Presentation is loading. Please wait.

Presentation is loading. Please wait.

Public Hearings June 30, 2015. Case: CDR-15-02-053 Project: Village F Master PD / LUP Applicant: Eric Warren, Poulos & Bennett District: 1 Acreage:1,708.95.

Similar presentations


Presentation on theme: "Public Hearings June 30, 2015. Case: CDR-15-02-053 Project: Village F Master PD / LUP Applicant: Eric Warren, Poulos & Bennett District: 1 Acreage:1,708.95."— Presentation transcript:

1 Public Hearings June 30, 2015

2 Case: CDR-15-02-053 Project: Village F Master PD / LUP Applicant: Eric Warren, Poulos & Bennett District: 1 Acreage:1,708.95 gross acres (overall) 113.75 gross acres (affected) Request:A substantial change to incorporate two (2) waivers from Orange County Code for the purpose of allowing alternative residential ground signage in the form of architecturally- designed entry features within the affected area of the PD. Village F Master Planned Development (PD) / Land Use Plan (LUP) Village F Master Planned Development (PD) / Land Use Plan (LUP)

3 Village F Master Planned Development (PD) / Land Use Plan (LUP) - Zoning Map

4 Village F Master Planned Development (PD) / Land Use Plan (LUP) - Future Land Use Map

5 Village F Master Planned Development (PD) / Land Use Plan (LUP) - Aerial Map

6 Village F Master Planned Development (PD) / Land Use Plan (LUP) Village F Master Planned Development (PD) / Land Use Plan (LUP)

7 Action Requested Make a finding of consistency with the Comprehensive Plan (CP) and approve the substantial change to the Village F Master Planned Development / Land Use Plan (PD/LUP) dated “Received May 14, 2015”, subject to the recommended Development Review Committee (DRC) conditions listed in the Staff Report, including the following modified conditions #4 and #7: District 1

8 Action Requested 4. As proof of satisfaction of the project’s transportation concurrency obligations, the project must comply with that certain Village F Road Network Agreement recorded at O.R. Book 10591, Page 5123, Public Records of Orange County, Florida. The developer must provide a valid Assignment of Vested Trips document together with the applicable Confirmation Letter issued by Orange County, concurrently with or prior to plat submittal approval. In addition, any Development Plan must show a legend with trip allocations by parcel identification number and phase of the development. 7. A current Level One (1) Environmental Site Assessment (ESA) and current title opinion shall be submitted to the County for review and approval as part of any Preliminary Subdivision Plan (PSP) and / or Development Plan (DP) submittal. District 1 District 1


Download ppt "Public Hearings June 30, 2015. Case: CDR-15-02-053 Project: Village F Master PD / LUP Applicant: Eric Warren, Poulos & Bennett District: 1 Acreage:1,708.95."

Similar presentations


Ads by Google