Legislative Overview  This quick module outlines in more detail the background of the legal requirements.

Slides:



Advertisements
Similar presentations
Jamie Petersen Administrative Assistant - Stormwater Front Desk: (402) Michael Crisco Program Specialist – Storm.
Advertisements

GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Alaska Association of Harbormasters and Port Administrators Wrangell, Alaska October 26, 2010 Shane Serrano ADEC.
SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
Stakeholders Meeting – March 5, 2014 Selvin T. Southwell, P.E.
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
Construction Site Stormwater Compliance Presentation for CALBIG October 9, 2013 Kristin Kerr, P.E., QSD EOA, Inc. on behalf of the San Mateo Countywide.
What is NPDES? “National Pollutant Discharge Elimination System”
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Arkansas Storm Water Program Arkansas Update On Construction, Industrial & Small MS4.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Env 247 Overview of Stormwater Management March 1, 2011.
Pretreatment, Pollution Prevention and Storm Water Committee California’s Storm Water Program Bruce A. Fujimoto State Water Resources Control Board February.
Overview of RIPDES Construction General Permit Requirements Developed by: Greg Goblick, Laura Stephenson RI Department of Environmental Management RIPDES.
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
Construction and State Storm Water Permits What does it all mean? February 5, 2015Casper Workshop1.
Introduction to Construction General Permit Inspections.
RIPDES Storm Water Program: Large and Small Construction.
 Why are we here?  Without regulations, rivers used to catch fire. Rules and Regulation.
NYS Department of Environmental Conservation DRAFT SPDES General Permit for Stormwater Discharges from Separate Storm Sewer Systems (MS4s) (GP )
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Module 1: Stormwater Permit Program Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
MS4 Remand Rule Intergovernmental Associations Briefing September 15, 2015.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
EPA’s Stormwater Rulemaking: How Potential Changes in the NPDES Stormwater Regulations Could Impact the Design of Stormwater Controls Rachel Herbert USEPA/OW/OWM/WPD.
Stormwater Control & Design
Stormwater Management for Colleges and Universities Phase II for Colleges and Universities State Stormwater Programs Industrial Facilities.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Urban Programs. Urban Programs - ESC Virginia Erosion and Sediment Control (ESC) Law –Approved in –Title 10 of the Code of Virginia. “Each District.
Stormwater Regulations NC Division Of Water Quality DPPEA Technical Sharing Session May 25, 2004.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
MWCOG Water Resource Workshop “Preparing for Regulatory Change” February 20, 2004 Track 2: Panel #4 - Storm Water MS4 Regulation Paula Estornell, USEPA,
Erosion and Sediment Control Programs at the Cities of Colleyville, Keller, Grapevine, Southlake, and Trophy Club Jimmy Brock, City of Colleyville Keith.
Introduction to NPDES Permits Introduction to NPDES Permits NPDES = National Pollutant Discharge Elimination System. Permit system required by Section.
Public Workshop: RIPDES Draft Phase II Storm Water Regulations RI Department of Environmental Management RIPDES Storm Water Program July 25, 2001 Contacts:
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013.
Elizabeth Miller Jennings Office of the Chief Counsel State Water Resources Control Board Peter Bowes 5/20/2009 Flickr REGULATION OF STORM WATER DISCHARGES.
NYS Department of Environmental Conservation Flow Standard Amendment to New York’s Water Quality Standards Regulations Scott J. Stoner Chief, Standards.
Urban Runoff Greg Gearheart Christine Sotelo Eric Berntsen State Water Resources Control Board.
 The Illinois Environmental Protection Act is silent with regard to storm water.  Illinois EPA’s authority to deal with storm water derives from delegated.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Pollution Control: For Field Office Construction Sites.
Expectations for Construction Activities The City of Hendersonville Department of Public Works Erosion Control Inspection Review Process Power Point Presentation.
THE NEW CLEAN WATER ACT E-REPORTING RULE: WHAT ELECTRONIC DATA REPORTING AND SHARING MEAN FOR YOUR OPERATIONS By: Damien M. Schiff Principal Attorney Pacific.
Municipal Separate Storm Sewer System (MS4) Permit
Iowa Certified Construction Site Pollution Prevention Inspector
Concentrated Animal Feeding Operations (CAFOs) National Pollutant Discharge Elimination System (NPDES) CAFO Rule and the Proposed Idaho NPDES CAFO General.
National Environmental Policy Act of 1969
EPA Public Meeting Dallas, Texas May 10, 2005
National Act Regulated by EPA
John Tinger U.S. EPA Region IX
Stormwater Pollution Prevention Plans
CLEAN WATER ACT (1972) EPA DESIGNATED TO ASSURE COMPLIANCE WITH THE ACT NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) MS4 GENERAL PERMIT ADMINISTERED.
Flow chart to determine whether coverage is required
TPDES Construction General Permit Compliance
Illicit Discharge Detection & Elimination (IDDE) Plan
Multi-Sector General Permit: MSGP
Stormwater Construction General Pemit (CGP) TXR150000
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

Legislative Overview  This quick module outlines in more detail the background of the legal requirements.

Stormwater Regulations Federal Clean Water Act EPA Stormwater Regulations - Phase I / Phase II Title 40 Code of Federal Regulations (CFR) Parts (122.26) NYS State Pollutant Discharge Elimination System (SPDES) ECL Article 17 DEC Regulations 6NYCRR NYS DEC is “permitting agency”

Regulatory History: EPA Stormwater Program  Phased approach required by the 1987 Amendments to the Clean Water Act  Phase I addressed: Facilities permitted before 1987 Certain Industrial Activities Medium and Large Municipalities Construction Activities > 5 acres  Phase II was left to address other sources of urban stormwater

NY STORMWATER SPDES GENERAL PERMITS  Construction Activity GP (Phase I) Regulates Construction activity with site disturbances of 5 or more acres Disturbance – includes clearing, grading, grubbing, filling or excavating as well as construction activities

SPDES General Permit Procedure for Obtaining Coverage (under Phase I)  Develop Stormwater Pollution Prevention Plan (SWPPP) using GP or GP  Submit the Plan to local authority ( Construction GP )  File Notice of Intent, Transfer or Termination (NOITT) form with NYSDEC (Albany) and local authority NOITT must be filed at least 48 hours prior to start of regulated activity 48 hours prior to a change in operator NOITT must be filed NOITT must be filed once coverage under the permit can be terminated

Phase II Final Rule  Signed on October 29, 1999  Published in the Federal Register on December 8, 1999  Rule and fact sheets available at:

Phase II Stormwater Regulations… automatically cover two major areas : 1.“Operators” of small MS4s located in “urbanized areas” 2.“Operators” of construction activities that disturb greater than 1 acre of land (statewide) 1.Control of stormwater from small MS4s 2.On-site management of stormwater from small construction projects 1.Operators to develop comprehensive stormwater management plans and submit the NOI to DEC 2.Operators to submit Notice of Intent to DEC, develop a SWPPP and comply with local or other regulations What are the basic responsibilities of the operators? How will these responsibilities be accomplished?