their area of jurisdiction WSAs generally undertake insular planning and development Backlogs can be addressed through stand-alone schemes. These stand-alone schemes have proven to be unsustainable without continual and direct technical, administrative and financial support Slow pace of delivery largely due to co-ordination, capacity and financial constraints Water Utilities can provide support as Regional Water Service Providers (WSPs) partnering with local, provincial and national government, and other stakeholders
6
Regional Bulk Supply Schemes
Propose that regional bulk supply schemes could be the most appropriate solution to improve water service delivery, although not the only solution Address backlogs Improve level of service Advantage of regional schemes over stand-alone schemes Sustainability of supply Rationalisation Economies of scale Cross subsidisation Water quality Improved level of service Linking water resources to water supply
7
Regional Bulk Supply Schemes
The following assumptions were used in developing the delivery plan: REGIONAL SYSTEMS – Regional bulk water service provider concept APPROACH – Bulk water provision only (abstraction, treatment & distribution) DEMANDS – Demand centres based predominately on population distribution (formal growth/economic development growth points) INFRASTRUCTURE – Utilise existing and proposed water service infrastructure wherever possible RATIONALISATION – Consolidate WTW and distribution systems RAW WATER SOURCE – To be located at highest elevation (gravity vs pumping; improved WQ; reduced sedimentation) WTW LOCATION – Close to abstraction point (minimise non-revenue water losses,maximise opportunity to supply both rural & urban demand centres) DISTRIBUTION – interlink supply system (minimise supply risks ), route to maintain elevations, through demand centres, & along road infrastructure
8
Population Densities Census 2001 data
9
Water Service Backlogs in KZN
Estimated 40% backlog of all households Increase of households since 1996 Census (backlog was 33%) 70% of backlogs located in 7 Water Service Authorities 50% of backlogs located in 4 District Municipalities 50% of backlogs located in 11 Local Municipalities
10
70% of backlogs are within 7 WSAs
11
Backlog Target Areas 70% of backlogs within 7 Water Service Authorities Priority Water Service Authority Priority Area, no households below RDP std Target Area, No. potential household below RDP std A B C D E F G eThekwini Municipality Ugu District Municipality Umzumbe, Hibiscus Coast Msunduzi Local Municipality Umkhanyakude District Municipality Hlabisa,Jozini, Umhlabuyalingana Zululand District Municipality Nongoma, Ulundi Umzinyathi District Municipality Msinga Uthungulu District Municipality Umlalazi 56 425 25 785 69 797 53 581 30 290 29 111 76 828 92 422 62 219 94 951 TOTAL
12
15 Regional Bulk Supply Schemes
Pongola White Mfolozi Black Mfolozi Buffels Upper Thukela Upper Mhlathuze Lower Thukela Lower Mhlathuze Mooi Mvoti North Coast Mgeni 15 Regional Bulk Supply Schemes Mzimkulu Mzintlava South Coast
13
Regional Bulk Supply Schemes
Benefits of Schemes on Job Creation & Poverty alleviation: The schemes to be a chapter in the Provincial Growth & Development Strategy Link into the Provincial Government Integrated Financial Strategy (IFS) which aims to eradicate poverty and inequality, create jobs and facilitate economic growth Link into the Poverty Alleviation Strategy of the second economy Drive service & infrastructure delivery in a sustainable way
14
Indicative Costs of Regional Bulk Supply Schemes
Regional bulk scheme Capital Cost Annual Operating & Maintenance Cost BULK RETICULATION TOTAL (R million) (R million/a) Phongola 200 80 280 0.5 7.0 7.5 White Mfolozi 520 140 660 2.5 13.0 15.5 Black Mfolozi 215 735 5.0 20.0 25.0 Buffels 840 205 1 045 3.5 19.0 22.5 Upper Mhlathuze 250 110 360 2.0 10.0 12.0 Lower Mhlatuze 60 260 5.5 6.0 Upper Thukela 710 210 920 4.5 19.5 24.0 Lower Thukela 410 160 570 3.0 15.0 18.0 Mvoti 480 145 625 13.5 North Coast 530 190 720 1.5 Mooi 150 45 195 Mgeni 700 845 1 545 79.0 81.0 South Coast 500 325 825 30.0 32.0 Mzimkulu 1 350 315 1 665 29.0 33.5 Mzintlava 430 130 560 1.0 7 790 3 175 10 965 35.0 295.0 330.0 NOTE: Reticulation capital cost and the annual operational and maintenance costs are based on yard connections for those households below RDP standard. Since most of these schemes currently do not exist, no refurbishment costs have been included.
15
Regional Bulk Supply Schemes
Estimated Rate of backlog eradication NOTE: Reticulation capital cost and the annual operational and maintenance costs are based on yard connections for those households below RDP standard. Since most of these schemes currently do not exist, no refurbishment costs have been included.
16
Indicative Costs of Water Resource Infrastructure
Existing / Total Regional bulk schemes supplied Infrastructure Proposed Capital Cost (R million) Pongolapoort Dam Existing Pongola Klipfontein Dam White Mfolozi Black Mfolozi Dam 350 Black Mfolozi Ntsingwayo Dam Buffels, Lower Thukela Mfule Dam 100 Upper Mhlathuze Goedertrouw Dam Lower Mhlathuze Spioenkop Dam Upper Thukela, Lower Thukela Middledrift Weir Lower Thukela, Lower Mhlathuze Mvoti-Poort/Isithundu Dam 230 Mvoti, North Coast Hazelmere Dam (raised) 30 North Coast Spring Grove Dam 260 Mooi, Mgeni, South Coast Ngwadini/Lower Mzimkulu Dam South Coast Mzimkulu Dam Mzimkulu, South Coast Mzintlava Dam Mzintlava TOTAL 1 650 NOTE: Mkomazi-Mgeni Transfer Scheme (approx. R4 billion) not included in this table, but is a long-term requirement for the Mgeni scheme.
17
Regional Bulk Supply Schemes
Job Creation Opportunities: Direct Temporary – (6.7 jobs per R million) Direct Permanent: (includes Water & Waste Water Schemes, Reticulation & Associated Services) Estimated Total: 5 000 Assuming a direct to indirect ratio of 1:3 this relates to: Indirect Temporary jobs Indirect Permanent jobs
18
Regional Bulk Supply Schemes
Job Creation Opportunities (contd.) : Multiplier effect arising from water service delivery Agriculture (irrigation, aquaculture) Residential Development (including housing, electricity, roads, communication) Temporary Jobs Direct Permanent Jobs SMME’s through water & electrical servicing (estimate 1 new small business per every 10 electrical connections) Industrial Activity Stimulated
19
BEE Opportunities Expanded Public Works Programme (EPWP) to be applied to the implementation of both bulk and reticulation schemes Infrastructure sector of EPWP emphasizes work creation through labour-intensive construction methods These schemes will be a catalyst to the Water Sector Charter Estimated BEE benefits derived from the construction of the regional bulk schemes: * Includes plant and materials Component Total Component Value (R million) % BEE BEE Component Professional 2 360 80 1 900 Contractors* 4 956 60 3 000 Local Labour 2 124 1 700 TOTAL 9 440 6 600
20
Funding Innovative approach to project financing required
Water tariffs to remain affordable to end-users Integrate plans and funding into Municipal IDPs Possible sources of funding available include: Partially or fully obtained from WSPs Financial institutions
21
Funding Solutions The R11billion to be broken down into the 15 projects and for each project establish: Raw costs for Capex, Opex and Maintenance Direct Revenue Streams Level of financial support required from the various stakeholders (Treasury, Municipalities, Water Utilities, DWAF) The above framework would address critical issues such as - implementation vehicle - specific risk mitigation - affordability of water tariff to end users.
22
Funding Challenge Reduce the project debt – illustrating the effects of R150m per year from 2009 All KZN: Bulk & Retic All KZN: Bulk & Retic with Umgeni Water R150m subsidy
23
Funding Funding Options: What will it look like?
PPP – Concession Structure Leasing Structure - Share Based or Asset Based Funding Sources: Who will finance it? Banks – most flexible but not the cheapest Securitisation Conduits Debt Capital Market – CPP, Bonds (Corporate & Project) Non-banking Intermediaries: INCA & TCTA Development Finance e.g DBSA, DFID (UK) Infrastructure Funds: AIIF, KZN Growth Fund & MIG Financial Sector Charter Factors to be considered: Credit enhancement – Impact on sources and cost of funding
24
Regional Bulk Supply Schemes
Stakeholder consultations to date DWAF : Minister DWAF: DG Provincial and local government : DG & 2 deputy DGs KZN Premier & subsequently KZN full Provincial Cabinet Presidency : (Mr Aboobaker and Mr M Morobe) Other Water Utilities : Uthukela and Mhlathuze Municipalities: Ugu, Illembe, Sisonke, Ethekwini, Msunduzi Financial institutions : RMB, Standard Bank, Investec, ABSA and DBSA National Treasury : DG & Deputy DG Banking Association : (Mr Coovadia) Local Government Housing and Traditional Affairs KZN : MEC KZN Local Government Association – by 10 June Institutional Investors e.g. Public Investment Corporation (To schedule)
25
Regional Bulk Supply Schemes
Progress to date: Technical task team established Representatives from DWAF(KZN), Mhlathuze Water, uThukela Water eThekwini and Umgeni Water Producing a high level business plan Presentation to Municipal Managers, CEOs and EXCOs of water utilities by 30 June 2005
26
Regional Bulk Supply Schemes
Way Forward: Need to drive initiative at : - National Level – targets to met per province - Provincial level – Alignment to be achieved across the province National Treasury to provide a Technical Advisor to the KZN Regional Bulk Supply task team Project action plan and financial packaging to be completed by July 2005
27
Thanks for listening Let’s get to it!