BUAD306 MRP.

Slides:



Advertisements
Similar presentations
Material Requirements Planning
Advertisements

To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 15 Resource Planning.
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
Material Requirements Planning
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
MRP and Related Concepts
Material Requirements Planning (MRP)
CHAPTER MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
21–1. 21–2 Chapter Twenty-One Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
1 Chapter 15 MRP and ERP. 2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant.
MRP, MRP II, and ERP.
Chapter 12 MRP and ERP.
Material Requirement Planning (MRP)
Material Requirements Planning
Chair Seat Legs (2) Cross bar Side Rails (2) Cross bar Back Supports (3) Leg Assembly Back Assembly Level Product Structure Tree.
MRP Material Requirements Planning. MRP …is a planning and scheduling technique used for batch production of assembled items. … is a computer-based information.
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
13-1MRP and ERP. 13-2MRP and ERP  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements.
Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 14 MRP and ERP.
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 18 Materials Requirements Planning.
Operations Management Material Requirements Planning
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
Chapter 16 Inventory Systems for Dependent Demand
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Material Requirements Planning
Materials Requirements Planning
Chapter 15 MRP and ERP.
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management Chapter 15 Roberta Russell.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. MRP (Material Requirement Planning) (Method under Dependent.
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Chapter 15 Resource Requirements Planning: MRP and CRP.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Master Production Scheduling
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
Resource Planning Chapter 15.
Materials Requirements Planning
Manufacturing Systems Engineering
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
11-1  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements for end items into time-phased.
Chapter 12: Learning Objectives Instructor Slides You should be able to: 1.Describe the conditions under which MRP is most appropriate 2.Describe the inputs,
CHAPTER-14 MRP AND ERP MD. TAZIDUL ISLAM. 2  Material Requirement Planning (MRP) is the concept of designing and developing information system to aid.
15-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 MRP and ERP.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
MRP and ERP  Material Requirements Planning (MRP) is a software based production planning and inventory control system used to manage manufacturing processes.
Chapter 13 MRP: Material Requirement Planning ERP: Enterprise Resource Planning.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
SISTEM INFORMASI ENTERPRISE
Master Production Scheduling (MPS)
MRP and ERP Chapter 14 Dr. H. Kemal İlter, BE, MBA, DBA
Facility Inventory Old Facilities Modern Facilities Classroom Size
Lecture 34 MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
BUAD306 MRP/ERP.
Chapter 16 Materials Requirements Planning
MRP and ERP.
CHAPTER 14 MRP and ERP.
Material Requirement Planning (MRP)
MRP and ERP.
14 MRP and ERP.
Material Requirement Planning (MRP)
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

BUAD306 MRP

Disaggregating & Why It’s Important Enables managers to take aggregate plan and break it down into actual units being produced Especially important in companies with multiple product lines Show quantities and timing of items to be produced (specific products) Enables rough cut capacity planning to test feasibility Feeds the MRP process

Materials Requirement Planning (MRP) A computerized inventory control and production planning system for dependent demand inventories (individual parts that make up a final product). Objective: To ensure that material is available when needed and to maintain the lowest possible level of inventory.

Dependent Demand Items are used internally to produce a final product Production of cookies Production of furniture

MRP Impacts Inventory levels Purchasing materials Manufacturing activities Delivery schedules

MRP Questions MRP is designed to answer these three questions: What is needed? How much is needed? When is it needed?

MRP Inputs MRP Outputs Master Production Schedule Material Requirements Planning Bill of Materials Inventory Master File Planned Order Releases MRP Outputs Work Orders Purchase Orders Rescheduling Notices

MRP Uses Dependent and discrete items (where demand varies) Complex products Job shop production (where each job takes a different path through the system) Assemble-to-order environments (previously completed subassemblies are configured to order)

Master Production Schedule Drives MRP process with a schedule of finished products Quantities represent production not demand Quantities may consist of a combination of customer orders & demand forecasts Quantities represent what needs to be produced, not what can be produced

Terms of Production Time Periods/Buckets – how long it takes to execute portions of the master schedule tasks Cumulative lead time - the total length of time needed to manufacture a product Time fence - a date beyond which no changes in the master schedule are allowed

Bill of Materials (BOM) The list of items that go into the product Includes a brief description of each item Specifies when and in what quantity each item is needed in the assembly process Created with Product Structure Tree

Product Structure Tree Visual depiction of the BOM requirements– where all components are listed by level Chair

Example 1 - Product Structure Tree Seat Back Assembly Front Leg Assembly Chair

Chair Seat Example 1 - Product Structure Tree Leg Assembly Back Side Rails w/ Back Legs (2) Cross bar Back Supports (3) Front Legs (2) Cross bar

Example 2 - Product Structure Tree for Product X Level X 1 B(4) C 2 D(3) E(2) E(2) F(2) What total quantity of each component (B, C, D, E and F) is needed to produce one X? 3 E(4)

Inventory Master File A database of information on every item produced, ordered, or inventoried Cycle Counting – Taking physical counts of at least some inventory items reconciling differences as they occur

What if you needed 10 X’s and we had the following inventory: Example 2 - Product Structure Tree for Product X Level X 1 B(4) C 2 D(3) E(2) E(2) F(2) What if you needed 10 X’s and we had the following inventory: B – 4 C – 10 D – 8 E – 60 F - 10 3 E(4)

Terms of Production Time Periods/Buckets – how long it takes to execute portions of the master schedule tasks Cumulative lead time - the total length of time needed to manufacture a product Time fence - a date beyond which no changes in the master schedule are allowed

MRP EXAMPLE 1: The table below lists the components needed to assemble an end item, lead times, and quantities on hand. If 30 units of the end item are to be assembled, how many additional units of E are needed? (HINT: You do not have to develop an MRP to do this) End item B (2) C D (3) E (2) F (3) G (2) H (4)

MRP EXAMPLE 2 – CUMULATIVE LEAD TIME: An order for the end item is scheduled to be shipped at the start of week 11. What is the latest week that the order can be started and still be ready to ship on time? (You do not have to develop an MRP) End item B (2) C D (3) E (2) F (3) G (2) H (4)

Time-Phased Plan Lot-for-lot: the order or run size for each period is set equal to the demand for that period.

MRP Processing Takes the end item requirements specified by the master schedule and “explodes” them into time-phased requirements for assemblies, parts, and raw materials using the bill of materials offset by lead times.

MRP Processing Terms Gross Requirements: Total expected demand for an item or raw material in a time period. Scheduled Receipts: Open orders scheduled to arrive from vendors or elsewhere in the pipeline. Projected on hand: Expected amount of inventory that will be on hand at the beginning of each time period

MRP Processing Terms Net Gross Projected Requirements = Requirements - inventory + Safety in period t in period t in period t stock Net requirements: The actual amount needed in each time period Planned-order releases: Planned amount to order in each time period; planned-order receipts offset by lead time

MRP EXAMPLE 1 – MRP SCHEDULE A product structure tree for end item X is below. A manager wants to know the materials requirements for ordered part R that will be needed to complete 120 units of X by the start of week 5. Lead times for items are one week for level 0 and level 1 items and 2 weeks for level 2 items. There is a scheduled receipt of 60 units of M at the END of week 1 and 100 units of R at the START of week 1. Lot for lot ordering is used. X Level 0 M (3) I (2) Level 1 R (2) Level 2 P N (4) V

MRP EXAMPLE 1a – MRP SCHEDULE A product structure tree for end item X is below. A manager wants to know the materials requirements for ordered part R that will be needed to complete 120 units of X for the start of week 6 and 150 for the start of week 8. Lead times for items are one week for level 0 and level 1 items and 2 weeks for level 2 items. There is a scheduled receipt of 60 units of M at the END of week 1 and 100 units of R at the START of week 1. Lot for lot ordering is used. X Level 0 M (3) I (2) Level 1 R (2) Level 2 P R (4) V

MRP EXAMPLE 1b – MRP SCHEDULE A product structure tree for end item X is below. A manager wants to know the materials requirements for ordered part R that will be needed to complete 150 units of X for the start of week 6 and 200 for the start of week 8. Lead times for items are one week for X and M and 2 weeks for all other items. There is a scheduled receipt of 60 units of M at the END of week 1 and 100 units of R at the START of week 1. Lot for lot ordering is used. X Level 0 M (3) I (2) Level 1 R (2) Level 2 P R (4) V

MRP EXAMPLE 1c – MRP SCHEDULE Demand for X: 100 in SOW 7 All LTs = 1 week 100 in SOW8 60 Ms to arrive in EOW1 100 Rs to arrive SOW1 I has a minimum order requirement of 500 units M must be ordered in BATCHES of 300 X Level 0 M (3) I (2) R (2) Level 1 R (2) Level 2 P R (4) V

MRP HW # 5 End item P is composed of three subassemblies: K, L and W. K is assembled using 3Gs and 4 Hs. L is made of 2 Ms and and 2 Ns. W is made of 3 Zs. On hand inventories are 20 Ls, 40 Gs, and 200 Hs. Scheduled receipts are 10 Ks at the start of week 3, 30 Ks at the start of week 6, and 200 Ws at the start of week 3. One hundred Ps will be shipped at the start of week 6 and another 100 at the start of week 7. Lead times are two weeks for subassemblies and one week for components G, H and M. Final assembly of P requires one week. Include an extra 10% scrap allowance in each planned order of G. Minimum order size for H is 200.