Mirae Energy Asia Corporation (MAEC) Pursuant to RA 9513 or the Renewable Energy Act of 2008, Mirae Energy Asia Corporation was established and registered.

Similar presentations


Presentation on theme: "Mirae Energy Asia Corporation (MAEC) Pursuant to RA 9513 or the Renewable Energy Act of 2008, Mirae Energy Asia Corporation was established and registered."— Presentation transcript:

1

2 Mirae Energy Asia Corporation (MAEC) Pursuant to RA 9513 or the Renewable Energy Act of 2008, Mirae Energy Asia Corporation was established and registered with the Securities & Exchange Commission (SEC) in July 2011 as a Renewable Energy (RE) Developer with its first project in Currimao, Ilocos Norte. Developments and Status of the Project MAEC applied with the DOE as an RE Developer last October 2011 and the Service Contract of MAEC was issued by DOE in September 2012 (SESC No. 2012-08-020) MAEC has concluded a Long Term Lease Agreement (25 Years) with Provincial Government of Ilocos Norte (PGIN) for the use of the project site. MAEC has completed the detailed design of the plant is together with the Transmission line design. MAEC has secured the concurrence of the host LGUs for their support to the project in the form of Provincial, Municipal and Barangay Board Resolutions respectively. MAEC has secured the Environmental Compliance Certificate (ECC)for the project from Department of Environment & Natural Resources (DENR). MAEC has secured the Certificate of no Overlap (CNO) from the National Commission of Indigenous Peoples (NCIP) MAEC has completed the Grid Impact Study (GIS) and is discussing with NGCP for the Transmission Service Agreement (TSA) and Connection Agreement (CA). MAEC has registered the project with the Board of Investments (BOI) for Incentives. MAEC has submitted the Declaration of Commerciality (DOC) to DOE under the Feed-in-Tariff (FIT) scheme on 5 th March 2013.

3 Profile of the Project Location : Barangay Paguludan, Curimmao Ilocos Norte Area : 60 HAS Capacity : 20 MW Annual Production : 30.5 Million KWH

4 Project Location III.Project Overview 4 Source: Wikipedia Ilocos Norte A Province located in the north-west corner of Luzon Island in the Philippines. Coastline is a narrow plain parallel with the Cordillera mountain range Climate has a distinct rainy season and dry season with average temperature of 27 ℃ NREL data shows an average of 5.0-5.5kwh/sqm/day 18°03'09.64"N, 120°29'07.00"E Source: Google map

5 Ilocos Norte Annual Solar Potential Assessment of Solar Resources, NREL 2000

6 Layout of the 20MW PV Plant Layout of the 20 MW PV Power Plant

7 Currimao Solar Power Plant Substatio n Transmission Line Route from Plant site to NGCP substation (9.56 kms of 69KV single circuit line) Substation

8 Process of Implementation of Feed – in – Tariff System

9 Benefits of the Project to the Host LGU Mirae Energy Asia Corporation shall give government share ~ of one-percent (1%) of its gross revenue to the government, distributed as follows: (Per Rule 7, Section 20 of RA 9513) o 60%- National Government o 40%- Host LGU: Prov’l Government (20%), City/Municipality (45%) & Barangay (35%) Host LGU share is directly paid to the Provincial, Municipality or Barangay Treasurer, on a quarterly basis within five (5) days after the end of every quarter, which is an additional source of income to the province, municipality and barangay apart from appropriate taxes paid from the commercial operation of the project. The company would hire qualified personnel from the host locality to operate and maintain the Plant. The area can be envisioned by the Host Local Government to become one of the provincial tourist showcases, similar to the existing wind mill power plant in Bangui, Ilocos Norte. This envisioned development of tourism industry in the project site will in turn result to multiplier effects that will generate various livelihood in the area and subsequently upgrade the quality of life of the municipal folks. Also, Mirae Asia Energy Corporation, will join hands with the LGU on its Tree Planting activity under the auspices of DENR.

10 Memorandum of Understanding – Signing

11

12 Ground Breaking – November 15, 2012

13

14