Radiological Issues for Thin Liquid Wall Options L. El-Guebaly, P. Wilson, and D. Henderson Fusion Technology Institute University of Wisconsin - Madison.

Slides:



Advertisements
Similar presentations
Thin Liquid Wall Protection Concepts for IFE Reactors Elsayed A. Mogahed Fusion Technology Institute University of Wisconsin-Madison ARIES Meeting in Madison.
Advertisements

September 24-25, 2003 HAPL meeting, UW, Madison 1 Armor Configuration & Thermal Analysis 1.Parametric analysis in support of system studies 2.Preliminary.
October 16-19, 2000 A. R. Raffray, et al., ARIES-AT Blanket and Divertor, ANS Top. Meet. On TOFE ARIES-AT Blanket and Divertor A. R. Raffray 1,
SYSTEMS AND ENGINEERING TECHNOLOGY INVESTIGATION OF AN INERTIAL CONFINEMENT FUSION-FISSION HYBRID REACTOR Kiranjit Mejer PTNR Research Project 2009 Frazer-Nash.
Views on Neutronics and Activation Issues Facing Liquid-Protected IFE Chambers L. El-Guebaly and the ARIES Team Fusion Technology Institute University.
Benefits of Radial Build Minimization and Requirements Imposed on ARIES Compact Stellarator Design Laila El-Guebaly (UW), R. Raffray (UCSD), S. Malang.
Feasibility of Recycling Hohlraum Wall Materials L. El-Guebaly, P. Wilson, D. Henderson, and A. Varuttamaseni Fusion Technology Institute University of.
Overview of radioactivity vs. chemical toxicity issues for Overview of radioactivity vs. chemical toxicity issues for potential target materials presented.
Initial Results from ARIES-IFE Study and Plans for the Coming Year Farrokh Najmabadi for the ARIES Team Heavy-ion IFE Meeting July 23-24, 2001 Lawrence.
DAH, UW-FTI ARIES-IFE, April 2002, 1 Results from parametric studies of thin liquid wall IFE chambers D. A. Haynes, Jr. Fusion Technology Institute University.
ARIES-CS Radial Build Definition and Nuclear System Characteristics L. El-Guebaly, P. Wilson, D. Henderson, T. Tautges, M. Wang, C. Martin, J. Blanchard.
January 8-10, 2003/ARR 1 Plan for Engineering Study of ARIES-CS Presented by A. R. Raffray University of California, San Diego ARIES Meeting UCSD San.
Assessment of Chamber Concepts for IFE Power Plants: The ARIES-IFE study Farrokh Najmabadi for the ARIES Team IFSA2001 September 9-14, 2001 Kyoto, Japan.
First Wall Thermal Hydraulics Analysis El-Sayed Mogahed Fusion Technology Institute The University of Wisconsin With input from S. Malang, M. Sawan, I.
June 14-15, 2006/ARR 1 ARIES-CS Power Core Engineering: Updating Power Flow, Blanket and Divertor Parameters for New Reference Case (R = 7.75 m, P fusion.
June 14-15, 2007/ARR 1 Trade-Off Studies and Engineering Input to System Code Presented by A. René Raffray University of California, San Diego With contribution.
Recycling Issues Facing Target and RTL Materials of Inertial Fusion Designs L. El-Guebaly, P. Wilson, M. Sawan, D. Henderson, A. Varuttamaseni and the.
1 ANS 16 th Topical Meeting on the Technology of Fusion Energy September , 2004 Madison, Wisconsin.
ARIES Meeting April 22-23, 2002 U. Wisconsin, Madison Work performed under the auspices of the U. S. Department of Energy by University of California Lawrence.
Impact of Liquid Wall on Fusion Systems Farrokh Najmabadi University of California, San Diego NRC Fusion Science Assessment Committee November 17, 1999.
Design Windows for IFE Chambers and Target Injection Farrokh Najmabadi for the ARIES Team US/Japan Workshop on Target Fabrication December 3-4, 2001 General.
November 4-5, 2004/ARR 1 ARIES-CS Power Core Options for Phase II and Focus of Engineering Effort A. René Raffray University of California, San Diego ARIES.
November 8-9, Blanket Design for Large Chamber A. René Raffray UCSD With contributions from M. Sawan (UW), I. Sviatoslavsky (UW) and X. Wang (UCSD)
Action Items For ARIES-IFE Study Farrokh Najmabadi ARIES Project Meeting June 19-21, 2000 University of Wisconsin, Madison Electronic copy:
Safety assessment for Safety assessment for potential target materials: radioactivity vs. chemical toxicity presented by: Susana Reyes ARIES Group Meeting.
Findings and Recommendations from Wetted-Wall IFE Designs Jeff Latkowski Lawrence Livermore National Laboratory March 9, 2001 Work performed under the.
October 24, Remaining Action Items on Dry Chamber Wall 2. “Overlap” Design Regions 3. Scoping Analysis of Sacrificial Wall A. R. Raffray, J.
ARIES-IFE Assessment of Operational Windows for IFE Power Plants Farrokh Najmabadi and the ARIES Team UC San Diego 16 th ANS Topical Meeting on the Technology.
Radial Build Definition for Solid Breeder System Laila El-Guebaly Fusion Technology Institute University of Wisconsin - Madison With input from: S. Malang.
Status of 3-D Analysis, Neutron Streaming through Penetrations, and LOCA/LOFA Analysis L. El-Guebaly, M. Sawan, P. Wilson, D. Henderson, A. Ibrahim, G.
Aug. 8-9, 2006 HAPL meeting, GA 1 Advanced Chamber Concept with Magnetic Intervention: - Ion Dump Issues - Status of Blanket Study A. René Raffray UCSD.
Highlights of ARIES-IFE Study Farrokh Najmabadi VLT Conference Call April 18, 2001 Electronic copy: ARIES Web Site:
June19-21, 2000Finalizing the ARIES-AT Blanket and Divertor Designs, ARIES Project Meeting/ARR ARIES-AT Blanket and Divertor Design (The Final Stretch)
Idaho National Engineering and Environmental Laboratory Update on IFE Aerosol Analysis J.P. Sharpe INEEL Fusion Safety Program.
Summary of FS Lifetime Assessment and Activation Analysis L. El-Guebaly Fusion Technology Institute University of Wisconsin - Madison ARIES E-Meeting October.
1 Radiation Environment at Final Optics of HAPL Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI HAPL GIMM Conference Call.
Initial Activation Assessment for ARIES Compact Stellarator Power Plant L. El-Guebaly, P. Wilson, D. Paige and the ARIES Team Fusion Technology Institute.
March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Status ARIES-AT Blanket and Divertor Design The ARIES Team Presented.
April 3-4, 2007/ARR 1 Engineering Input to System Code and Trade-Off Studies to Assess Sensitivities of Major Functions to Engineering Parameters Presented.
Minimum Radial Standoff: Problem definition and Needed Info L. El-Guebaly Fusion Technology Institute University of Wisconsin - Madison With Input from:
Development of the FW Mobile Tiles Concept Mohamed Sawan, Edward Marriott, Carol Aplin University of Wisconsin-Madison Lance Snead Oak Ridge National Laboratory.
HAPL WORKSHOP Chamber Gas Density Requirements for Ion Stopping Presented by D. A. Haynes, Jr. for the staff of the Fusion Technology Institute.
Fusion-Fission Hybrid Systems
Neutronics Parameters for Preferred Chamber Configuration with Magnetic Intervention Mohamed Sawan Ed Marriott, Carol Aplin UW Fusion Technology Inst.
October 27-28, 2004 HAPL meeting, PPPL 1 Thermal-Hydraulic Analysis of Ceramic Breeder Blanket and Plan for Future Effort A. René Raffray UCSD With contributions.
1 Solid Breeder Blanket Design Concepts for HAPL Igor. N. Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI With contributions.
February 5-6, 2004 HAPL meeting, G.Tech. 1 HAPL Blanket Strategy A. René Raffray UCSD With contributions from M. Sawan and I. Sviatoslavsky UW HAPL Meeting.
Design study of advanced blanket for DEMO reactor US/JP Workshop on Fusion Power Plants and Related Advanced Technologies 23 th -24 th Feb at UCSD,
HAPL Concrete Shielding Requirements Mohamed Sawan UW Fusion Technology Inst. HAPL Project Meeting UW-Madison October 22-23, 2008.
1 Neutronics Assessment of Self-Cooled Li Blanket Concept Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI With contributions.
August 9, 2006 Design, Fabrication and Maintenance Considerations of Blanket Options for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M.
1 Neutronics Parameters for the Reference HAPL Chamber Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI With contributions.
1 Some Considerations in Preparation for Starting Study On the Design of a Dry Wall Blanket for HAPL I. N. Sviatoslavsky, M. E. Sawan Fusion Technology.
1 Nuclear Assessment of HAPL Chamber with Magnetic Intervension Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI With contributions.
Materials Integration by Fission Reactor Irradiation and Essential Basic Studies for Overall Evaluation Presented by N.Yoshida and K.Abe At the J-US Meeting,
Required Dimensions of HAPL Core System with Magnetic Intervention Mohamed Sawan Carol Aplin UW Fusion Technology Inst. Rene Raffray UCSD HAPL Project.
HAPL June 20-21, Overview of Chamber/Blanket Work Presented by A.R. Raffray UCSD With contributions from CTC Group and MWG Blanket contributions:
1 Radiation Environment at Final Optics of HAPL Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI HAPL Meeting ORNL March.
Summary of Nuclear Input for Safety Analysis for the DCLL TBM -update-
Action Items from ARIES IFE Meeting, GA, July 1-2, 2002 (DRAFT)
Description of Thin Liquid Wall Protection w/Porous Walls
Neutronics Issues for Final Optics of HAPL Mohamed Sawan, Ahmad Ibrahim, Tim Bohm, Paul Wilson Fusion Technology Institute University of Wisconsin,
DCLL TBM Reference Design
Can We achieve the TBR Needed in FNF?
Trade-Off Studies and Engineering Input to System Code
Comments on ARIES-ACT 10/20/2010 Pre-Strawman
University of California, San Diego
Aerosol Production in Lead-protected and Flibe-protected Chambers
Action Items from ARIES IFE Meeting, UW, April 22-23, 2002 (DRAFT)
University of California, San Diego
Presentation transcript:

Radiological Issues for Thin Liquid Wall Options L. El-Guebaly, P. Wilson, and D. Henderson Fusion Technology Institute University of Wisconsin - Madison With input from M. Sawan, R. Peterson, I. Sviatoslavsky, E. Mogahed (UW), R. Raffray (UCSD), L. Waganer (Boeing), W. Meier, R. Moir (LLNL), S. Abdel-Khalik, M. Yuda (GT), and D. Petti (INEEL) ARIES Meeting April , 2002 UW

2 Develop activation approach for liquid wall supply methods: –Tangential injection –Porous wall injection Identify activation issues for candidate liquid wall (LW) materials: Liquid Metals * Molten Salts LiPbFlibe # Pb Sn Consider two extreme activation cases: –No mixing of LW material with breeder (worst case) –Mixing of LW material with breeder inside and outside chamber (proposed for ARIES-IFE-HIB) Develop design solutions for activation problems ___________ * No major activation problems expected for Li # (LiF) 2, BeF 2. Flinabe (NaF, LiF, BeF 2 ) exhibits similar behavior Objectives

3 Activation Assessment Includes: –Activity for safety analysis –Decay heat for LOCA/LOFA analysis –Waste management: Means for waste minimization: –Use same liquid breeder for LW –Clean-up LW and reuse in other devices –Clear from radiologically controlled area if Clearance Index < 1 (unlikely) Waste disposal in repositories: –Generate only low level waste (LLW) to meet ARIES requirements –Any high level waste (HLW)?

4 Blanket:Candidate LW Materials Liquid breeders:PreferredBackup LiPb * LiPb * Pb Flibe  Flinabe Li # Li # Ga LiSnLiSn Sn Recommendation: Use same breeder for LW to minimize waste Solid breeders: Li 2 O **, Li 2 ZrO 3, Li 4 SiO 4, Pb ** Sn, Ga Li 2 TiO 3, LiAlO 2 ______________________________ * HIBALL (UW-1981), HIBALL-II (UW-1984), LIBRA (UW-1990), LIBRA-SP (UW-1995)  OSIRIUS (LLNL-1992) # LIBRA-LiTE (UW-1991) ** Prometheus (MDC-1992) LW and Breeder Options

5 In-chamber residence time for LW is unknown  parameterize it Ex-chamber residence time ≈ 50 s, per Waganer LW Cycle Hohlraum Debris, T, Buffer Gas, and Transmutation Products Chamber Heat recovery, T extraction, and Clean up processes LW Injection LW Vapor/Drops, Hohlraum Debris, Buffer Gas, and Others t in ? T out ~50 s Breeder

6 Tangential Injection Option Heat recovery, T extraction, and Clean up processes LW Material LW Vapor/Drops, Hohlraum Debris, Buffer Gas Hohlraum Debris, T, Buffer Gas, and Transmutation Products LW Solid Wall Blanket No outside mixing of LW with breeder

7 Porous Wall Injection - Option I (Liquid Breeder Blanket - Proposed for ARIES-IFE) Heat recovery, T extraction, and Clean up processes Breeder LW Vapor/Drops, Hohlraum Debris, Buffer Gas Hohlraum Debris, T, Buffer Gas, and Transmutation Products LW Porous Wall Blanket Supply Channel Route breeder exiting supply channel through blanket to increase ∆T and enhance thermal conversion efficiency Use same breeder for LW to minimize waste

8 Porous Wall Injection - Option II (Solid Breeder Blanket - Prometheus type ) Heat recovery, T extraction, and Clean up processes LW Material LW Vapor/Drops, Hohlraum Debris, Buffer Gas Hohlraum Debris, T, Buffer Gas, and Transmutation Products LW Porous Wall Blanket Supply Channel No mixing with solid breeder outside chamber (Prometheus type) 1 mm

9 Representative Radial Build for LiPb Breeder Using ARIES-AT Design Rules SiC/SiC composite structure and LiPb LW/coolant/breeder Design parameters (per Raffray): SiC T max 1000 o C Surface heat flux≤ 1 MW/m 2  Chamber radius≥ 6 m LiPb ∆T o C LiPb velocity4-6 m/s LiPb T max 1100 o C LW Thickness1 mm LW Porous Wall (90% SiC, 10% LiPb) Blanket (20% SiC, 80% LiPb) (TBR~1.1) Supply Channel (10% SiC, 90% LiPb) SiC Wall 0.5 Thickness (cm) In-chamber residence time ? ? 5 s 140 s

10 Perkins’ neutron spectrum for HIB target (av. E n =11.75 MeV) Parameters: Target yield458.7 MJ Rep rate 4 Hz (0.25 s between pulses) Chamber radius6 m Neutron wall loading2.8 MW/m 2 Plant lifetime40 FPY Availability 85% In-chamber residence time for LW depends on evaporation and condensation processes. LW may survive thousands of pulses before being processed and re-injected into chamber  Parameterize in-chamber residence time between 0.25 s (1 pulse) and several tens of minutes (~10,000 pulses) Impurities included in all materials LW materials only. No target debris Same radial build used for all LW candidates No mixing during operation. Mixing with EOL * Waste disposal rating (WDR) evaluated at 100 y after operation using Fetter’s limits for LiPb, Pb, and Sn and NRC-10CFR61 limits for Flibe and Flinabe Exact model of all pulses using ALARA pulsed activation code ______________ * Conservative assumption Activation Parameters and Assumptions

11 WDR - Tangential Injection (No Outside Mixing with Breeder) WDR increases with LW residence time and saturates at ~ 40 min LW materials generate tons of HLW unless residence time and/or exposure time are controlled Sn and Flibe have lower WDR compared to Pb and LiPb To reuse materials in other devices or dispose as LLW waste: –Limit LW service life  higher inventory. Use fresh LiPb and Pb after 2-3 y and fresh Sn and Flibe after y if in-chamber residence time ≥ 40 min (Bi impurity control below 43 wppm helps prolong LiPb/Pb service lifetime), –Or, control in-chamber residence time to ≤ 2-3 s for Pb/LiPb and s for Sn/Flibe –Or, filter out cup(s) of transmutation products and dispose as HLW

12 WDR ≤ 1 No Transmutation Removal Option IOption II Max Exposure Residence Max Residence Time Time Exposure WDR* Time Time LiPb69 3 s 47 y ≥ 40 min 2.5 y Pb s 47 y ≥ 40 min 2.2 y Sn6 20 s 47 y ≥ 40 min 14.4 y Flibe9 25 s 47 y ≥ 40 min 15.6 y On-line removal of transmutation products relaxes limits on residence/exposure times, thus reduces EOL inventory, but generates cup(s) of HLW _________________ * ≥ 40 min in-chamber residence time and 47 y of operation WDR - Tangential Injection - Cont. (No Outside Mixing with Breeder)

13 Example: Liquid breeder used in all components. Proposed for ARIES-IFE Blanket controls volumetric average WDR WDR is not sensitive to in-chamber residence time of LW Results for 47 y of operation: WDR * LiPb10 Flibe0.8 No waste disposal problem identified for Flibe even without clean-up system To reuse LiPb in other devices or dispose as LLW, filter out cup(s) of transmutation products and dispose as HLW Do not limit exposure time for sizable breeders (> 1000 tons) ______________ * No transmutation removal. WDR - Porous Wall Injection (Outside Mixing with same Breeder)

14 Example: Solid breeder blanket with Pb (or Sn) seeping from supply channel through porous wall 1 mm thick LW controls volumetric average WDR #  Need more accurate evaluation for in-chamber residence time Results for ≥ 40 min residence time and 47 y of operation: WDR * Pb14 Sn0.94 No waste disposal problem identified for Sn even without clean-up system Without LW contribution, WDR of Pb in supply channel is ~2  HLW To reuse Pb in other devices or dispose as LLW, filter out cup(s) of Bi and dispose as HLW ______________ * No transmutation removal # 86% from LW and 14% from supply channel WDR - Porous Wall Injection (No Outside Mixing with Breeder - Prometheus-type)

15 Main Contributors to WDR LiPb, Pb 208 Bi Sn 108m Ag, 121m Sn, 126 Sn Flibe 14 C

16 Conclusions Employ same breeder for LW to minimize waste volume Tangential injection case without clean-up system: –All LW materials generates HLW if in-chamber residence time exceeds 2-25 s, depending on materials Porous wall injection case without clean-up system : –No waste disposal problems identified for Sn and Flibe –LiPb and Pb generate HLW if employed for 47 y On-line clean-up system removes cup(s) of transmutation products (HLW) and allows tons of LW materials to be reused in other devices or disposed as LLW Some results are sensitive to in-chamber residence time that is unknown and needs to be determined