Presentation is loading. Please wait.

Presentation is loading. Please wait.

Azure Everywhere and Assessment

Similar presentations


Presentation on theme: "Azure Everywhere and Assessment"— Presentation transcript:

1 Azure Everywhere and Assessment
FY17 PIE Program Deck

2 Azure Everywhere and Assessment
9/24/2017 8:07 AM Azure Everywhere and Assessment Qualified Partners: Silver or Gold Cloud Platform Competency Partners License Types Sales Stage Workloads Funding Limits Customer Segments Customer Cap All > 20% Microsoft Azure $5,000 per workshop $2,000 per assessment $7,000 for both CAM, CTM, Public Sector, EPG, Major 1 workshop and assessment per customer for each workload © 2014 Microsoft Corporation. All rights reserved. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

3 Azure Everywhere and Assessment
9/24/2017 8:07 AM Azure Everywhere and Assessment Qualified Partners: Silver or Gold Cloud Platform Competency Partners Opportunity Additional Requirements Azure Everywhere is a set of activities (previously administered directly by Microsoft Consultancy Services - MCS) that are now available for select Partners to run. A payment of $5000 is available to Partners that run the following to-Customer (Public Sector, CA or EPG) where there is a reasonable expectation of $30k+ of Azure consumption over 12 months: 1.) Azure Fast-Start - a 4 day on-site, hands-on Azure workshop (or similar activity) aligned to 1 of 6 core scenarios (Operations Management Suite (OMS), Mobile and Web App Development, Azure Foundation, OSS/Linux on IaaS, PowerBI, SQL IaaS), or any other workload of Azure and 2.) A 4 hour session to build a consumption plan with the customer. (sample plan here) (Microsoft will make available all of the content used by MCS in order to ready Partners to deliver Azure Everywhere to customers.) Partners can claim an additional $2k as part of their Azure Everywhere claim in order to do an Azure Consumption Assessment prior to, or as part of the workshop activities. Partners may also claim for workshops leveraging their own IP that align to an Azure workload not included in the readiness and content pack provided in the next slide - however specific Microsoft readiness and content may not be available. Engagement must occur (and POE submitted) within 60 days of PO being opened Proof of Execution requires: 1. Standard POE Assessment form Additional submission of written customer confirmation of on-site workshop 3. Copy of consumption plan (from workshop only). Need help? Contact © 2014 Microsoft Corporation. All rights reserved. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

4 9/24/2017 8:07 AM MCS Content Title Link Accelerate Package - Azure Fast Start for IaaS Foundation Package   Accelerate - Microsoft Azure Fast Start for Modern Application Development Accelerate Package - Azure Fast Start for Dev Test on IaaS Accelerate Package - Azure Fast Start for Identity Accelerate Package - Azure Fast Start for SQL on IaaS Accelerate Package - Azure Fast Start for Website on IaaS Accelerate Package - Azure Fast Start for Website on PaaS If you have trouble accessing these Fast Start links the process will be located on the Partner Incentives and Investments Yammer site: © 2014 Microsoft Corporation. All rights reserved. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

5 POE Requirements 1 2 3 4 POE must either:
Include a physical customer signature and a) be printed on customer letterhead OR b) include a customer stamp Include an from the customer’s domain with all POE details and the customer’s name and domain in signature POE must include the below details : I’m writing to confirm that <INSERT PARTNER NAME> has delivered a 4 day on-site workshop around (provide the specific workload). In addition, <INSERT PARTNER NAME> has delivered the following services (provide one of the below) List out services that the partner has provided to you OR Attach the section of the SOW that details the services (please initial next to the services delivered) Note that the entire SOW does not need to be attached OR Attach a copy of the PO that details the services (please initial next to the services delivered). I confirm that the project started on <DATE> and completed <DATE> 1 2 3 4 POE must include a copy of the consumption plan created with the customer. (required for workshop option - not required when only assessment is conducted) Required Fields Example Date Today’s date To: Microsoft employee’s name and Jane Smith From: Customer Contact Name Mr Customer Name Customer Contact Title Sales Executive Direct Phone number for customer contact name Direct address for customer Contact Name Customer Company Address Details ABC Co Ltd 123 Road, Suburb, Country

6 9/24/2017 8:07 AM © 2014 Microsoft Corporation. All rights reserved. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.


Download ppt "Azure Everywhere and Assessment"

Similar presentations


Ads by Google