Presentation is loading. Please wait.

Presentation is loading. Please wait.

William V. Richardson Jr. and John T. Barrera Unit Issue Process Defense Property Accountability System (DPAS) Warehousing Application United States Marine.

Similar presentations


Presentation on theme: "William V. Richardson Jr. and John T. Barrera Unit Issue Process Defense Property Accountability System (DPAS) Warehousing Application United States Marine."— Presentation transcript:

1 William V. Richardson Jr. and John T. Barrera Unit Issue Process Defense Property Accountability System (DPAS) Warehousing Application United States Marine Corps Individual Issue and Unit Issue Facility (IIF and UIF) Implementation Training Course

2 Purpose Provides the capability to issue non-individual and special training allowance items for use by an unit.

3 Background Required for initial setup: A.Use the UIC process to add the Unit Identification Code (UIC) that will receive the equipment. B.In the Member Profile process, the member signing for the equipment must have the UIC receiving the equipment entered as either the Assigned UIC or Temporary Assigned UIC. C.Use the UIC Custodian process to establish a Primary or Alternate Custodian to sign for the equipment.

4 Situation You are a Line Clerk at the UIF. After validating a requirement to issue equipment to a Unit Custodian, process the Unit Issue.

5 Unit Issue Navigate to the Materiel Mgmt > Unit Issue: 1.Click on. 1

6 Unit Issue 1.Click on. 1

7 Unit Issue 1.Input the Head Count. 2.Input the UIC and UIC Custodian (RO). 3.Input the Requested DT/Tm. 4.Click  Other fields are optional, but recommended. (i.e., Est Return Dt, Cost Center, Personnel, Staging Location, etc.)  The Master Issue List can be used for known issues of special equipment (i.e., cold weather training package, etc.). 1 2 3 4

8 Unit Issue 1.Check the box for the newly added issue. 2.Click the button next to and select. 1 2

9 Unit Issue 1.Click the button next to and select. 1

10 Unit Issue 1.Insert NSN in Stock Nbr field and click, then click. Repeat this action for each additional NSN. 2.Click the tab to review all selected NSNs, then click. 1 1

11 Unit Issue 1.Click the button next to and select. This is mainly used for sized items. 2

12 Unit Issue 1.Insert TAMCN in LIN/TAMCN field and click, then click. Repeat this action for each additional TAMCN. 2.Click the tab to review all selected TAMCNs, then click. 1 1

13 Unit Issue 1.Click on then click to view On Hand Qty, Alloc Qty, and Available Qty from the current inventory. 1

14 Unit Issue 1.Click on next to,then click on. 2.Click to create the pick plan in Materiel Movement. 1 2

15 Unit Issue 1.Click on the Pick Nbr hyperlink to go straight into Materiel Movement > Plan. 2.Make note of the Request Nbr and Document Nbr. 1 2

16 Unit Issue 1.Click on. 2.Click on. 1 2

17 Unit Issue 1.Select items by checking the select box(serial number or quantity). 2.Click on tab to review all selected inventory then click.. 2 1

18 Unit Issue 1.Review all items for accuracy, click,click, then. 1

19 Unit Issue 1.Navigate to Materiel Mgmt > Materiel Movement > Pick. 2.Note the Pick Status, then Click on. 2 1

20 Unit Issue 1.Check the All box, then click. 2.Click on.  Review all columns for accuracy, edit locations individually through edit or use the Mass Edit Location or Container area, increase the items per page to view all picks, and utilize the print option for a pick list. 1 2

21 Unit Issue 1.Click, then click. 2.Click.  This is the last chance to edit or cancel the pick. Note the Status. 2 1

22 Unit Issue 1.Navigate to Materiel Mgmt > Unit Issue > Request. 2.Select the check box on the appropriate request. 3.Click the button next to and select. 1 2 3

23 Unit Issue 1.Click, select All, then click.  Kit components must be verified before completing the issue. Each kit is verified individually. Note the status in Kit Verified? column changing from No to Yes once verified. 1

24 Unit Issue 1.Select item rows that have 0 quantities in the Requested Qty column, then click. 2.Click.  These lines are left over from sized items that are not used when using the LIN/TAMCN. This is not a problem when using Stock Nbr or the import method of bringing in items. 2 1

25 Unit Issue 1.Click next to, click, then click to generate the Unit Issue Receipt. The act of signing completes the issue process. 1

26 Unit Issue 1.To generate another issue receipt Click next to, then click a form from the selection. Note the Issue Status. 1

27 Questions?


Download ppt "William V. Richardson Jr. and John T. Barrera Unit Issue Process Defense Property Accountability System (DPAS) Warehousing Application United States Marine."

Similar presentations


Ads by Google