* building area 10,000 ㎡ / total floor space 4,000 ㎡  Factory construction (Partial)  Utility facility  Manufacturing facility  Row material appliance.

Similar presentations


Presentation on theme: "* building area 10,000 ㎡ / total floor space 4,000 ㎡  Factory construction (Partial)  Utility facility  Manufacturing facility  Row material appliance."— Presentation transcript:

1

2 * building area 10,000 ㎡ / total floor space 4,000 ㎡  Factory construction (Partial)  Utility facility  Manufacturing facility  Row material appliance  Packaging facility  Laboratory appliance 200 85 105 7 585 61 (Unit : Thou U$) Total 890 85 734 10 585 61 1 Alt2 Alt 915.51,883

3  Factory construction / Utility facility (Unit : Thou U$) Sorting Details Cost Maker 1 Alt2Alt Factory design cost construction engineering works construction works electricity work communication works10 China fire-fighting works40 China machinery works 220China utility 225China waste-water treatment70 China manufacturing work- bench 45China expenses on construction 200China warehouse rack50 China laboratory bench30 China subtotal200890 Utility air compressor40 Korea machinery vacuum package15 Korea chiller30 China subtotal85

4  Factory construction / Utility facility

5  Manufacturing facility (Unit : Thou U$) Sorting Details Cost Maker 1 Alt2Alt Manufacturing agi homo mixer / 2000kg 150Korea facility agi homo mixer / 500kg 80Korea agi homo mixer / 300kg70 Korea agi homo mixer / 100kg X 2 92Korea agi homo mixer / 50kg 38Korea agi homo mixer / 80kg 35Korea agi homo mixer / 30kg25 Korea paddle mixer / 1000kg 15China dispersion mixer10 China three roll mill 25Korea flow meter 20Korea micro filter 7Korea reverse osmosis system 55Korea platform balance 3China lifter 3China dust collector 5China powder mixer / 200 liter 40Korea powder mixer / 40 liter 33Korea atomizer 20Korea powder mixer / 5 liter 8Korea subtotal105734

6  Manufacturing facility

7  Row material appliance / Packaging facility

8  Raw material appliance / Packaging facility (Unit : Thou U$) SortingDetails Cost Maker 1 Alt2Alt Raw material balance11Korea appliance drum lifter 3China weighing vessel33China store vessel33China subtotal710 Packaging pouch filling machine70 Korea facility tube filling machine80 Korea lip stick filling machine80 Korea lip gloss filling machine80 Korea sample filling machine110 Korea rotary filling machine30 Korea vacuum filling machine20 Korea volumetric filling machine20 Korea volumetric filling machine20 Korea wax filling machine10 Korea volumetric filling machine10 Korea bulk transportation pump10 Korea container cleaner10 Korea jet printer10 Korea conveyer55China the others20 China subtotal585

9  Laboratory appliance

10 (Unit : Thou U$) SortingDetails Cost Maker 1 Alt2Alt Laboratory rheometer27 Korea appliance incubator17 Korea balance22Korea hydrometer33Korea viscometer44Korea ph meter33Korea laboratory hood22China clean bench2.5 China subtotal60.5

11  공장운영방식에 따른 설비 투자규모 내역 1. 제 1 안 : 제니코스에서 제조한 벌크 (Bulk) 를 수입하여 충전, 포장하는 방식 @ 총투자금액 : 919,5000 USD$ 2. 제 2 안 : 중국에서 자체생산 가능하도록 하는 제조, 충전, 포장 공장 운영방식 @ 총투자금액 : 1,883,000 USD$ 3. 설비구분 : 중국산과 한국산 설비조달 가능 유무를 표시한 것입니다. - 중국산 설비구입가격은 한국산 설비구입가격의 50% 로 계산한 것입니다. ※ 참고로 공장건설 투자비는 제외 하였습니다 : 운영방식이 확정되면 현지에서 결정하도록 하십시오.  기술자 파견비용 1. 공장 건설시 파견비용 1) 파견비용 : 국내연봉 6 천만원 기준, 년 근무일수 295 일 ( 참고 : 1ManDay 비용은 약 \200,000 입니다 ) 2) 중국 현지 체제 비용 일반적으로 월 6 천원 ~ 1 만원 ( 인민폐 ) 이며, 귀사에서 부담합니다. 현지 체제 비용 외에도 숙식 및 업무에 따른 교통편 제공 등도 부담하여야 합니다. 2. 공장 운용시 파견비용은 공장 건설시 파견 비용과 동일하게 적용됩니다. ( 구체적인 내용은 협의후 결정 ) 3. Technical Assist 비용은 별도로 규정하는 것으로 합니다.


Download ppt "* building area 10,000 ㎡ / total floor space 4,000 ㎡  Factory construction (Partial)  Utility facility  Manufacturing facility  Row material appliance."