0 DOD/DT/CEDCV – October 2015 Milano meeting WP3 Activities Technical and Semantic Interoperability C2-Sense project Milano– 12 th to 14 th October 2015.

Slides:



Advertisements
Similar presentations
Project Management with VIVA PPM Tool (Project Portfolio Management)
Advertisements

B2B standards REGNET INTEGRATION EAI B2B EAI ? A2A ? IAI ? B2B ? Set of processes and technologies dealing with the structural integration of software.
Significant current available technology solutions for C2-Sense project Annex to State of the Art report.
0 DOD/DT/CEDCV – 20 th & 21 st January Paris meeting SAGEM RTD Activities C2-Sense project Paris – 20 & 21 January 2015.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
C2-SENSE WP2 Bojan Božić, Gerald Schimak, Refiz Duro C2-SENSE WP2 Meeting Paris
Review meeting 05th December
SmartER Semantic Cloud Sevices Karuna P Joshi University of Maryland, Baltimore County Advisors: Dr. Tim Finin, Dr. Yelena Yesha.
UKOLN is supported by: OAI-ORE a perspective on compound information objects ( Defining Image Access.
Lecture 13 Revision IMS Systems Analysis and Design.
Software Engineering For Beginners. General Information Lecturer, Patricia O’Byrne, office K115A. –
2007 Adobe Systems Incorporated. All Rights Reserved. 1 Model for the Old Web -> Client Server Server Client.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Development plan and quality plan for your Project
SOA Implementation & Federation SOA General Concepts SOA Implementation, System landscape and Processes – wM 8.2 Federation of Heterogeneous SOA environments.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems WP8: Use case 1: Quality Analysis for Satellite Missions.
ON THE ROAD TO BUSINESS APPLICATIONS OF SEMANTIC WEB TECHNOLOGY Sematic Web in Business - How to Proceed IASW Kari Oinonen Kiertotie 14.
Software Configuration Management
The Preparatory Phase Proposal a first draft to be discussed.
Benchmarking in WP 2.1. Sep 28th, 2004 © R. García-Castro, A. Gómez-Pérez Raúl García-Castro Asunción Gómez-Pérez September 28th, 2004 Benchmarking.
Doc.: IEEE /0047r1 Submission SGIP Liaison Report to IEEE Following the SGIP (2.0) Inaugural Conference Nov 5-7, 2013 Date:
C2-SENSE WP 3 / Task 3.5 (AIT) Bojan Božić, Gerald Schimak, Refiz Duro C2-SENSE WP3 Meeting Paris
 Copyright 2005 Digital Enterprise Research Institute. All rights reserved. Tomas Vitvar SemanticGov 4 rd Planetary.
C2-SENSE T.3.5 & WP4 Organizational Interoperability Ankara.
University of Economics Prague Information Extraction (WP6) Martin Labský MedIEQ meeting Helsinki, 24th October 2006.
MAPPER MAPPER Final Review, Brussels, 9th Apr Model-based Adaptive Product and Process Engineering Work Package 2 Evatronix & advICo Use Case: Collaborative.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 Work Package 1 Title: ‘Analysis of the State of the Art and Development.
L SERVICE DELIVERY Pharmacy Public Health Provider Interoperability Services Data Interchange Legacy System Adapters Simulator Health Service Bus Infrastructure.
 Copyright 2005 Digital Enterprise Research Institute. All rights reserved. Tomas Vitvar, Sanaullah Nazir SemanticGov.
10/18/20151 Business Process Management and Semantic Technologies B. Ramamurthy.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems Communication in the consortium Review meeting Delft,
Software Quality Assurance
BlogForever Project Presentation Vangelis Banos, Project Manager, ALTEC Software Stratos Arampatzis, Dissemination Manager, Tero Dr. Alexandra Cristea,
1 INTEROP WP1: Knowledge Map Michaël Petit (U. of Namur) January 19 th 2004 Updated description of tasks after INTEROP Kickoff Meeting, Bordeaux.
1 / Name / Date IDA Interface for Distributed Automation The journey toward Distributed Intelligence.
International Automation Congress th -31 st October, 2014 The Arrowhead Framework - Future of Cooperative Automation Zsolt Szepessy, Gábor Singler,
INFRAWEBS Intelligent Framework for Generating Open (Adaptable) Development Platforms for Web-Service Enabled Applications Using Semantic Web Technologies,
Demonstrators and Pan-European Services Laboratory WP5 session.
Summary Report Project Name: Infoway Testing Environment Brief Project Description: Develop testing harness to allow for conformance testing of the applications.
Gateway to Research Gateway to Research The Vision: Over the next 2 years, RCUK will work to deliver a web based Portal, single.
Technical Update 2008 Sandy Payette, Executive Director Eddie Shin, Senior Developer April 3, 2008 Open Repositories 2008, Fedora User Group.
Summary Report Project Name: Infoway Testing Environment Brief Project Description: A comprehensive testing environment platform that allows EMR vendors.
 Copyright 2005 Digital Enterprise Research Institute. All rights reserved. Tomas Vitvar SemanticGov 3 rd Planetary.
12-14 October 2015 SRDC C2-SENSE Meeting, Milano C2-SENSE Meeting Mert GENÇTÜRK SRDC Ltd. Milano, October 2015.
Interoperability Testing. Work done so far WSDL subgroup Generated Web Service Description with aim for maximum interoperability between various SOAP.
0 DOD/DT/CEDCV – 25 th & 26 th March 2015 – Ankara meeting WP3 Interfaces C2-Sense project Milan – 12 nd to 14 th Octobre 2015.
WG2 – Enabling Technologies Status of white paper Olaf Droegehorn, Klaus David University of Kassel Chair for Communication Technology (ComTec)
IST project ePerSpace N° IST integrated project ePerSpace Contract N°: Ádám Kapovits, Eurescom 8/11/2004.
EMI INFSO-RI Guidelines and SQA Process Maria Alandes Pradillo (CERN) SA2.2 Task Leader.
WSDL – Web Service Definition Language  WSDL is used to describe, locate and define Web services.  A web service is described by: message format simple.
TCS-ICS interactions Kuvvet Atakan 1 and the WP6 and WP7 Teams 1 University of Bergen / Department of Earth Science.
C2-SENSE WP4 Organizational Interoperability Szymon Dabrowski Milan.
IHE-PCD Testing Supporting Pre-Connectathon and Connectathon Testing John J. Garguilo March 23, 2011.
 Copyright 2005 Digital Enterprise Research Institute. All rights reserved. Tomas Vitvar SemanticGov 4 rd Planetary.
ISHTAR PROJECT WP8 Software Integration. 14/05/2001ISHTAR PROJECT WP82 WP 8 Software Integration and Interfacing WP8 ROLE WP8 is the place where the various.
Wolf Siberski1 Semantic Web Framework Requirements Analysis (D 1.2.2) Wolf Siberski.
Helping the Cause of Medical Device Interoperability Through Standards- based Test Tools DoC/NIST John J. Garguilo January 25,
1 4th of October, 2006 © ATHENA Consortium 2006 B5 EADS CCR piloting Nicolas Figay, EADS Flora Robin, EADS ATHENA Intermediate Review October 2006.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP2 Overview Instituto Pedro Nunes Co-Living 12/3/ Paulo Freitas - Instituto.
Co-ordination & Harmonisation of Advanced e-Infrastructures for Research and Education Data Sharing Research Infrastructures – Grant Agreement n
ISWG / SIF / GEOSS OOSSIW - November, 2008 GEOSS “Interoperability” Steven F. Browdy (ISWG, SIF, SCC)
Presentation of Work Package 6 (WP6) “Design and implementation of Dissemination Activities” MATcHES Kick-off meeting Feb 2014 Ruse, Bulgaria TEMPUS BG-TEMPUS-JPHES.
© The InfoCitizen Consortium Project Presentation Agent based negotiation for inter- and intra-enterprise coordination employing a European Information.
Project Management Status
Elisabetta Ronchieri WP3
C2-SENSE WP2 Meeting Status of Task 2.4
Istituto Nazionale di Statistica – Istat
BioMedBridges – Work Packages 2 & 12
Business Process Management and Semantic Technologies
Web Service Security support in the SSE Toolbox
Presentation transcript:

0 DOD/DT/CEDCV – October 2015 Milano meeting WP3 Activities Technical and Semantic Interoperability C2-Sense project Milano– 12 th to 14 th October 2015

1 DOD/DT/CEDCV – October 2015 Milano meeting C2-Sense – WP3  Working axis : Finalize the module interfaces definition & description -Interfaces description for each module Module development plan & roadmap -Calendar: end of the SW development on December, 2015 / end of the modules test on March, The roadmap progress Define the tests for each module -What kind of tests & methodology for testing the modules one by one ? Discussion. Data models definition -The need of input with legacies data models, and some others from each C2Sense layer, -One data model for all ? Discussion

2 DOD/DT/CEDCV – October 2015 Milano meeting C2-Sense – WP3 WPTaskModule D2.3 ref.OwnerEstimated Due DateDue Date Progress in %Link with other needed modulesActions plan 33.1IP based GW (C2-Sense Gateway)3.16PIAP 31/03/ Sensor Protocol Adapter3.14AIT?31/03/20160ESB 3.2Emergency Application Protocol Adapter SAGEM 31/03/ ESB3.7Lutech 31/03/ WSCT3.11Sagem 31/03/ Data Integrators3.9Lutech 31/03/ Semantic interoperability suite SRDC31/12/201531/03/ Emergency Ontology Creator Tool3.1SRDC 31/03/ Mapping Generator Tool3.2SRDC31/12/201531/03/20160Emergency Ontology Creator ToolProprietary data format is required from end users. 3.5Collaborative Environment :3.15AIT?31/03/ Emergency Maps Tool3.12AIT?31/03/201610OOI Repository, ESB 3.5Sensor Management Tool3.14AIT?31/03/20160OOI Repository, ESB 3.5Messaging/Communication Platform3.8LUTECH 31/03/ Registry of Emergency Web Services PIAP 31/03/ Profile Monitoring Tool3.3SRDC31/12/201531/03/20160Profile Execution Engine 3.5Profile Definition Tool3.4SRDC31/10/201531/03/201680Emergency Ontology Creator Tool 3.5Security and Privacy Tool3.5SRDC31/03/ Profile Repository PIAP 31/03/ Profile Specialization Tool3.4SRDC31/10/201531/03/201650Profile Definition Tool, Profile Execution Engine 4.1SLA Negotiation ToolNALutech 31/03/ Profile Execution Engine3.10Lutech 31/03/2016 ??Conformance and Interoperability testing Mechanism3.6SRDCNA OOI Repository AIT?31/03/201630LimitChecker, Emergency Mapping Tool, ESB LimitChecker AIT?31/03/201610ESB, OOI Repository Generated WebService from WSCT c2-sense 31/03/2016?

3 DOD/DT/CEDCV – October 2015 Milano meeting C2-Sense – WP3  Next three months: End of the Development phase -The whole development of each module on the end of 2015 Test phase -Define tests for each modules  Documents D3.x  Progress report on the WP3 side -Finalisation on the end of November

4 DOD/DT/CEDCV – October 2015 Milano meeting WP3 Delivrables & milestones Milestone(s ) -MS3 : C2-Sense individual components and interoperability profiles o Leader : SAGEM o Delivery : 31/03/16 (T0+24) o Verified by : D3.1, D3.2, D3.3, D3.4, D3.5 (and D4.1, D4.2) WP3 Delivrables Deliverable Number Deliverable Title WP number Lead beneficiary number Nature Dissemination level Delivery date D3.1 Physical Interoperability Profiles and IP based Gateway 37 – PIAPRPUT0+24 D3.2 Protocol Interoperability Profiles and Communication Adapters 32 – LutechRPUT0+24 D3.3 Data/Object Model Interoperability Profiles and Data Integrators and WS Creator tool 31 – SagemRPUT0+24 D3.4 Information Interoperability Profiles and Semantic Interoperability Suite 34 – SRDCRPUT0+24 D3.5Knowledge Interoperability Profiles and Collaboration Environment 33 – AITRPUT0+24