Bob Jones EGEE designated technical director All activity workshop EGEE is proposed as a project funded by the European Union under contract IST-2003-508833.

Slides:



Advertisements
Similar presentations
LCSC October The EGEE project: building a grid infrastructure for Europe Bob Jones EGEE Technical Director 4 th Annual Workshop on Linux.
Advertisements

EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE-III Program of Work Erwin Laure EGEE-II / EGEE-III Transition Meeting CERN,
EGEE is a project funded by the European Union under contract IST NA2 Dissemination John DYER Activity Leader All Activity Meeting, CERN 18.
EGI: A European Distributed Computing Infrastructure Steven Newhouse Interim EGI.eu Director.
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
EGEE is a project funded by the European Union under contract IST The way ahead Alistair Mills Grid Deployment Group
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
CERN – Roberta Faggian Marque, Jan Fiete Grosse-Oetringhaus GRACE General Meeting, September 2004, Brussels 1 D6.1 Integration with the European DataGrid.
Security Area in GridPP2 4 Mar 2004 Security Area in GridPP2 “Proforma-2 posts” overview Deliverables – Local Access – Local Usage.
Responsibilities of ROC and CIC in EGEE infrastructure A.Kryukov, SINP MSU, CIC Manager Yu.Lazin, IHEP, ROC Manager
EGEE is a project funded by the European Union under contract INFSO-RI Summary M-E Bégin & B. Jones EGEE Technical Coordination All Activity Meeting,
EGEE is a project funded by the European Union under contract IST JRA3 Security Åke Edlund Security Head PEB All-Activity Meeting, June 18,
EGEE is a project funded by the European Union under contract IST JRA1-SA1 requirement gathering Maite Barroso JRA1 Integration and Testing.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
Fabrizio Gagliardi EGEE designated project director All activity workshop EGEE is proposed as a project funded by the European Union under contract IST
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
EGEE is a project funded by the European Union under contract IST Summary Bob Jones Technical Director AA Meeting, CERN, 18th June
LCG EGEE is a project funded by the European Union under contract IST LCG PEB, 7 th June 2004 Prototype Middleware Status Update Frédéric Hemmer.
Conference xxx - August 2003 Fabrizio Gagliardi EGEE designated Project Director EGEE: status and overall project planning.
EGEE is a project funded by the European Union under contract IST Collaboration Board F.Gagliardi Project Director Cork Conference, 20 th April.
15-Dec-04D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security Update (Report from the Joint Security Policy Group) CERN 15 December 2004 David Kelsey CCLRC/RAL,
EGEE NA3 Status Prof. Malcolm Atkinson Director John Murison Training Manager CERN 14 th January 2004.
EGEE is a project funded by the European Union under contract IST WBS/ Execution Plan Alistair Mills Grid Deployment Group
EGEE MiddlewareLCG Internal review18 November EGEE Middleware Activities Overview Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as.
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
EGEE is a project funded by the European Union under contract IST Network Resources Provision Jean-Paul Gautier SA2 manager Cork meeting,
LCG LCG Workshop – March 23-24, Middleware Development within the EGEE Project LCG Workshop CERN March 2004 Frédéric Hemmer.
JRA2: Quality Assurance Overview EGEE is proposed as a project funded by the European Union under contract IST JRA.
HEP Applications within EGEE - an overview and relations with GAG F Harris (Oxford/CERN) EGEE is proposed as a project funded by the European Union under.
EMI INFSO-RI SA1 Session Report Francesco Giacomini (INFN) EMI Kick-off Meeting CERN, May 2010.
EGEE is a project funded by the European Union under contract IST Generic Applications in EGEE-NA4 Roberto Barbera NA4 Generic Applications.
Bob Jones EGEE technical director All activity workshop 17 th March 2004 EGEE is proposed as a project funded by the European Union under contract IST
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
EGEE JRU Workshop, Brussels, December 1 st, JRU RoGrid – Romanian Experience RoGrid Consortium RoGrid JRU set-up RoGrid JRU Implementation Internal.
Guy Wormser IN2P3/CNRS, EGEE Applications Manager September 2003 EGEE is proposed as a project funded by the European Union under contract IST
EGEE is a project funded by the European Union under contract IST EGEE Summary NA2 Partners April
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
SA2 : Network Resource Provision All Activity Meeting – 17 March SA2 Execution Plan for the first year Jean-Paul Gautier SA2 Manager CNRS/UREC.
EGEE Project Review Fabrizio Gagliardi EDG-7 30 September 2003 EGEE is proposed as a project funded by the European Union under contract IST
Fabrizio Gagliardi EGEE project director All activity workshop 17 th March 2004 EGEE is proposed as a project funded by the European Union under contract.
Last update: 03/03/ :37 LCG Grid Technology Area Quarterly Status & Progress Report SC2 February 6, 2004.
INFSO-RI Enabling Grids for E-sciencE gLite Certification and Deployment Process Markus Schulz, SA1, CERN EGEE 1 st EU Review 9-11/02/2005.
INFSO-RI Enabling Grids for E-sciencE EGEE Contributions to e-Infrastructure policy work Matti Heikkurinen, NA5 leader, CERN EGEE.
18-May-04D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security Update (Report from the LCG Security Group) Barcelona 18 May 2004 David Kelsey CCLRC/RAL, UK
Javier Orellana JRA4 Coordinator Face to Face Partners Meeting University College London 11 December 2003 EGEE is proposed as a project funded by the European.
EGEE is a project funded by the European Union under contract INFSO-RI NA5 M. Heikkurinen NA5 Activity Manager All Activity Meeting, 13 th September.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
Organisation of HEP Applications within NA4 F Harris (Oxford/CERN) EGEE is proposed as a project funded by the European Union under contract IST
EGEE is a project funded by the European Union under contract IST JRA4 Overview Javier Orellana JRA4 Coordinator EGEE Kick Off Meeting SA2.
JRA1 Activity Feedback Frédéric Hemmer EGEE Middleware Manager and the JRA1 team EGEE is a project funded by the European Union under contract IST
All Activities Meeting – 13/14 Jan SA2 Execution Plan for the first year Franck Bonnassieux CNRS/UREC EGEE is proposed as a project funded by.
WP3 EGEE Steve Fisher / RAL 14/1/2004. WP3 Steve Fisher/RAL - 14/1/2004EGEE2 Credits My slides have been stolen from many sources including: –Fabrizio.
Javier Orellana JRA4 Coordinator All-Activity Meeting CERN 14 January 2004 EGEE is proposed as a project funded by the European Union under contract IST
Fabrizio Gagliardi EGEE Project Coordinator EGEE is proposed as a project funded by the European Union under contract IST
EGEE is a project funded by the European Union under contract IST Service Activity 1 M.Cristina Vistoli ROC Coordinator All activity meeting,
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
Javier Orellana EGEE-JRA4 Coordinator CERN March 2004 EGEE is proposed as a project funded by the European Union under contract IST Network.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Brussels, January 16th, Overview and status of the project.
Bob Jones EGEE Technical Director
Regional Operations Centres Core infrastructure Centres
EGEE Middleware Activities Overview
JRA3 Introduction Åke Edlund EGEE Security Head
SA1 Execution Plan Status and Issues
Ian Bird GDB Meeting CERN 9 September 2003
Guy Wormser IN2P3/CNRS , EGEE Applications Manager
JRA1 (Middleware) Overview
Presentation transcript:

Bob Jones EGEE designated technical director All activity workshop EGEE is proposed as a project funded by the European Union under contract IST Summary

EGEE all activity W/S Jan ‘ General Points All activities should add a recurring task to review the deliverables from other activities  Estimate about 1 PM per year per activity Similarly for management

EGEE all activity W/S Jan ‘ NA1 Gender action plan to be taken into account during hiring for all partners – response needed soon. Establishment of links with partners and activities Signature of consortium agreement

EGEE all activity W/S Jan ‘ NA2 Organise review of internal and external websites before project start-up Consistency of internal and external websites Fix dates for 2 nd project conference in NIKHEF NA2 get-together to be organized PO needs to be involved Identify collaborative tools used via the external website Mailinglists for members & friends

EGEE all activity W/S Jan ‘ Conference-1 Tasks (NA2) Organisers Conference Calls Open Registration Announce to our audience Further Sponsors

EGEE all activity W/S Jan ‘ NA3 Help from other activities is needed – contact person per activity or sub-activity as well as partners (federations) is needed. Enquiry to activities needs to be finished before start of project, in particular for training that should start immediately. Role of regional training centers Take into account details provided during the workshop by the other activities Collaboration with other ongoing projects Platforms and infrastructure for training Needs to be set up and coordinated with local efforts – relationship with production system Remote training (access grid) Coverage of Europe (languages/region) – partner involvements still only 1/3; France, Spain & Portugal not part of NA3

EGEE all activity W/S Jan ‘ Summary (NA3) Outreach & Training vital for EGEE Success & continuation depend on it Planning & Training Team development underway Must be well connected with rest of EGEE We need your requirements, information and support Depends on quality of EGEE’s delivered technology

EGEE all activity W/S Jan ‘ NA4 Attracting other application areas (apart from HEP and Bio) is critical for EGEE how does the selection panel work, what is it composition? What will be the selection criteria? Integration with national programs (bottom-up via applications) Only a few partners active so far – in particular many partners dealing with generic applications not yet active HEP Relationship to experiment work (e.g. ARDA, GAG) Relationship to other applications Relationship to LCG committees Execution plan Collaboration with and input from applications (HEP, Bio) needed.

EGEE all activity W/S Jan ‘ On the agenda ! (NA4) Converge on the execution plan (VB) Update the technical annex (FE) Form the Selection panel for the generic applications (RB- GW) Launch NA4 extended steering committee meetings (GW) Prepare the kick-off meeting in Cork (April 19-22) including the Industry Forum session Contact and involve ALL NA4 partners All partners to launch the recruiting process Find a replacement for Vincent as head of the bio/med sector Build a team spirit!

EGEE all activity W/S Jan ‘ NA5 How to coordinate and structure GGF participation and other standard activities. Unfunded resources should become available soon (if possible) Coordinator needs to be hired

EGEE all activity W/S Jan ‘ Steps to be done between now and the project startup + 3 months (NA1+NA5) CA, administrative and management structure in place, new TA, contract signature, establish reporting relations to new CERN management, adapt to LCG new plans NA1: Negotiation completed on Jan 8 th at 23:27! A written confirmation expected in the next few days Consortium Agreement to be finalized by 31 January 04 Major milestone to have PO in place and federation infrastructure working by April 1 st In Q1: handle the advance payment and prepare Q1 report Hire financial administrator NA5: Hire coordinator who will drive the work of NA5 Clarify relationships with related projects Produce updated White Paper using unfunded effort for first project conference

EGEE all activity W/S Jan ‘ SA1 ROC managers need to take responsibility for execution plan/organization/reporting CICs vs ROCs needs clarifications Refinement of roles and responsibilities needed Define the available resources Hiring process takes time (people will not be in place by April 1 st ). Unfunded effort needs to be identified as well. Integration of national infrastructures (different technologies) and LCG – how to peer with other infrastructures (like US) Focus now on LCG-2 to provide an operational infrastructure from the beginning, rather than the execution plan. Clarify interactions with JRA1 and Security

EGEE all activity W/S Jan ‘ Steps to project start-up (SA1) Hiring Refine roles and interactions between CIC, ROC, NOC and other operational organisations Clarify interactions with JRA1 Clarify security issues Clarify relationship to international grid projects for VO’s that are larger than EGEE (LCG, other HEP,…) Understand national infrastructure integration issues What requirements will this place on operations, mw, processes, security, etc. Set up basic policy frameworks: How VOs access resources, limitations, rules, etc – sufficient that infrastructure can be exploited from project start Identify sites willing to run development service (based on EDG tb sites?) Set up OMC team Organise membership of QA, Security, Requirements, etc. groups Define transition process from LCG operations to EGEE operations

EGEE all activity W/S Jan ‘ SA2 Well advanced WBS 2 funded people need to be hired Requirement collections and SLS definition with NA4 Relations with SA1 (GOCs and NOCs) Relations with GN2/DANTE Change in activity management

EGEE all activity W/S Jan ‘ steps to be done between now and the project startup (SA2) Hiring people Organize close collaboration with DANTE Synchronize work and deliverable with GN2 SA2 management transition

EGEE all activity W/S Jan ‘ JRA1 To progress with execution plan must resolve: ARDA prototype scope, goals and structure Responsibilities for support of LCG software (c.f. SA1) Relationship to security components and how they fit into the product breakdown structure (c.f. JRA3) Hiring is underway but takes considerable effort and currently manpower details are not yet known Relationships to applications, in particular non-physics ones.

EGEE all activity W/S Jan ‘ Steps needed before project startup (JRA1) Finalize hiring and Complete table 4.5 of the EP for all partners Define training needs Identify tools people from CNRS There is milestone et PM3 Identify testing sites NIKHEF expressed interest RAL is interested Setup Engineering Management Team Define membership into Security group Define membership in QA Group Define membership in Architecture Team & Chief Architect Write development and implementation guides Complete the ARDA services document Check compatibility with non-Physics applications Validate security model Start the ARDA prototyping activity (with EGEE unfunded effort) Understand the support model as proposed by SA1 Define a process to obtain SA1 requirements Clusters to come with a task breakdown

EGEE all activity W/S Jan ‘ JRA2 Execution plan well advanced and being used as an example by other activities Initial subset of procedures, guides and templates available Many tools for use within the project (related to activity management) selected and setup for use within the project Still need to identify tools for managing project membership and project tracking CNRS needs to hire one person Need to establish QAG Finalise EU reporting procedure Complete set of templates

EGEE all activity W/S Jan ‘ Steps to be done between now and the project startup (1st April 2004) (JRA2) One person to be hired by CNRS Finalise the EU reporting procedure Find a tool to collect automatically the effort from the collaborators Complete templates (Quarterly & periodical reports, internal coast claims, …..) Encourage the draft definitions of some main procedures ( e.g. Tests, integration and validation procedures, certification, deployment procedure, support, ….)

EGEE all activity W/S Jan ‘ JRA3 Very early draft of the execution plan urgently needs further work concerning More active engagement of the partners with Identification of key individuals Better integration of the activity with the rest of the project - in particular JRA1 and SA1 Details of Risk analysis, Training needs Clearer definition of the actual work involved in the tasks leading to the deliverables defined Partners claim no new hires are required But the names are not yet released Need clarification of scope and contents of MJRA3.2 setup PMA for European CAs MJRA3.3 (PM4) OGSA SEC initial recommendations for re-engineering - confirm responsibility for this milestone

EGEE all activity W/S Jan ‘

EGEE all activity W/S Jan ‘ JRA4 Well advanced plan Hiring ongoing, contact points with each partner established Possibility of a IPv6 testbed (SA1)? Effort and responsibility distribution needs to be finalized Dialog with JRA1/JRA3 Dialog with JRA4/DANTE/GN2

EGEE all activity W/S Jan ‘ Next steps before project startup (JRA4) Hiring people Set up collaboration with partners (CNRS, DANTE, DFN & GARR) Start dialog with other activities, mainly JRA1 and JRA3 Mutual feedback with DANTE between JRA4 and GN2

EGEE all activity W/S Jan ‘ Major Risks Need to assign priorities to all the risks listed by the activities Late hiring of staff – action from PMB and confirmation of successful completion negotiations Similarly staff leaving before the end of the project – secure follow-on project Possible divergence in scope and schedules of EGEE & LCG Integration and possible divergence of national infrastructures Implications for the whole project (in particular SA1 and JRA1) Needs to be handled on the project level Multi-platform issues not well enough understood

EGEE all activity W/S Jan ‘ Changes requested to the TA General (PO): check consistency of budget against resources identified for partners in each activity taking into account funding model NA4: Add description of the Industrial Forum (Guy Wormser) NA5: Clarify American involvement (Fab) JRA1: Minor update of status for ARDA & HEPCAL (Frédéric Hemmer) NA4: minor rewording (Guy Wormser) SA2: (Franck Bonnasieux) Grnet effort from 0.5 UF/year to 0.25 UF/year Harmonization of milestones and deliverables names) JRA4 (Javier Orellana): maybe move MJRA4.1 to M3 UCL will also work on Performance monitoring

EGEE all activity W/S Jan ‘ Important Steps to be done between now and the project startup Update Technical Annex To be sent to Brussels on 23 rd January Complete Execution Plans for all activities Will be a subject of the weekly PEB meetings (next one 22 nd January) Each activity to take points listed on slide “steps to be done between now and the project startup ” and set dates Increase emphasis on hiring by partners Not having staff in place at the start of the project is a major risk for completing the programme of work Take into account gender action plan Identify unfunded effort Complete websites Need pages for each activity, more general public info and Industrial Forum Tentative date for follow-up All-Activity meeting 15 and/or 16 CERN