TSG-S Comments to TSG Chairs Regarding Proposed 3GPP2 Restructure Nick Yamasaki Chair, 3GPP2 TSG-S

Slides:



Advertisements
Similar presentations
A Proposal for a Revised Policy Development Process (prop-001-v001) APNIC16 – Address Policy SIG Seoul, Korea 20 August 2003.
Advertisements

Governance & Nominating Committee (GNC) Report WECC Board Meeting – December 6-7, 2007.
MIGRATION MIGR-09. How to Run Your Next Implementation... Don't Let It Run You! Patricia Johnson Senior Systems Consultant Strategic Systems Group, Inc.
3GPP2 TSG-AC Restructuring Source: TSG-C Chairman; Ed Tiedemann With thanks to: TSG-A Chairman; Xiaowu Zhao Copyright Notice 3GPP2 and its Organizational.
Page 1 Norikazu - Nick Yamasaki KDDI Corporation Chair, TSG-S Upcoming Services and Systems Aspects for 3GPP2: 3GPP2 Future Directions and IMT-Advanced.
3GPP2 TSG-SX Restructuring Source: TSG-S Vice Chair; Jane Brownley With thanks to: TSG-C Chairman; Ed Tiedemann, TSG-A Chairman; Xiaowu Zhao, TSG-X Chairman;
Doc.: 802_Handoff_EC_Opening_Plenary_Report r2 Submission November David Johnston, IntelSlide Handoff ECSG EC Opening Plenary Report David.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
Quality Improvement/ Quality Assurance Amelia Broussard, PhD, RN, MPH Christopher Gibbs, JD, MPH.
November 13, 2003IEEE Albuquerque Plenary Session 1 Moving Forward Robert D.Love LAN Connect Consultants C /113.
GNSO Policy Development Process. “The PDP is broken”….. Photo credit: 2013 NYCitywoman.
Text #ICANN51 GNSO PDP Improvements Status Update.
- 0 /9- TTA Views on Criteria for Successful M2M Consolidation August 17~18, 2011 (Washington DC, ATIS Building) TTA M2MCons02_15 (Agenda 4.1)
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:
3G.IP/ R1 3G.IP 2002 Charter. 3G.IP/ R1 2 3G.IP Mission Statement u Actively promote a common IP based wireless system for third generation.
How to Run an Effective Executive Committee Meeting  Diana Stegall, CSP, CFPS, ARM, ALCM, CPCU  RVP Region 5 - Northwest Chapter – President
GAC-GNSO Consultation Group On GAC Early Engagement in GNSO PDP London Progress Report 22/06/2014.
Possible 3PP2 Changes Ed Tiedemann Chair, 3GPP2 TSG-C 6 August 2012.
PDP Improvements Update & Discussion. | 2 Background  Ten proposed improvements aimed to streamline and enhance the GNSO PDP Ten proposed improvements.
Market Meeting Support Susan Munson ERCOT Retail Market Liaison Commercial Operations Subcommittee (COPS) June 10, 2008.
M2M Consolidation August 17-18, 2011 Washington D.C. 1 ARIB/TTC’s Feedback on Consolidation Issues M2MCons02_06.
1 Nick Yamasaki Chair, TSG-S 04 December 2008 Review of TSG-S Activities in 2008.
GAC-GNSO Consultation Group On GAC Early Engagement in GNSO PDP London Progress Report 22/06/2014.
SCFAH Title: Draft Baseline Ad-Hoc Recommendation to SC on 3GPP2 Future Source: J. Brownley, Ad-Hoc Chair Abstract: This is a proposed draft.
SCFAH r1 Title: Working Draft “Ad-Hoc Recommendation to SC on 3GPP2 Future” Source: 3GPP2 Future Ad Hoc Abstract: This is the draft baseline.
TSG-S OMA AD-HOC RECOMMENDATIONS TSG-S OMA AdHoc.
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
JJ Jamieson MIC Chair JGC update September 2014 Salt Lake City.
CGMS-40, 5 November 2012 Coordination Group for Meteorological Satellites - CGMS Towards a CGMS High Level Priority Plan (HLPP)
A Review of Policy Development Processes in the Asia Pacific Region Address Policy SIG APNIC 15, Taipei, Taiwan 27 February 2003.
Reconfiguring Nodal Stakeholder Participation Presentation to the ERCOT Technical Advisory Committee Texas Nodal Transition Planning Task Force February.
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
TSG-S Project Coordination Recommendations Nick Yamasaki TSG-S Chair ABSTRACT: This document presents TSG-S recommendations for improved coordination of.
1 [4.7]a Structure of M2M Consolidation SDOStructureComment Overall Goals of Structure: Be responsive to the needs of the vertical market stakeholders.
1 ISO/PC 283/N 197 ISO Current status of development November 2015.
TDTWG Update to RMS Wednesday January 14. TDTWG Update to RMS Scope Texas Data Transport Working Group (TDTWG) is responsible for creating and maintaining.
TSG-S OMA (Open Mobile Alliance) Ad-Hoc Report Richard Robinson Chair - 3GPP2 TSG-S SC B_Eshwar Pittampalli’s (Lucent) comments/concerns embedded.
TSG-S OMA AD-HOC RECOMMENDATIONS TSG-S OMA AdHoc.
SCFAH Title: Draft Baseline Ad-Hoc Recommendation to SC on 3GPP2 Future ver2 Source: J. Brownley, Ad-Hoc Chair Abstract: This is a proposed.
Introduction to 3GPP2 cdma2000 Technology Workshop Ms. Jane Brownley Chair, 3GPP2 Steering Committee
Welcome Ms. Cheryl Blum Chair, 3GPP2 Steering Committee
Future Meetings for TSG-S TSG-S Chair Nick Yamasaki (KDDI) 21 July
Machine-to-Machine(M2M) Communication for cdma2000 Systems Orlett W. Pearson, 3GPP2 Liaison Report to TR-50 August 2012.
Key Functions & Responsibilities (from the old governance document) – Coordinates the program-level adaptive management system and assists the GITs in.
Doc.: IEEE /0147r0 Submission January 2012 Rolf de Vegt (Qualcomm)) Slide ai Spec Development Process Update Proposal Date:
Program Management Team Framework Strawman Vancouver June 2001 Sprint PCS ®
Board Chair Responsibilities As a partner to the chief executive officer (CEO) and other board members, the Board Chair will provide leadership to Kindah.
SCFAH r2 Title: “Ad-Hoc Recommendation to SC on 3GPP2 Future” – Working Draft Source: 3GPP2 Future Ad Hoc Abstract: This is the draft baseline.
3GPP2 Restructuring Source: TSG-A Chairman; Xiaowu Zhao TSG-C Chairman; Ed Tiedemann TSG-S Chairman; Nick Yamasaki TSG-X Chairman; Marvin Bienn Copyright.
3GPP2 TSG-SX Structure & Working Procedure Source: TSG-SX Chairman: Xiaowu(Frankle) Zhao TSG-SX Vice-Chair: Yuezhen Wang/Mike Dolan, Copyright Notice 3GPP2.
Introduction to 3GPP2 cdma2000 Technology Workshop Ms. Jane Brownley Chair, 3GPP2 Steering Committee
1 Source:Bob Plunkett TSG Coordination Ad Hoc Chair Copyright Statement The contributor grants a free, irrevocable license to 3GPP2 and its Organizational.
Ec-12-0xyz EC Rules November 2012 James Gilb (Tensorcom) IEEE 802 Rules Update November 2012 meeting.
TSG-S OMA (Open Mobile Alliance) Ad-Hoc Report Richard Robinson Chair - 3GPP2 TSG-S SC D.
VIA Telecom PROPRIETARY 3GPP2 Directions Ed Tiedemann Chair TSG-AC 13 November 2013 Copyright Notice 3GPP2 and its Organizational Partners claim copyright.
20 September 2004 C R4 0 Proposed Process for TSG-C Work Items Source Alberto Gutierrez Motorola
3GPP2 Special Workshop on 3GPP2 Future Directions and IMT-Advanced Initial Workshop Report Ed Tiedemann (Qualcomm)Chair Clif Barber (KDDI)Secretary
TSG-S OMA (Open Mobile Alliance) Ad-Hoc Report Richard Robinson Chair - 3GPP2 TSG-S SC B.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
IT-CM Group Meeting Tim Bell 12th January 2016
3GPP Status.
Standards Development: An Overview
IC DRAFT REPORT IEEE 802 Network Enhancements for the Next Decade Report Date: 13 November 2018 Chair: Roger Marks, Huawei (since March 2018) Participants:
Prepared at the Joint Meeting For SDCG for GFOI / GEOGLAM / LSI-VC
Chair: Roger Marks, Huawei (since March 2018)
Coordinate Operations Standard
IEEE 802 2nd Vice Chair last name at ieee dot org
Proposed Way Forward for LSI-VC, SDCG for GFOI, and GEOGLAM
Presentation transcript:

TSG-S Comments to TSG Chairs Regarding Proposed 3GPP2 Restructure Nick Yamasaki Chair, 3GPP2 TSG-S

HIGH LEVEL EFFICIENCES TO BE CONSIDERED WHEN EVALUATING 3GPP2 REORG OPTIONS Efficiency of Resources (1) Meeting Rooms: TSG-S believes that 5 meeting rooms + the 3GPP2 Office as a floating backup should be sufficient to cover f2f meetings. At least one (1) MAY need to be big enough to support a joint meeting of most/all attendees. Support Staff: Support staff will be needed for each active TSG unless the Leadership or member volunteers to assume that responsibility.

HIGH LEVEL EFFICIENCES TO BE CONSIDERED WHEN EVALUATING 3GPP2 REORG OPTIONS Efficiency of Resources (2) Leadership: The more TSGs and WGs/SWGs, the more leadership volunteers will be required from member companies. On the other hand, reducing the number of TSGs will reduce the ability of each OP to participate at the TSG leadership level.

HIGH LEVEL EFFICIENCES TO BE CONSIDERED WHEN EVALUATING 3GPP2 REORG OPTIONS Efficiency of Resources (3) Company Participation Fees: – A reduced number of TSGs may help member companies to reduce the number of people they send (e.g., one (1) person per TSG). Companies who provide wide spread support for technical development activities may need to send more than one (1) person to cover multiple WGs and SWGs for groups that meet concurrently." – Since Plenaries are typically run at the beginning and the end of the week, concurrent TSG Plenary sessions will preclude one (1) person from covering multiple TSG Plenary sessions

HIGH LEVEL EFFICIENCES TO BE CONSIDERED WHEN EVALUATING 3GPP2 REORG OPTIONS Efficiency of Management and Communication involves a trade-off between the following: Combining of TSGs will support very efficient communications and increased operational coordination within a given TSG. Combining of TSGs MAY result in “deeper” TSG structures which includes more overhead to filter issues up to the Plenary level for decision unless the scope and charter of the new TSG provides otherwise.

Merger of TSG-S and TSG-X Issues and Concerns (1) TSG-S was initially implemented as an independent organizational entity to address cross-TSG initiatives (e.g., requirements. architecture, program management, and security) with equal consideration toward all TSGs. By incorporating TSG-S functions into a new merged TSG (i.e., TSG-SX), the structure as well as the scope and charter has to be such that cross-TSG initiatives continue to be addressed with equitable consideration for all TSGs.

Merger of TSG-S and TSG-X Issues and Concerns (2) Of the TSG-S functions so impacted, the PMT is empowered to manage tasks on behalf of the SC (e.g., WI/Work Planning, Release Planning, maintenance/management of the SC document library, and direct reporting at SC meetings). As such, the 3GPP2 reorg may want to consider making the PMT an SC level group that meets at all f2f meetings but is independent of any TSG.

Merger of TSG-S and TSG-X Issues and Concerns (3) The Security group (currently TSG-S WG4) requires the following levels of autonomy for their operations: – Flexibility to meet and provide security consultancy to other WGs in both TSG-SX & TSG-AC in a timely manner (e.g., as allowed by S.4 Terms of Reference/scope). – Security group is likely not going to meet at all of the future TSG-SX super meetings. When it does meet, a maximum of 6 hours of meeting time - so, they don't need a dedicated room for security group, but would be able to share with some other lightly loaded group(s). – Flexibility to schedule conference calls focused on security topics independent of other competing work items as required based on workload & allow for faster development of specs. The current TSG-S WG4 autonomy was granted by the TSG-S Plenary. The same type of autonomy could be granted at any organizational level (e.g., WG, SWG, AdHoc) if approved by that TSG Plenary.

Merger of TSG-S and TSG-X Issues and Concerns (4) The Vision function could be a TSG-SX level AdHoc as another option to those presented in S AR1, considering the cross-TSG function and the limited activities anticipated going forward. Work planning (including work item processing) for TSG-SX should be combined into a single group. The 3GPP2 architecture has been jointly developed in TSG-S WG2, TSG-X MMD, and TSG-X PDS and placing 3GPP2 architecture task in TSG-SX MM is consistent with past practice. It is probably more efficient to place 3GPP2 architecture in TSG-SX MM or PDS instead of in some other work group (e.g. TSG-SX WG1).