2 CFS Work after TDR ML-Tunnel Standard Section in TDR Beam Line RF Gallery ML-T Cross Section ML-T 3D Image Beam Line RF Gallery Shielding Wall Drainage Trench Cross Section Tunnel Section : W11.0 m× 5.5m, Excavation Area : 62.7 m 2 Shielding Wall : W3.5 m × 5.5m, Wall Area : 15.5 m 2

3 ML-Tunnel Standard section in New Baseline 66kV & 6.6kV High Voltage Line Cooling Water(S,R) & CHW(S,R) Underground Water ML-Tunnel Cross Section in New Baseline ML-Tunnel Layout PartDimensions BLW: 3.8m Shielding WallThickness: 1.5m RFW: 4.2m Total Beam Tunnel Length : 25,000m

4 Baseline SW3.5m Option-1 SW1.5m, BL3.8m, RF3.7m Option-2 SW1.5m, BL3.8m, RF4.2m W11m x H5.5m Designed Ex Area 62.7 m2 W9m x H5.5m Designed Ex Area 53.6 m2 W9.5m x H5.5m Designed Ex Area 55.8 m2 Schedule (Monthly Progress) 92.8 m/month101.2 m/month99.0 m/month Construction Cost Unit Cost @2,410 kJPY/mUnit Cost @1,915 kJPY/mUnit Cost @1,965kJPY/m Ex @1,710 kJPY/mEx @1,490 kJPY/mEx @1,540 kJPY/m SW @700 kJPY/mSW @425 kJPY/m Total 60,250 MJPYTotal 47,880 MJPYTotal 49,130 MJPY - 12,370 MJPY- 11,120 MJPY Cost Comparison (TDR:100%) 79.5%81.5% Comparison Study of Construction Cost 2014 CFS 4 TDR Baseline 11.0 × 5.5 62.7 m 2 Reviced Option -2 9m × 5.5m 53.6 m 2 Reviced Option -2 9.5m × 5.5m 55.8 m 2 Confidential Document

5 Option-1 SW1.5m W9.0m x H5.5m Ex Area 53.6 m2 Total Kamaboko Tunnel length : 25,000m Baseline SW3.5m W11m x H5.5m Designed Ex Area 62.7 m2 - Beam line : Width 3.8m - Klystron gallery: Width 3.7m - Tunnel Ceiling: Height 5.5m - Beam line : Width 3.8m - Klystron gallery: Width 3.7m - Tunnel Ceiling: Height 5.5m Scheme Change Concept TDR Baseline:  Possible to enter the RF area during the beam operation New Baseline:  Person's entering restriction during the beam operation  Considering the dark current Variation of the Change Option Tunnel cross section CFS Work after TDR - Beam line : Width 3.8m - Klystron gallery: Width 4.2m - Tunnel Ceiling: Height 5.5m - Beam line : Width 3.8m - Klystron gallery: Width 4.2m - Tunnel Ceiling: Height 5.5m Option-2 SW1.5m W9.5m x H5.5m Ex Area 55.8 m2 - Beam line : Width 3.8m - Klystron gallery: Width 3.7m - Tunnel Ceiling: Height 5.5m - Beam line : Width 3.8m - Klystron gallery: Width 3.7m - Tunnel Ceiling: Height 5.5m

6 Back Up

7 Connecting Passage between both tunnels Under Discussion

8 4907.760 4911.580 3413.787 2334.943 4795.218 4907.760 2509.717 129.258 1500 New Baseline Additional Tunnel 13,829.063 13,712.695 2015/4/138 CFS Work after TDR 3km Extension of ML Tunnel QuantityUnit PriceCost for this scheme change 3,000 m @1,965 kJPY/m5,895,000 kJPY  Civil Cost neccesaried for CR-004 : 5,895,000 kJPY.  This cost is equivalent to approximately 53% of amounts of money managed to come up with by an ML tunnel section change.

9 TDR Baseline 11.0m × 5.5m 62.7 m 2

10 Reviced Option -1 9.0m × 5.5m 53.6 m 2

11 Reviced Option - 2 9.5m × 5.5m 55.8 m 2