HMA 23 Feb 2011 – Slide 1 Daniele Marchionni TELESPAZIO HMA Follow On Task 4 - Order 23 February 2011.

Similar presentations


Presentation on theme: "HMA 23 Feb 2011 – Slide 1 Daniele Marchionni TELESPAZIO HMA Follow On Task 4 - Order 23 February 2011."— Presentation transcript:

1 HMA 23 Feb 2011 – Slide 1 Daniele Marchionni TELESPAZIO HMA Follow On Task 4 - Order 23 February 2011

2 HMA 23 Feb 2011 – Slide 2 Task 4 – Agenda  Task 4 Activities Status: Status of Deliverables Order SWG Status Reference Order Server – OPGW - Status ETS Status

3 HMA 23 Feb 2011 – Slide 3 Task 4 – Activities Status - Deliverables  Deliverables for AR Configuration Item Data List (CIDL): DIL in the SDP document Non Conformance Reports (NCRs): none HMA Ordering ICD (including ATS):  Ordering Services for Earth Observation Products OGC 06-141r5 V0.9.8 10/01/2011 Ordering Services for Earth Observation Products - Executable Test Suite (ETS) – (Technical Note)  Already delivered at MTR

4 HMA 23 Feb 2011 – Slide 4 Task 4 – Activities Status - Deliverables  Deliverables for AR OPGW Software Installation Document:  OPGW SID V1.1 07/02/2011 OPGW Software Requirements Specification:  OPGW SRS V1.2 28/01/2011 OPGW Software Design Document:  OPGW SDD V1.2 28/01/2011 OPGW Software Validation Testing Specification:  OPGW SVS V1.1 28/01/2011 OPGW Acceptance Test Reports:  OPGW ATR V1.0 28/01/2011 OPGW SW:  OPGW V5.0 07/02/2011

5 HMA 23 Feb 2011 – Slide 5 Task 4 – Activities Status - Deliverables  Deliverables for AR Order Server Installation Plan (isn’t the already delivered Software Installation document ?)

6 HMA 23 Feb 2011 – Slide 6 Task 4 – Activities Status - Deliverables  Deliverables for Delta AR Ordering Services for Earth Observation Products - Executable Test Suite (ETS) – (CTL Scripts)  To be provided at Delta AR ETS Execution Report  To be provided at Delta AR OPGW SW:  OPGW V5.1 by 04/03/2011

7 HMA 23 Feb 2011 – Slide 7 Task 4 – Activities Status - SWG  Ordering Services for Earth Observation Products SWG  OGC 06-141r5 V0.9.8, 10/01/2011  Public Comments Period expires today 23/02/2011, only one comment received up to now and solved (.NET code generation)  TPZ is issuing a comment summarizing the issues noticed during development.  Bonn OGC TC Meeting Attendance

8 HMA Reference Order Server Status  With respect to OPGW 5.0 the following progress has been achieved: UM ICD V0.0.6 (SAML Token, encryption, digital signature) implemented and tested; GetQuotation operation implemented & tested (sync & async quotation implemented) Cancel operation implemented & tested (sync & async behavior implemented) DescribeResultAccess implemented (returns a preconfigured file) Join with SPS Implementation (on-going):  Setting up a stub SPS EO server answering to GetStatus operation  Setting up SPS EO client code in the Order Server. 23 Feb 2011 – Slide 8

9 HMA ETS Status  TPZ to verify the effort needed for completing the activity. 23 Feb 2011 – Slide 9