EECO2 Case Study Global Pharmaceutical Manufacturer – Memphis – Tennessee CME Warehouse - temperature & humidity controlled storage of regulated product,

Similar presentations


Presentation on theme: "EECO2 Case Study Global Pharmaceutical Manufacturer – Memphis – Tennessee CME Warehouse - temperature & humidity controlled storage of regulated product,"— Presentation transcript:

1 EECO2 Case Study Global Pharmaceutical Manufacturer – Memphis – Tennessee CME Warehouse - temperature & humidity controlled storage of regulated product, also include the HVAC system in the Retained Sample Store (existing R22 plant obsolete)

2 EEC02 Limited Suite 9, The Green Fountain Street, Macclesfield Cheshire, SK10 1JN Tel: +44 (0) 1625 660 717 |Email: info@eeco2.co.ukinfo@eeco2.co.uk Benefits: Delivering Global Energy Saving Solutions The core expertise & experience within EECO2 is not the usual Consultant format as we all come from a design & build background, commercially grounded and totally focused upon the identification & cost effective delivery of identified energy savings. Core Objective of all services: Use our acquired experience & knowledge to provide cost effective, energy & emission reduction solutions from initial opportunity identification through implementation & verification of savings delivered globally. Actual Verified Benefits: Energy savings delivered = 1.95m kWhr/pa Energy cost savings = $135,000 Emissions reduction = 917 te CO2 Simple pay back = 1.5 years Capital cost avoidance from not replacing Retained Sample Store HVAC = $35,000

3 EEC02 Limited Suite 9, The Green Fountain Street, Macclesfield Cheshire, SK10 1JN Tel: +44 (0) 1625 660 717 |Email: info@eeco2.co.ukinfo@eeco2.co.uk About the Project: Facility: CME Warehouse - temperature & humidity controlled storage of regulated product, also include the HVAC system in the Retained Sample Store (existing R22 plant obsolete) Issue: Very high energy demand driven by original HVAC design & layout Brief: Reduce energy demand without compromising on Compliance Solution: Reduce existing air change rates Reduce existing fresh air volume Install 2 new VSD’s to the 100kw supply air fans Replace the existing supply air diffusers to improve air distribution Use existing warehouse HVAC system to serve Retained Sample Store Risk based approach to mitigate potential “out of condition” impact

4 EEC02 Limited Suite 9, The Green Fountain Street, Macclesfield Cheshire, SK10 1JN Tel: +44 (0) 1625 660 717 |Email: info@eeco2.co.ukinfo@eeco2.co.uk Conclusion and Comments: Conclusion: EECO2 supported HVAC design review, project scoped out & local contractors bid to complete project – project let & successfully completed Site Energy Manager Comments: “This project was key for delivering the sites 2010 energy target. It exemplifies how the proper air flow & fresh air can contribute significant energy savings. This type of project will be replicated in the remaining areas of our Facility” Site Energy Manager

5 Contact Details: General Enquiries & Sales Tel: +44 (0) 1625 660 717 Email: info@eeco2.co.ukinfo@eeco2.co.uk Technical Support Tel: +44 (0) 1625 660 717 Email: info@eeco2.co.ukinfo@eeco2.co.uk EEC02 Limited Suite 9, The Green Fountain Street, Macclesfield Cheshire, SK10 1JN Connect with us: Follow us on LinkedinLinkedin Like us on FacebookFacebook Follow us on TwitterTwitter Add us on Google PlusGoogle Plus


Download ppt "EECO2 Case Study Global Pharmaceutical Manufacturer – Memphis – Tennessee CME Warehouse - temperature & humidity controlled storage of regulated product,"