CSC,17.9.2008 1 Status of HIPPI – September 2008 M. Vretenar, A. Lombardi.

Slides:



Advertisements
Similar presentations
Lorentz force detuning measurements on the CEA cavity
Advertisements

Juliette PLOUIN – CEA/SaclayCARE’08, 3 December /21 Superconducting Cavity activities within HIPPI CARE ‘08 CERN, 2-5 December 2008 Juliette PLOUIN.
1C. CavataBENE 17/03/05 Proton driver Saclay A talk assembled with materials from R. Gobin P.Y. Beauvais B. Visentin R. Duperrier Outlines.
ESS SPOKE LINAC (WP4) Sebastien BOUSSON Guillaume OLRY ESS/SPL Meeting - Lund – 2010/07/01.
D.S. proposal 18/12/2003 R. Garoby 1 PROTON DRIVER ACTIVITY Present work program: IPHI-SPL collaboration HIPPI Joint Research Activity [CARE] Proton driver.
CSC, Status of HIPPI – September 2006 Maurizio Vretenar Alessandra Lombardi.
CSC, , A. Lombardi. 1 Status of HIPPI – April 2007 Maurizio Vretenar Alessandra Lombardi.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
MEBT & RT CH Section Thomas Page Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
1. 2 HIPPI at end Official end of the Activity in December 2008  no extensions will be considered. The remaining deliverables are due at the latest.
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
Field and Phase Error Studies in Normal Conducting Structures LLRF and Beam Dynamics in Hadron Linacs – EuCARD2 Workshop Ciprian Plostinar
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
PHIN JRA Status PHIN collaboration CARE SC meetingParis February 2004.
HIPPI 05, Abingdon, Introduction to HIPPI05 -Few words on the life of HIPPI -A new HIPPI Management… -HIPPI 05 organization -Mandate for the.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
1 1. Some recent views ( ) 2 Linac tunnel
HINS Front-End R&D --- Status and Plans Bob Webber Fermilab Accelerator Advisory Committee August 7, 2007 Update of May 10 th – 12 th, 2006 AAC Presentation.
Development of the Room Temperature CH-DTL in the frame of the HIPPI-CARE Project Gianluigi Clemente,
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
CARE 05, CERN, HIPPI Activities -HIPPI Structure Highlights -ESAC Report -Planning and deliverables Maurizio Vretenar, CERN.
CARE 06, Frascati, HIPPI in HIPPI Objectives Activities -ESAC Report -Planning and deliverables Maurizio Vretenar, CERN.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
1 PS Days - Evian / MV The SPL : a High-Power Superconducting H – Linac at CERN  Motivations  Applications  Design features  Improvements.
CARE SC meeting August 2005 T. Garvey JRA1 – SRF (WP 7 – 11)
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
CHARGES TO THE ESAC The External Scientific Advisory Committee for the HIPPI JRA inside CARE has been nominated to analyse the work done and planned in.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting.
CARE SC meeting, CERN, 13th September, Report on SRF Work-packages WP7Power Couplers WP8Tuners WP9 Low level RF WP10Horizontal Cryostat Integration.
A Few Pointers from the Linac4 Beam Commissioning of Warm Linac Yngve Levinsen Beam Physics Section 05/02/16.
WP4-CHOPPER coordinated by A. Lombardi HIPPI yearly meeting, sep28-sep COSENERS HOUSE- Abington Hosted by CCLRC.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Linac4 status and long-term schedule M. Vretenar, Project Meeting  status  timeline  open issues  status  timeline  open issues.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
O. Kester, NuSTAR annual meeting, 27/02/2013
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
EURISOL CB MEETING – PSI – 15 JUNE 2006 Sébastien Bousson IPN Orsay – Accelerator Division TASK 8 STATUS REPORT INFN – Legnaro IPN Orsay.
Linac4 & SPL Status of preparation and Opportunities M. Vretenar (R
The CERN Linac4 history, performance, perspectives
WP5 Elliptical cavities
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Complementary ISTC Projects #3888, 3889p
LINAC AG • IAP • Goethe Universität Frankfurt
WG-1 Session Cavity Performance Cryomodule Performance
HIE-LINAC status report
Collective Effects and Beam Measurements in Particle Accelerators
DESIGN OF THE HWR CAVITIES FOR SARAF
Prototype cryomodule development
A High Intensity Neutrino Oscillation Facility in Europe
The SPL-based Proton Driver at CERN
Presentation transcript:

CSC, Status of HIPPI – September 2008 M. Vretenar, A. Lombardi

CSC, Contents  News since April 2008  WP highlights  Meetings, deliverables  Organisation of HIPPI08

CSC, WP annual meetings  WP2 : June 11 th in Grenoble  WP3 : no formal meeting this year  WP4 : June 20 th at CERN  WP5 : May 19 th at GSI 3

CSC, WP2- normal conducting cavities  WP2 hardware : DTL power coupler - finished H-DTL - see next slide SCL (cold model) – finished CCDTL (2 prototypes) – finished  4 prototypes of accelerating structures are completed and tests are underway and mostly completed.  Total of 8 deliverables

CSC, WP2- normal conducting cavities the strategy of the two models was changed (CARE Steering Committee in April): We have delivered (report1) as a first step a power CH cavity :It was tested with 2kW cw end of So we could call it CH prototype1 instead of "cold model". Our CH prototype2 is now the 1:2 scaled model of the FAIR p-linac cavity2. It is the coupled cavity with two CH sections coupled by a DTL-type lens. This will be the content of our second delivery as announced in delivery report1 already.  The coupled, 1:2 scaled rf model for cavity2 with an energy range from 11.7 to 24.3 MeV (prototype 2) is under investigation.  A contract for the design and production of this cavity in full scale for RF power measurements was made and has started already.  Mechanical and welding tests for cavity production have started.  HIPPI has triggered this development and has helped to develop the know how to apply this novel type of cavity in time for the GSI-FAIR needs. 5 CH developments in Frankfurt- U. Ratzinger

CSC, WP2 – deliverables status  All due deliverables have been delivered (5 over 8)  3 deliverables to go : DTL (ok-no delay); H- mode DTL (ok-no delay); and comparative assessment (editor C. Plostinar/RAL, presently collecting data). »No particular worries 6

CSC, WP3- superconducting cavities  WP3 hardware : Cavity A and B (elliptical cavities-700MHz) Spoke cavities 700 MHz 352 MHz 2-gap and multi-gap CH resonator 700 MHz RF test stand  4 cavities have been finished, test stand is ready  Total of 7 deliverables

CSC, WP3 – 700 MHZ test stand At Saclay : At Saclay :  cavity B has been tested at cold with its Helium tank, and the results are quite good (regarding the beta of this cavity) ; results published at EPAC'08  now making the assembly of the magnetic shielding on the cavity and preparing a cold test in Cryholab. The last pieces of the couplers are close to be delivered to Saclay (within 2 weeks) and we should then make the coupler assembly in clean room and start the RF power conditioning of these 2 first couplers. At INFN :  assembly of the magnetic shielding and the cavity A is in progress.  Horizontal cold test foreseen in November At Juelich and Orsay :  the cavity (3-spokes) is now ready (chemical treatment performed at Saclay, HPR and clean room assembly at Orsay).  the cold tests should be performed in September. At Frankfurt:  the s.c. CH - prototype cavity is close to being implemented in the horizontal cryostat. Operation at fixed frequency is intended in the next test. S. Chel

CSC, WP3 – deliverables status  3 deliverables over 7 are delivered  4 deliverables to go : Elliptical cavities high power test will not be completed in 2008, needs re-scoping: 'High power tests of couplers for cavity A and B’ Spoke cavity-proto testing : low power tests for sure possibly high power test. The final report (cavity assessment) will be discussed in the next HIPPI meeting. Final report on SC-CH (Frankfurt) >>approximately ok 9

CSC, WP4 - chopping  WP4 hardware Chopper structures (A,B) Chopper drivers (A,B) Dump – completed  Hardware is mostly on time, problem with the test stand. According to the plan the measurements should have started march07 at CERN. There will be no measurements with beam and the comparison will be made on the basis of electrical measurements and other tests that have already been done  Total of 6 deliverables

CSC, WP4 - deliverable status  4 deliverable over 6 are delivered  2 deliverables to go Beamline assembly (and measurements) : we will have a description of the beamline assembly but no measurements Comparative assesment will be coordinated by AL. Material already availiable »This WP has been plagued by external problems (RAL manpower and IPHI-RFQ delays) 11

CSC, WP5 - beam dynamics  WP5 Diagnostics Profile by fluorescence Non interceptive bunch measurement Halo device Beam profile at FZJ Measurements at the UNILAC Code comparison  Total of 10 deliverables

CSC, WP5-deliverable status  7 deliverables over 10 are delivered  3 deliverables to go : Code beanchmarking at GSI : at GSI the code benchmarking went through a very interesting refinement process since May. It was triggered by referee comments, after submission to PRSTAB, which stimulated us to go beyond the rms comparison. Lars Groening invested quite a bit of time since May to get an initial distribution that fits closely to the measured input in terms of profile, and thus btained better rms agreement for all codes involved. A lifely and very stimulating discussion of Lars' paper occurred at the recent HB2008 in its linac working group. Simulations (and experiments )at CERN Comparative assessment of dynamics and measurements »This WP performed really well 13

CSC, Milestones and deliverables DELIVERABLES : 2005 : 1/1 delivered : 8/8, delivered 2007 : 8/9 delivered, one left is “cern beamline assembly” 2008 : 2/13 delivered. Missing a grand total of 12 deliverables, of which 4 are the comparative assessment reports to be discussed and prepared at HIPPI08

CSC, Dissemination  Dissemination 5 reports since april 08 3 Notes since april 08 conference paper : should check epac08 Total number of HIPPI publications : 28 Notes, 17 reports, 60 conf paper, 3 journal publications and 16 documents.

CSC, HIPPI08 Meeting at CERN   Wednesday 29, October to Friday 31, October 2008 at CERN (AB Auditorium Meyrin).   Web site: meeting.web.cern.ch/ab-project-HIPPI-Meeting/, Indico site , announced on CERN Welcome page. meeting.web.cern.ch/ab-project-HIPPI-Meeting/   All 3 members of the ESAC: J. Stovall (LANL-SNS), Y. Yamazaki (KEK-JPARC), A. Pisent (LNL) will be present.

CSC, HIPPI08 – Programme -Shorter WP sessions for reporting progress -Time for preparing the comparative assessments -Presentations on the status of the 3 projects supported by HIPPI -Time for discussing the status of the last missing deliverables