Green Fields or Green Energy R140 | G214 | B0R58 | G117 | B196R0 | G38 | B73 If the title contains only one line a carriage return must be added so as.

Similar presentations


Presentation on theme: "Green Fields or Green Energy R140 | G214 | B0R58 | G117 | B196R0 | G38 | B73 If the title contains only one line a carriage return must be added so as."— Presentation transcript:

1 Green Fields or Green Energy R140 | G214 | B0R58 | G117 | B196R0 | G38 | B73 If the title contains only one line a carriage return must be added so as to align the text with the logo Green Fields or Green Energy Don Prentis Renewable Energy & Emissions Trading Manager ENERGEX Retail Pty Ltd

2 R140 | G214 | B0R58 | G117 | B196R0 | G38 | B73 Green Fields or Green Energy If the title contains only one line a carriage return must be added so as to align the text with the logo Green Energy What is Green Energy Energy from a sustainable or renewable source, converted to electricity by some technological process.

3 R140 | G214 | B0R58 | G117 | B196R0 | G38 | B73 Green Fields or Green Energy If the title contains only one line a carriage return must be added so as to align the text with the logo Green Energy Why is it? Demand for renewable energy for environmental concerns e.g.: ENERGEX’s earth’schoice (Green Power  ) To meet compliance with various measures or legislation e.g.: Renewable Energy (Electricity) Act 2000 Impending global imperative …. Kyoto Protocol

4 R140 | G214 | B0R58 | G117 | B196R0 | G38 | B73 Green Fields or Green Energy If the title contains only one line a carriage return must be added so as to align the text with the logo Green Energy Which paradigm : Waste or Resource Energy industry paradigm Waste  Energy Cultural paradigm Resource recycling

5 R140 | G214 | B0R58 | G117 | B196R0 | G38 | B73 Green Fields or Green Energy If the title contains only one line a carriage return must be added so as to align the text with the logo Green Energy Competitive Technologies Biomass Hydro Wind Solar

6 R140 | G214 | B0R58 | G117 | B196R0 | G38 | B73 Green Fields or Green Energy If the title contains only one line a carriage return must be added so as to align the text with the logo Green Energy Competitive Fuels Biomass Green Waste (including wood waste) Energy crops or crop waste Food & agricultural wet wastes Sewerage Solid Waste Gas Landfill Gas

7 R140 | G214 | B0R58 | G117 | B196R0 | G38 | B73 Green Fields or Green Energy If the title contains only one line a carriage return must be added so as to align the text with the logo Green Energy Competitive Fuels Hydro Dammed water ‘Run-of-river’ Wave Tide Wind Solar Photo-voltaic Thermal

8 R140 | G214 | B0R58 | G117 | B196R0 | G38 | B73 Green Fields or Green Energy If the title contains only one line a carriage return must be added so as to align the text with the logo Economics Renewable Energy Certificate Price Renewable Energy (Electricity) Act 2000, effective cost of charge $57.14 Competitive advantage derived from lower REC cost Impact of electricity revenue (locational impact) e.g.:..$60 project with $30 electricity revenue yields $30 REC..$60 project with $35 electricity revenue yields $25 REC

9 R140 | G214 | B0R58 | G117 | B196R0 | G38 | B73 Green Fields or Green Energy If the title contains only one line a carriage return must be added so as to align the text with the logo Economics Project Economics Electricity revenue$30 RECs revenue$25 Total revenue$55 Capital and Operating Expenditure$50  Fuel $5 $5  1.2 tonne ‘green waste’ per MWh = $4.17/tonne green waste

10 R140 | G214 | B0R58 | G117 | B196R0 | G38 | B73 Green Fields or Green Energy If the title contains only one line a carriage return must be added so as to align the text with the logo Economics CO 2 e Trading Sell 1 tonne emissions credit (approximate avoided CO 2 e from 1 MWh of renewable energy generation) $3.00 per tonne  $2.50 per tonne green waste


Download ppt "Green Fields or Green Energy R140 | G214 | B0R58 | G117 | B196R0 | G38 | B73 If the title contains only one line a carriage return must be added so as."

Similar presentations