Presentation is loading. Please wait.

Presentation is loading. Please wait.

Thank you for reading this far! We will be in touch shortly with more details, but if you have any questions or suggestions for Simons in the meantime,

Similar presentations


Presentation on theme: "Thank you for reading this far! We will be in touch shortly with more details, but if you have any questions or suggestions for Simons in the meantime,"— Presentation transcript:

1 Thank you for reading this far! We will be in touch shortly with more details, but if you have any questions or suggestions for Simons in the meantime, please do get in touch: Simons Group Ltd 991 Doddington Road Lincoln LN6 3AA 01522 505000 www.simonsgroup.com For more info please contact John Ginnelly, our Project Director email: John_Ginnelly@SimonsGroup.com The latest update on the construction works at MSCP Bridge Street, Riverside Retail & Kingsmead March 2016 Simons Group at Stafford LATEST NEWS Hello from the Simons team! Welcome to the latest news from the Simons Construction project teams working in Stafford; on the multi storey car park (MSCP) Bridge Street, Riverside Retail and Kingsmead. As in previous newsletters, we hope to provide you with the latest news on site and to keep you updated with the next stages of Construction on our sites. We would love more Feedback though so please let us know what you think about how we are doing. Simons Group Ltd 991 Doddington Road, Lincoln, LN6 3AA www.simonsgroup.com As the scheme progresses we will include the layouts for the stores. If you would like to discuss the scheme further please contact: John Ginnelly, Project Director email: John_Ginnelly@simonsgroup.com Considerate Constructors Scheme As a company, Simons are an associate of the Considerate Constructors Scheme, a programme set up to help improve the image of construction. Our Projects will always strive to have a safe and healthy site, with impeccable behaviour all around! If you would like more information of the scheme or if you feel we could improve standards on and around site please do not hesitate to contact us. Alternatively, if you have a project that you would like us to assist with or know of a local organisation which would benefit from speaking to us, or would perhaps enjoy a talk or a site visit, please let us know. The cinema Simons Group are working with our client LXB on pre-construction works to your new Cinema, with Simons Design working alongside our construction team. A start date for the works is still to be confirmed, but we will share this as soon as we know more. Email: news@simonsgroup.com Twitter: @Simons_group Facebook: facebook.com/SimonsGroupLtd KEY FACTS ABOUT THE SCHEMES MSCP | 647 of stilts underneath the Car park - 27m in depth – Roughly 17,469 metres! 0.8 Miles of concrete piles. Riverside | Simons had the largest concrete pump in the UK to create the foundations - 78 lorry loads of concrete delivered in one day - that’s 6.5 lorries each hour! Kingsmead | Zero accidents – Simons have been working on this project for over a year and we are proud to have had no accidents - a huge achievement that shows the level of care taken on our sites.

2 Construction timings: Key dates Whilst we get our heads down and progress with the different schemes, here is what will be happening in the next couple of months… Riverside Retail March We are completing the structure glazing to your new M&S front entrance Simons have started the service areas for the new stores’ deliveries We have starting the paving around the new buildings - this is a great sign - the development is nearing completion! April Completion of paving around the building (the project should start to look completed) The building will be complete and ready for snagging Kingsmead Retail March We will be fencing the car park off to complete the final stage of these works The highways improvement works will be happening throughout March but we are working as fast as we can to open the highways for you April Final works to car park Work on the 2 small retail units will be starting (next to the Morrisons store) If you have any questions, please do let us know We thank you for your patience and apologise for any inconvenience caused by our works Simons Group Ltd 991 Doddington Road, Lincoln, LN6 3AA www.simonsgroup.com http://tinyurl.com/simons-stafford For more info please contact John Ginnelly - Project Director email: John_Ginnelly@simonsgroup.com Our Project Team Project Director – John Ginnelly Commercial Manager – Mark Richardson Lead Design Manager – Bryan Walker Document Controller – Christine Ward MSCP – Bridge Street Project Manager – Garry Boot Site Manager – Robert McGil Commercial Manager – Mark Richardson Quantity Surveyor – James Burnett Site Engineer - Paul Anderson Riverside Retail Project Manager – Steve Newell Site Manager – Mike Clarkson Design Manager – James Maughan Design Co-ordinator – Dave Rothwell Site Engineer – Martin Holt Quantity Surveyor – Ray Clark Quantity Surveyor – David Clark Kingsmead Retail Project Manager – Jason Vince Site Manager – Stephen Parkin Design Manager – Carl Lee Quantity Surveyor – Keith France Quantity Surveyor – Ian Vogwell Site Engineer – Todd Gannon Simons Site Office 16 Bridge Street Stafford ST16 2HJ What has been going on so far? MSCP Bridge Street The car park for Stafford is looking spectacular and the team are very proud of there achievements – it opens to the public on Monday 21 st March – take a look at the piece opposite by Express and Star for more information (Photo courtesy of Express & Star) Riverside Retail The works to Riverside are progressing fast - we are now meeting with all your new retailers and working with them to get their fit-out works started soon. Kingsmead Retail The team have been working with Morrisons and now have the main building complete and ready for Morrisons’ fit out teams. We have now take the rest of the car park to re-develop into new car parking. 'The best view in town': Huge Stafford waterfront car park unveiled A new 1,000 space multi-storey car park has been unveiled in Stafford with bosses hailing it as ‘one of the best views of the town you can get’. Business leaders assembled atop the 14-storey structure yesterday ahead of the car park opening to the public on Monday 21 st March The waterfront facility is part of the £70 million Riverside redevelopment. It overlooks the new Marks & Spencer, Primark and H&M stores under construction as well as provide eye-watering views of the rest of the town matched only by Stafford Castle. Stafford Borough Council chief executive, Ian Thompson, said: “Apart from back over from the castle the view from the roof is just about the best view of Stafford you can get. I think together with the new shops it will bring a whole lot of new people into Stafford because I think one of the issues people have had felt difficult in the town centre is finding a car parking space – so now we’ve got in total about 1200 new spaces which will be conveniently located on the top of the shops.” The opening will coincide with the closure of the town’s Kingsmead car park which is to be redeveloped into a Morrisons, B&M, Just for Pets as well as room for 450 cars. Those shops are set to open later on this year while the first of the new Riverside shops is scheduled to welcome customers by the summer. Mr Thompson added: “I think the car park is absolutely fabulous. It’s modern, easy to use and hopefully the ticketing system and pay-on-foot method will be much better than previous systems so I think it’s very user friendly. I’m very pleased with how the development is going. It’s been a long wait but by August, September time, most of the main shops should be open which will be a culmination of almost 10-years work. With Stafford town centre, there will lots more to come in the future as well.”


Download ppt "Thank you for reading this far! We will be in touch shortly with more details, but if you have any questions or suggestions for Simons in the meantime,"

Similar presentations


Ads by Google