December 3, 20031Muon Integration Meeting Outline: Status of Calorimeter and Muon system Plug simulations Status of plug dimensions Conclusions Reminder:

Slides:



Advertisements
Similar presentations
Data/MC discrepancy study Alessia Satta Roma 9 october 2014.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Particle rate in M1 and M2 Muon Meeting
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Beam-plug under M2 and HCAL shielding studies Robert Paluch, Burkhard Schmidt October 9,
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
1 Sep. 19, 2006Changguo Lu, Princeton University Induced signal in RPC, Configuration of the double gap RPC and Grouping of the strips Changguo Lu Princeton.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
E-field calculations for the TPC/HBD N. Smirnov Upgrade Working Group Meeting 05/13/03, BNL.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
PNPI in LHCb A.Vorobyov HEPD Scientific Board meeting, December 26,2003 Status report for 2003.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
1 G4MICE studies of PID transverse acceptance MICE video conference Rikard Sandström.
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
H. Alvarez Pol - NUSTAR Calorimeter WG R3B/EXL Collaboration Meeting - Santiago Sept Geometrical design, simulation progress and first detector.
Tracking within hadronic showers in the SDHCAL Imad Laktineh.
Hcal Geometry and Assembly CLIC Meeting - LAPP December 2008, 15th.
Readout Board Design for Gas Electron Multiplier Detectors for Use in a Proposed Upgrade of the CMS Hadron Calorimeter Elizabeth Starling Marcus Hohlmann.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
Giuseppe Martellotti - 24/02/2014 Performance at high luminosity - efficiency - accidentals - detector layout (contributions from Alessia and Roberta)
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
Impact parameter resolution study for ILC detector Tomoaki Fujikawa (Tohoku university) ACFA Workshop in Taipei Nov
Status of straw-tube tracker V.Peshekhonov, D.Peshekhonov, A.Zinchenko JINR, Dubna V.Tikhomirov P.N.Lebedev Physics Institute, Moscow Presented on the.
Simulation of physics background for luminosity calorimeter M.Pandurović I. Božović-Jelisavčić “Vinča“ Institute of Nuclear Sciences, Belgrade, SCG.
1 A.Andronic 1, H.Appelshäuser 1, V.Babkin 2, P.Braun-Munzinger 1, S.Chernenko 2, D.Emschernmann 3, C.Garabatos 1, V.Golovatyuk 2, J.Hehner 1, M.Hoppe.
S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, CBM beam pipe and integration inside the Magnet Status report Sergey Belogurov,
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Hit rate at high luminosity logical channels - ghosts – efficiency Toy Monte Carlo : # I have assumed a uniform particle distribution inside the TS # I.
AND/OR - Are MC and Data (in)consistent? - further analysis and new measurements to do - Effects on inefficiency evaluation 1 G. Martellotti 21/05/2015.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
D. Dutta 13th CBM Collaboration Meeting 1 Dipanwita Dutta Much Segmentation Study: A Flexible Scheme.
IDS120j WITHOUT RESISTIVE MAGNETS: NEW Hg MODULE mars1510 ( DESKTOP ) vs. mars1512 ( PRINCETON CLUSTER ) Nicholas Souchlas, PBL (3/28/2012) 1.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, May 25, 2004 Purpose:  Provide pion – muon separation (muon veto)
Detector alignment Stefania and Bepo Martellotti 20/12/10.
F.Murtas1 LUMI GEM Bremsstrahlung Dafne Bhabha Dafne Upgrade.
24/03/99Report to LHCC Referees Muon Group Status Report Outline: Muon Filter - New Geometry - Support System Optimisation Studies - Pad, Strip and Pad/Strip.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
IDS120j WITHOUT RESISTIVE MAGNETS MODIFYING Hg MODULE Nicholas Souchlas, PBL (11/1/2012) 1.
1 M2-M5 Efficiency and Timing checks on 7TeV beam data Alessia, Roberta R.Santacesaria, April 23 rd, Muon Operation
M. Gilchriese Phone Meeting December 18, M. Gilchriese 2 PP1 Region Update “Bag” gas barrier Passive insulation? Region for external beam pipe supports?
19 March 2001Report to LHCC Referees Status of Muon TDR Preparations Outline: Introduction : TDR Contents Software Status and New Results Status of Chamber.
HMPiD upgrade variant; simulation status N. Smirnov Physics Department, Yale University, May, 06. CERN visit.
LHCb Muon System TDR Outline: Introduction –Physics requirements –Background conditions Overview of the Muon System Physics Performance –L0 muon trigger.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Comparison of different chamber configurations for the high luminosity upgrade of M2R2 G. Martellotti - LNF - 13/03/2015 Roma1 + Alessia.
Eight fully instrumented PC1 mounted on top of the Drift Chamber. Qualities * Efficiency close to 100% and good spatial resolution. Noise free operation.
Hcal Geometry and Assembly Videoconference January 2008, 24th.
Pre-LHCb week / CALO meeting, CERN SBBeam plugs for in 1 
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Geant4-based detector simulation activities at NICADD Guilherme Lima for the NICADD simulations group December 2003.
Mitglied der Helmholtz-Gemeinschaft Hit Reconstruction for the Luminosity Monitor March 3 rd 2009 | T. Randriamalala, J. Ritman and T. Stockmanns.
09/07/20021Burkhard Schmidt Muon Station M1 Outline: Material Budget –What is the present best estimate of the material budget of a “default” MWPC station.
21/11/2002 Muon MeetingBurkhard Schmidt Envelopes and Clearances Outline: Definitions General situation Request of Calorimeter group.
Beampipe design F.Raffaelli G.Calderini, M.Marchiori, M.Mazur, E.Paoloni Framework for Geant4 Interaction Region simulation.
Feasibility of the detection of D 0 mesons in the NA61/SHINE experiment: Vertex detector for NA61/SHINE P. Staszel and Yasir Ali Jagiellonian University.
Status of the forward tracker design
Hcal Geometry and Assembly
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
PEDESTAL STABILITY OF HCAL DURING GLOBAL RUNS AND 2009 CASTOR DQM ANALYSIS Emine GÜRPINAR Cukurova University 7/31/2018.
The Anticoincidence Shield of the PAMELA Satellite Experiment
Hcal Geometry (second version)
Francesco Forti SuperB Workshop LNF, March, 2006
Pre-installation Tests of the LHCb Muon Chambers
Hall C Users Meeting 31 January 2009
Inner DET. Integration Inner detector envelope Radial clearances.
Presentation transcript:

December 3, 20031Muon Integration Meeting Outline: Status of Calorimeter and Muon system Plug simulations Status of plug dimensions Conclusions Reminder: Alessia showed in the September meeting that the rates in M2R1 increased compared to the TDR. However, her numbers are in reasonable agreement with the ones Karl obtained in November >Optimization of the plugs has started Plugs around the beam pipe

December 3, 2003Muon Integration Meeting Plugs around the Beam Pipe Transition between beampipe section 3 and 4 will most likely move under the HCAL (20 cm backwords Materials have to be optimized Shape of the plugs has to be optimized Clearances have to be introduced

December 3, 20033Muon Integration Meeting Results of simulations of Alessia and Roberta: Standard 1) 2) 3) 4) M M M M (Given are the average number of hits per interaction) Standard: Ecal(W)-Hcal(Fe), empty space of about 1cm around the BP 1) Ecal(W)-Hcal(Fe), same materials as standard but no empty space around BP 2) Ecal(W)-Hcal(W) Standard dimensions (1cm empty space), W in both plugs 3) Ecal(W)-Hcal(W) Large dimensions (no empty space), W in both plugs. Here also the plugs around the beampipe in the muon system are large, so the rate in M3-M4 are not quite comparable to the previous cases. 4) Ecal(W)-Hcal(Pb) Standard dimensions (1cm empty space). Plugs around the beam pipe

December 3, 20034Muon Integration Meeting Results of simulations (ctd.): Standard 2) 4) –M2R –M2R –M2R –M2R –Total –(Given are the average number of logical channels fired per event) ->Region 1 is critical ! Plugs around the beam pipe

29 May 2002Muon Meeting Hit rates in the various stations Rate in Station 2 is much more critical than the rate in the other stations. (Different beam pipe shapes not important for this optimization)

5 March 2001FE-Interface Meeting Details: –Wire fixation bars (top/bottom): ~30mm –Gap bars (side):~20mm –Gas connection side:~30mm –HV-part (HV-bus, R, C):~35mm –Cathode readout (bottom/side):~20mm –SP-board, FE-board, Connector: ~20mm Sums: –Top with Anode/Cathode Readout:~85mm –Bottom with Cathode readout~70mm –Bottom no readout~35mm –Side no readout:~50mm –Side with Cathode readout~60mm Space Requirements for Border Region

5 March 2001FE-Interface Meeting Beam Pipe Region Dimensions in M2: Present shield configurationRealistic shield configuration

December 3, 2003Muon Integration Meeting Beam Pipe Region Dimensions in M2: Shield configuration More realistic shield for the TDR:configuration: (clearance)

December 3, 2003Muon Integration Meeting Plugs around the Beam Pipe Conclusions: Realistic plugs seem have only ½ the dimensions of the ones we assumed up to know! Very bad for rates in M2 and ageing ! It becomes urgent to check the system performance with the new dimensions ! The plug dimensions for M3-M5 have to be added.