Active Treatment Industrial Partners
4
Neutralisation reactor Effluent Clarifier/Thickener Mixer/Aerator Neutralisation reagent Clean water Solids Standard chemical precipitation
5
Chemical precipitation
6
Neutralisation reactor Effluent Clarifier/Thickener Recirculated solids Neutralisation reagent Solids Floc reactor Flocculant reagent HDS
7
Bench tests
8
Different neutralisation reagents Ca(OH) 2
9
Different neutralisation reagents NaOH
10
Different neutralisation reagents Mg(OH) 2
15
Shear
16
Pilot Plant First stage reactor Second stage reactor Flocculation
17
Active Plant Horden
18
Passive Treatment Partners
19
Canal Worsley Delph & Bridgewater Canal Influent Pump Bed of sandEffluent
20
Results Flow rate (l/hr) IronRetention Time (Hrs) Approximate Operating Time * Total (mg/l)% Removed 246246 0.4 0.7 0.8 97% 95% 94% 23 11.5 7.7 72hrs 96hrs 72hrs
21
Taff Merthyr IBC design Influent Effluent Bed of pea gravel
22
Results Feed rate (L/min) Average % removed Retention time (hrs) 0.0589%300 2.2581%6.7 2.4093%6.3 2.8588%5.3 10.8051%1.4
23
EPSRC Funded Research Approximately 6 x 4m tank, 2m deep Up to 4l/s (14.4m 3 /hr) flowrate 3 years in the field operation Optimise ochre accretion/filtration Under drainage to aid in ochre thickening