Public Hearings December 15, 2015. Case: CDR-14-12-352 Project: Gooding’s Plaza PD/LUP Applicant: Jennifer Stickler Kimley-Horn & Associates, Inc. District:

Slides:



Advertisements
Similar presentations
Public Hearings August 27, Case: CDR Project: Village F Master PD / LUP Applicant: Lance Bennett, Poulos & Bennett, LLC District: 1 Proposed:Reconfiguration.
Advertisements

Board of County Commissioners PUBLIC HEARING October 23, 2007.
Public Hearings November 19, Case: PSP Project: Moss Park PD / Parcel E Phase 3 PSP Applicant: Lance Bennett, Poulos & Bennett District:
Public Hearing June 4, Case: CDR Project: Winegard Road South PD LUP - Substantial Change Applicant: Hugh M. Lokey, P.E., Hugh M. Lokey.
Public Hearings October 14, Case: CDR Project: Winegard Road South PD Applicant: Hugh Lokey, Hugh M. Lokey and Associates, Inc. District:
Public Hearing June 26, Case:CDR Project:Stillwater Crossings and Center Bridge Planned Development / Land Use Plan (PD/LUP) - Substantial.
Public Hearings January 13, Case: PSP Project: Avalon Park PD / Avalon Town Center PSP / A Portion of Tract 3 Uptown Avalon PSP Applicant:
Public Hearing April 30, Case:LUPA Project:Universal Boulevard PD LUPA (a.k.a. “U.S.I. South Campus PD”) Applicant:Jay R. Jackson District:6.
Public Hearings January 6, Case: PSP Project: Northeast Resort Parcel (NERP) PD / NERP Phase 4 PSP Applicant: Kathy Hattaway-Bengochea,
Board of County Commissioners
Public Hearings January 13, Case: CDR Project: Clarcona Grove PD / Land Use Plan Applicant: Jennifer Stickler, Kimley-Horn and Associates,
Public Hearings February 10, Case: LUP Project: Orlando Health Central – Porter Road Medical Campus PD / UNP Applicant: Gregory P. Ohe,
Public Hearings May 5, Case: PSP Project: Hamlin PD / UNP / RW-1B Commercial PSP / DP Applicant: Scott M. Gentry, Kelly, Collins & Gentry,
Board of County Commissioners PUBLIC HEARING August 21, 2007.
Public Hearing January 8, Case:CDR Project:Waterford Commons Planned Development/Land Use Plan (PD/LUP) - Substantial Change Applicant:Bob.
Case: CDR Project: Central Church of the Nazarene Planned Development (PD) / Land Use Plan (LUP) Applicant: Jeff W. Banker, Highland Engineering.
Public Hearings June 30, Case: CDR Project: Waterford Lakes Planned Development / Land Use Plan (PD/LUP) Applicant: Vivien Monaco, Burr.
Public Hearings March 10, Case: CDR Project: Sutton Lakes Planned Development / Land Use Plan Applicant: Jim Hall, VHB, Inc. District:
Public Hearing January 15, Case:LUPA Project:Florida Hospital East PD Applicant: Jamie T. Poulos District:3 Request:R-1A (Single-Family.
Public Hearings August 4, Case: CDR Project: Universal Boulevard PD / LUP Applicant: Jay Jackson, Kimley-Horn & Associates District: 6.
Public Hearings August 6, Case: LUP Project: Ivey Groves PD/LUP Applicant: Thomas Daly, Daly Design Group, Inc. District: 1 Proposed Use:R-CE.
Public Hearings June 30, Case: CDR Project: Orangewood Neighborhood – 2 PD / LUP Applicant: Jim Hall, VHB, Inc. District: 1 Acreage:588.7.
Board of County Commissioners PUBLIC HEARING August 5, 2008.
Board of County Commissioners PUBLIC HEARING February 26, 2008.
Public Hearings September 15, Case: PSP Project: North of Albert’s PD / Westside PSP Applicant: Jennifer J. Stickler, Kimley - Horn and.
Public Hearings September 15, Case: CDR Project: Universal Boulevard PD / West and Northwest Parcels Preliminary Subdivision Plan (PSP)
Public Hearing February 26, Case:CDR Project:Beck/Overstreet Planned Development / Land Use Plan (PD/LUP) - Substantial Change Applicant:Kevin.
Public Hearings April 21, Case: CDR Project: Buena Vista Commons Planned Development / Land Use Plan (PD/LUP) and Master Sign Plan (MSP)
Public Hearing May 22, Case:CDR Project:Stillwater Crossings & Center Bridge Planned Development/Land Use Plan (PD/LUP) - Substantial.
Case: LUP Project: Jama PD / LUP Applicant: Momtaz Barq, Terra-Max Engineering, Inc. District: 1 Acreage:8.94 gross acres Request:To rezone the.
Board of County Commissioners PUBLIC HEARING September 1, 2009.
Public Hearings August 25, Case: PSP Project: Stillwater Crossings & Center Bridge PD / Vineyards Townhomes Phases 2A-5 PSP Applicant:
Public Hearings February 24, Case: LUP Project: Wedgefield K-8 School PD / LUP Applicant: Tyrone Smith, OCPS Planning & Governmental Relations.
Public Hearings June 16, Case: PSP Project: Reams Road Parcel Commercial PSP Applicant: Constance A. Owens, Tri3 Civil engineering Design.
Public Hearings August 4, Case: PSP Project: Village F Master PD / Parcels S-1 & S-2 – Panther View PSP Applicant: Scott Stearns, Dewberry.
Public Hearings September 15, Case: LUP Project: Hamlin West PD / UNP Applicant: James G. Willard, Shutts & Bowen, LLP District: 1 Acreage:
Board of County Commissioners PUBLIC HEARING June 23, 2009.
Public Hearings June 30, Case: CDR Project: Village F Master PD / LUP Applicant: Eric Warren, Poulos & Bennett District: 1 Acreage:1,
Board of County Commissioners PUBLIC HEARING June 10, 2008.
Public Hearings October 6, Case: CDR Project: Vista Centre PD / LUP Applicant: Raymond Stangle, Jordan & Associates, LLC District: 1 Acreage:77.90.
Board of County Commissioners PUBLIC HEARING September 22, 2009.
Public Hearings September 23, Case: CDR Project: Orlando International Hotel PD Applicant: George Sorich, Antunovich Associates, Inc.
Board of County Commissioners PUBLIC HEARING March 4, 2008.
Public Hearings November 3, Case: CDR Project: Isleworth – Four Corners PD/LUP / The Grove at Isleworth – Master Sign Plan (MSP) Applicant:
Public Hearings December 3, Case: CDR Project: AIPO / South Orange Properties PD Applicant: Mark Jacobson, Bowyer-Singleton District:
Public Hearings September 9, Case: CDR Project: Florida Hospital East Campus PD Applicant: Jamie Poulos, Poulos & Bennett, LLC District:
Public Hearings August 4, Case: CDR Project: Little Lake Bryan PD / LUP Applicant: Kathy Hattaway-Bengochea, HCI Planning and Development.
Public Hearings October 6, Case: CDR Project: Reams Road Parcel Commercial PSP Applicant: Constance A. Owens Tri3 Civil Engineering Design.
Board of County Commissioners PUBLIC HEARING April 22, 2008.
Public Hearing November 13, Case:CDR Project:Isleworth Four Corners Planned Development- The Grove at Isleworth - Master Sign Plan Substantial.
Public Hearing April 23, Case:CDR Project:Project ABC Planned Development/ Land Use Plan (PD/LUP) Substantial Change Applicant:Jim Hall.
Public Hearings January 5, Case: CDR Project: Silver City PD/LUP Applicant: Miranda F. Fitzgerald Lowndes Drosdick Doster Kantor & Reed,
Board of County Commissioners PUBLIC HEARING June 22, 2010.
Public Hearings September 15, Case: DP Project: Hamlin PD / UNP - Publix PSP / DP Applicant: Scott M. Gentry - Kelly, Collins & Gentry,
Board of County Commissioners PUBLIC HEARING October 2, 2007.
Public Hearings October 6, Case: PSP Project: North of Albert’s PD / Westside Village Home District PSP Applicant: Jennifer J. Stickler.
Public Hearings December 1, Case: LUP Project: Skyplex Orlando PD/LUP Applicant: George M. Kramer Littlejohn Engineering Associates District:
Public Hearings December 17, Case: CDR Project: Signature Lakes PD / Signature Lakes PSP Applicant: John Prowell, VHB, Inc. District:
Public Hearings January 26, Case: CDR Project: Lakeside Village Center South PD / LUP Applicant: Dennis Seliga, Boyd Development Corporation.
Public Hearings December 15, Case: CDR Project: Vineland Pointe PD/LUP Applicant: Tom R. Sullivan, Gray Robinson District: 1 Acreage:113.0.
Public Hearings January 28, Case: CDR Project: Granada Planned Development (PD Parcel Northeast B) Applicant: Chuck Whittall, Unicorp.
Public Hearings August 4, 2015 Public Hearing Village F Master PD LUP Substantial Change.
Board of County Commissioners PUBLIC HEARING September 9, 2008.
Public Hearings October 20, Case: CDR Project: Ginn Property PD / LUP Applicant: Heather Isaacs, Tavistock Development Company District:
Public Hearings January 14, Case: CDR Project: Buena Vista Commons Planned Development Applicant: Constance Owens, Tri3 Civil Engineering.
Public Hearings April 26, Case: DP Project: Orangewood N-2 PD / Parcel 11A - Westwood Reserve at Grande Pines DP Applicant: Marc D. Stehli,
Public Hearings February 11, Case: CDR Project: Colonial Self Storage Planned Development (PD) Applicant: Tom Sullivan, Lowndes, Drosdick,
Public Hearings January 5, Case: LUP Project: Chabad at UCF PD/LUP Applicant: Tara L. Tedrow Lowndes Drosdick Doster Kantor & Reed, P.A.
Public Hearing February 26, Case: CDR Project: Orangewood Planned Development/ Land Use Plan (PD/LUP) Substantial Change Applicant: Kristy.
Board of County Commissioners
Presentation transcript:

Public Hearings December 15, 2015

Case: CDR Project: Gooding’s Plaza PD/LUP Applicant: Jennifer Stickler Kimley-Horn & Associates, Inc. District: 6 Acreage:19.04 gross acres (overall PD) 8.96 gross acres (affected parcel) Request:Adding “amusement” as a permitted use; increasing the maximum building height from 75 feet to 450 feet; and incorporating a Master Sign Plan (MSP) with three (3) waivers from Orange County Code. Gooding’s Plaza Planned Development / Land Use Plan (PD/LUP) Gooding’s Plaza Planned Development / Land Use Plan (PD/LUP)

Gooding’s Plaza Planned Development / Land Use Plan (PD/LUP) Future Land Use Map Gooding’s Plaza Planned Development / Land Use Plan (PD/LUP) Future Land Use Map

Gooding’s Plaza Planned Development / Land Use Plan (PD/LUP) Zoning Map Gooding’s Plaza Planned Development / Land Use Plan (PD/LUP) Zoning Map

Gooding’s Plaza Planned Development / Land Use Plan (PD/LUP) Aerial Map Gooding’s Plaza Planned Development / Land Use Plan (PD/LUP) Aerial Map

Gooding’s Plaza Planned Development / Land Use Plan (PD/LUP) Gooding’s Plaza Planned Development / Land Use Plan (PD/LUP)

Action Requested Make a finding of consistency with the Comprehensive Plan (CP) and approve the substantial change to the Gooding's Plaza Planned Development / Land Use Plan (PD/LUP) dated “Received July 16, 2015”, subject to the recommended Development Review Committee (DRC) conditions listed in your staff report. District 6 District 6

Modified Condition # 8 8.The International Drive Entertainment Master Plan (“Master Plan”) dated November 30, 2015 is intended to be implemented incrementally over a period of twenty (20) years. Development within the Gooding’s Plaza PD shall be consistent with the vehicular and pedestrian street network depicted on the Master Plan, which ultimately includes a north-south extension of Riley Park Way from the Orlando International Hotel PD to the Wyndham Resort PD, and an enhanced east-west street located between International Drive and Universal Boulevard. A certificate of occupancy shall not be issued for any new development within the Gooding’s Plaza PD until the north-south extension of Riley Park Way has been completed in the portion of the PD controlled by Orlando Hotel International SPE, LLC, their successors or assigns. However, enhancements to the east-west street located immediately north of the largest of the four existing (existing as of December 15, 2015) Gooding’s Plaza structures (the “Primary Structure”) shall be completed prior to (or in conjunction with) any redevelopment of the Primary Structure which is determined to be a substantial change.

Public Hearings December 15, 2015