SVD Environmental & Radiation Monitoring L.Vitale on behalf of monitoring group INFN and Univ. Trieste & others L.Vitale - VXD Workshop1Trieste - Sep.

Similar presentations


Presentation on theme: "SVD Environmental & Radiation Monitoring L.Vitale on behalf of monitoring group INFN and Univ. Trieste & others L.Vitale - VXD Workshop1Trieste - Sep."— Presentation transcript:

1 SVD Environmental & Radiation Monitoring L.Vitale on behalf of monitoring group INFN and Univ. Trieste & others L.Vitale - VXD Workshop1Trieste - Sep. 10, 2015

2 News since last meetings I’ll include in the next items/slides the outcome of Tuesday satellite meeting (Slow control, Gemba) Slow control progressing fine for NTC In red critical items Test at thermal mockup shifting toward next year Presence at Beam Test Beast2 phase 1: – 4 diamonds installed (3 sCDV, 1 pCVD) – New Readout Electronics progressing fine (it will be integrated in BEAST phase 1) Trieste - Sep. 10, 2015L.Vitale - VXD Workshop 2

3 News since last meetings: Diamonds Diamonds: – tender for 20 a final stage, tech specs agreed, most documents prepared. 20 will be on our INFN budget this year, 3 diamonds already ordered by Katsuro (maybe one more). INFN budget application for 4 more. – A second 90 Sr beta source 5 MBq arrived and installed for tests – New diamond package fulfills the constraints, discussion has now shifted to cable path for PXD diamonds which require beam-pipe modifications – Patch panels in the DOCKS to be designed (location: outside the DOCKS, sharing for PXD-SVD, ) – Cable path and length Trieste - Sep. 10, 2015L.Vitale - VXD Workshop 3

4 News since last meetings: NTC NTC – New version of mechanical supports (have them here) – Support for L3-4 or directly glue? – Glue for filling gaps and fix sensors. Two procured: Dow Corning SE4445 from Atlas Genova-Bonn and TCOR (Luciano). Other suggestions: DeltaBOND 152 or Hysol 9497 of Loctite company (Tcharlie). – Patch panel for the DOCKS ready, it’s here – NTC opposite face – Routing of the cables – Gluing procedure on the reference NTC (the smaller ones) on the clamps together with the fibers Trieste - Sep. 10, 2015L.Vitale - VXD Workshop4

5 News since last meeting: FOS FOS – All needed splitters (here I have a sample) and a probe for calibrations delivered – Calibration setup improved – Investigation how to accommodate 2 Fibers on inner surface of the half carbon fiber cylinders close to the CDC – Investigation on fibers cables-bundle from docks to E-Hut – Patch panel for the DOCKS – Gluing procedure on the clamps together with the reference NTC (if teflon, problematic) – Humidity fibers Trieste - Sep. 10, 2015L.Vitale - VXD Workshop5

6 News since last meeting: Humidity Humidity (already discussed yesterday) – panel -> now ready – Pump delivered: Thomas 25130110 (70 l/min flux rate) first tests performed Trieste - Sep. 10, 2015L.Vitale - VXD Workshop6

7 BACK-UP Trieste - Sep. 10, 2015L.Vitale - VXD Workshop7

8 BEAST phase 1 installation status LV + Pietro Cristaudo (INFN tech.) Aug. 26 th - Sept. 3 rd As planned we installed: – 8 SMA-BNC connectors – 8 thin cables (3.5 m) with SMA – 4 diamonds with very short cables SMA And we measured electronic noise with: – AH501 pico-ammeter – CAEN PS – Portable PC (all in Rack #4) We also measured a signal with two 90 Sr sources (thanks to Hiro help) Later in November our colleagues will came to test the new readout Trieste - Sep. 10, 2015L.Vitale - VXD Workshop8

9 Installed hardware at the IP Trieste - Sep. 10, 2015L.Vitale - VXD Workshop9

10 Installed hardware at the IP Trieste - Sep. 10, 2015L.Vitale - VXD Workshop10 Location: horizontal plane (behind the bar) z=-95mm z=+132mm same as phase 2

11 New design of shorter diamond package Trieste - Sep. 10, 2015L.Vitale - VXD Workshop11 The design was sent to Tscharlie to see if it fits the available space. The important point for him is that outside the diameter 47mm nothing must disturb the PXD, and it doesn’t. Then the easiest - he proposes - is to press cable and diamond package on the beampipe with a M1.4 screw. Next slides two sketches from Tscharlie with 2D and 3D processing for the cable channel of support on the Beampipe.

12 Sketch a possible 2D processing for the cable channel of support on the Beampipe. Trieste - Sep. 10, 2015L.Vitale - VXD Workshop12

13 Sketch with a 3D processing (more elegant and safer for the cable) Trieste - Sep. 10, 2015L.Vitale - VXD Workshop13

14 NTC final locations and fixing Trieste - Sep. 10, 2015L.Vitale - VXD Workshop14 12 sensor pairs attached to the 12 half-rings supporting the SVD ladders: 4mm alignment holes in half rings L5 and L6, glued L3-4 16 sensor pairs on the inlets and outlets of the CO 2 cooling pipes: on the “streuli connectors” of CO2 inlets-outlets A few (~8) positioned near fibers for cross-calibration

15 New version of the NTC supports Trieste - Sep. 10, 2015L.Vitale - VXD Workshop15

16 Humidity: inputs from Dew Point Sensors Vaisala DMT242B Dew Point Transmitters [-60, +60] o C dew point range Trieste - Sep. 10, 2015L.Vitale - VXD Workshop16 Edgetech Dewmaster Chilled Mirror Hygrometer (for calibrations) Rotameter flux meters Pump Sniffing pipes

17 Prototype system done Trieste - Sep. 10, 2015L.Vitale - VXD Workshop17 Vaisala DMT242B Dew Point Transmitters [-60, +60] o C dew point range Rotameter flux meters Front view Back view

18 Tiny mechanical supports for NTCs Trieste - Sep. 10, 2015L.Vitale - VXD Workshop18 We produced first samples of tiny mechanical supports for the NTC sensors (in order not to glue NTCs directly) I have them here

19 Tiny mechanical supports for NTCs Trieste - Sep. 10, 2015L.Vitale - VXD Workshop19 From a first iteration with Karsten in may at DESY, both were improved: For the half ring ones the “cylinder” can be fixed at the end (screw or fixing rings) For the cooling pipes ones the longer nut Dow Corning SE4445 seems to meet our requirements (rad- hard, thermally conductive, electrically non conductive): Atlas colleagues sent us a sample.