Presentation is loading. Please wait.

Presentation is loading. Please wait.

TD Help for Shutdown 2015 Preliminary, will be updated July 6, 2015 – October 5, 2015.

Similar presentations


Presentation on theme: "TD Help for Shutdown 2015 Preliminary, will be updated July 6, 2015 – October 5, 2015."— Presentation transcript:

1 TD Help for Shutdown 2015 Preliminary, will be updated July 6, 2015 – October 5, 2015

2 Who ~6 People from TD from July 6 th to October 5 th Most will work on TSP to IP project –One person assigned to LCW group

3 Who & What TSP2IP Mechanical ADSylejmani SaliCrew LeaderTSP2IP TDJohnson SeanMechanical TechnicianTSP2IPDrill Crew TDDormann PeterMechanical TechnicianTSP2IPChip inspector and cleaner TDKaminskas LarryMechanical TechnicianTSP2IPShielding and Stands TDJones RobertMechanical TechnicianTSP2IPShielding and Stands TDFlannigan TimothyMechanical TechnicianTSP2IPShielding and Stands LCW Support ADSlazyk RobertMechanical SupervisorAd Ops Maintenance TDOstrom WayneMechanicalTechnicianAd Ops Maintenance

4 Who Dave Augustine (ALL) Ext: 4451 Pager (630) 905-5081 augustine@fnal.gov Oliver Kiemschies (TD) Ext: 3925 Cell (630) 364-6533 ollie@fnal.gov Consolato Gattuso Ext: 6331 gattuso@fnal.gov http://shutdown.fnal.gov/ Bob Slazyk (LCW) Ext: 2422 Pager (630) 266-5648 slazyk@fnal.gov

5 Where MI/RR for most work but all accelerators in access (eventually) There WILL be permanent shutdown keys (i.e. keys that you don’t have to turn in at the end of the day) for most Leaders will organize (more information later). Otherwise (however) keys will come from the MCR

6 Location of the MCR

7 Layout of MCR <- Keys MI & Booster LOTO -> <- NuMI LOTO Usually RWP’s are next where keys are. At the beginning of this shutdown, the RWP’s will be in the room next to the MCR, along with RSO’s

8 LOTO (will be job lock boxes)

9 When Meeting with Bill Dymond Wednesday Will find out from Bob Slazyk

10 Good Luck! Stay Safe! This presentation can be found at: http://www-tdserver1.fnal.gov/AcceleratorSupport/Shutdown_2015/


Download ppt "TD Help for Shutdown 2015 Preliminary, will be updated July 6, 2015 – October 5, 2015."

Similar presentations


Ads by Google