Presentation is loading. Please wait.

Presentation is loading. Please wait.

Computer Integrated Manufacturing Department of Industrial & Systems Engineering.

Similar presentations


Presentation on theme: "Computer Integrated Manufacturing Department of Industrial & Systems Engineering."— Presentation transcript:

1 Computer Integrated Manufacturing Department of Industrial & Systems Engineering

2 Production System

3 Four major production types 1) 개별공정 (job shop) 2) 흐름공정 (flow shop) 3) 프로젝트 공정 (project shop) 4) 연속공정 (continuous shop)

4

5 Job Shop Layout

6 Manufacturing time in Job shop

7

8 Robot Centered Cell

9 Production Types by Quantity 1) Low production ; Less than 100 item 2) Medium production ; 100 ~ 10,000 item 3) High production ; greater than 10,000 item

10 Production Quantity VS Variety

11 1) Low Quantity Production job shop type, customized product, large variety of product type ex) space capsules, airplane, special purpose machine maximum flexibility

12 1) Low Quantity Production fixed position layout type (big product) process layout type – functional layout lots of movement and WIP

13 2) Medium Quantity Production product range 100 ~ 10,000 item Large product variety; batch production type

14 2) Medium Quantity Production Facility changed after I production, order repeatable production rate higher than single product type Facility utilized commonly by lines Batch changing time is required for setup time (changeover time)

15 2) Medium Quantity Production Product variety is not large When setup time is small, various part groups are produced in a facility Cellular layout type composed with various machines and work stations

16 3) High Quantity Production mass production (greater than 10,000 items) i) quantity production : production with a single machine Production with specialized purpose machine

17 3) High Quantity Production ii) flow line production Composed with several workstation Each workstation composed of special machine Conveyor belt used ex) automobile, appliance assembly Good for single model production

18 Production Types (discrete product)

19 CIM Background Various tastes of customers Reduction of cycle time Requesting integrated systems for improving both technology and quality

20 Computer Integrated Manufacturing? Integrated systems of functions in factories that are production, marketing, order, design, production control, inventory control, quality control, inspection, shipping, through communication and producing technology

21 CIM Model

22 CIM Computer – database Integration – Network Manufacturing – rapid development of new products CIM; conceptual rather than physical Island of Automation; partly automated but not integrated Objectives of CIM; managing enterprises

23 Elements of CIM Information technology: Computer, Communication, Control Manufacturing technology: Manufacturing, Market, Management 3Cs support 3Ms

24 Elements of 3Cs Computer: IT, OS, programming language, database, artificial intelligence Communication: communication technology, MAP, TOP, LAN, VAN Control: control technology, algorithm, S/W for control

25 Targets of CIM Developing high quality products with low cost Integration and control of product design and manufacturing processes Easy financial management Increasing volume of sales

26 Benefits of CIM Marketing Engineering design Research and Development Manufacturing processes Financial planning

27 Manufacturing system Manufacturing system: facility + production technology + management Applying GT, CAPP, TMS to Production technology Applying MRP, JIT to Management Wide manufacturing system: facility + production technology + management + product design + business plan

28

29 Integrated Production System(ex)

30 Factory automationCIM philosophyautomationoptimization targetunmanned factoryrationalize exampleFMC, FMSLinking CAD, CAM, MRP element processing, material flow, measurement, inspection, assembly, CAD, CAM, CAPP, CAQ, MRP targetfactoryenterprise focushardwaresoftware humanreplacing humanreorganization originJapanUSA, Europe

31 Function of CIM 1) Order information and automatic scheduling through computer - dealing individual orders of various products - control of due dates - preparing production planning 2) Inventory control through JIT - minimizing raw material, WIP, inventory - utilizing bar code, RFID

32 3) Statistical quality control - quality improvement 4) Monitoring facility, process - data collection for facility operating - report for producing defective goods - records & analysis of failing facility

33 5) Data collection for MIS - WIP data - shipment data - direct & indirect labor data - production control data ; defective rate, operation rate, failure rate, production rate - supplier record; quality, acomplishment - defective production data

34 6) Managing MIS Data - reducing indirect cost - rapid decision making using database 7) Diagnosing failure - minimizing down time - details of failure (problems)

35 8) Managing Technical Data, Document - managing S/W program - tool life data - quality data - product history - document update 9) Standard

36

37

38 CIM Hierarchy 1 st Level: production facility CNC, Robot, PLC 2 nd Level: Work Cell controlling 1 st level activity applying data from 1 st to process, production, quality control

39 3 rd Level: Area level managing several lines production plan, facility maintenance scheduling, assigning material, facility 4 th Level: Factory level controlling function of whole factory, inter- factory sales control, wages, finance, long term production plan, marketing, customer services

40 Standardization for CIM Capability of information transfer for different types of facilities CIM Standard ISO standard – 6 levels: Enterprise, factory, area, cell, station, equipment

41 Manufacturing Automation Protocol - GM Communication b/w different types of facility Factory level network for machine device, robot, PLC, Computer 7 levels

42 Technical & Office Protocol – Boeing, NBS Data communication for different types of devices b/t office and design Spread sheet, draft drawing, design, business document, e-mail

43 Initial Graphics Exchange Specification – ANSI, NBS Data communication b/t CAD system Neutral data file for data transformation b/t different CAD system

44 Product Data Exchange Specification – NIST Transformation of product information for different CAD system Shape feature – design element Non-shape feature – processing, inspection, assembly, material, heat treatment, strength

45 Standard for External Representation of Product Data ISO Workgroup TC 184/SC4 International standard for representing product model and data exchange format

46

47 Function of CIM Upper Level – Planning, management, control – discrete time information slow response time Lower level – action - continuous time information rapid response time

48 Upper Level Allocation

49 Enterprise System Production planning & control Information technology management Plant Control System Scheduling Material resource planning Quality control

50 Optimization at Upper Level Production plan N production center – m types of products B1, b2, ……. bm Linear programming S.t.

51 Transportation Plan From L warehouse to k warehouse, e1, e2, e3, …………, ek transport Linear programming

52 Elements of Upper Level of CIM at Enterprise, Factory, Area CAPP MRP Capacity Planning

53 Computer Aided Process Planning Priority for process Machine tool, process parameter Not consistent for manual planning Retrieval type – GT code Generative type

54 Generative Type process plan for each part Logic for process planning 3D model for product information Utilizing Group Technology Logics for process planning and product information are integrated in database system

55 Material Requirement Planning Inventory control for raw material, WIP, parts MRP - master production schedule file - Bill of Material file - MRP software for application

56 Capacity Planning Evaluating manufacturing capacity Allocating machine, facility, work personnel to MRP Information for Capacity Planning - production plan from MRP - processing order - work order specification - facility - man power

57 Function of CIM at Lower Level Cell, Station, Device Level Cell Controller - production schedule from area level - program selection for task - down load the program

58 Station Controller - Managing PLC, Robot, CNC, sensors - Controlling devices - Controlling processes - Monitoring processes Function of CIM at Lower Level

59 Devices level - CNCs, Robots, PLCs, Sensors, Conveyors Function of CIM at Lower Level

60 Constructing Steps for CIM 1)Controlling production processes - automation for order, supply, manufacturing, inspection, packing, shipping - integration of manufacturing and office management 2) Constructing communication network and database

61 3) Automated processes, assembly, production Reengineering for design 4) Development and manufacture of automated processing facilities Adopting automated recognizing system Constructing Steps for CIM

62 5) Enabling CIM for enterprises with business relationships 6) Introducing: Top down Action: Bottom up Constructing Steps for CIM

63 Obstacles for CIM 1)Communications b/t various companies of suppliers 2)Automated facilities independently 3) Weak solutions

64 Investment for CIM Marketing: managing customers’ report Engineering Design: using CAD R&D: developing new products Manufacturing process: process planning, scheduling, reducing manufacturing lead time Financing: costing

65 Advantages of CIM 1)Reducing developing time for new product 2)Reducing transporting time 3)Optimal inventory control 4)Reducing planning time for production 5)Reducing lead time for production 6)Rapid response for customers’ claim 7)Quality improvement 8)Increasing competitive power

66

67 항목별 비용 절감 효과


Download ppt "Computer Integrated Manufacturing Department of Industrial & Systems Engineering."

Similar presentations


Ads by Google