PPT 3 -1 Don R. Hansen Maryanne M. Mowen COST MANAGEMENT.

Slides:



Advertisements
Similar presentations
PERILAKU BIAYA : Analisis dan Penggunaan
Advertisements

Cost Behavior: Analysis and Use
Cost Behavior: Analysis and Use Mar 3, 2004 Chapter 5.
Cost Behavior, Activity Analysis, and Cost Estimation
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Copyright © 2014 Pearson Education,
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 6 Activity Analysis, Cost Behavior, and Cost Estimation.
Cost Estimation Chapter 5 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton ©2008 Prentice Hall Business Publishing,
Cost Behavior: Analysis and Use
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Determining How Costs Behave Chapter 10 2/07/05.
Measurement of Cost Behaviour
Chapter 5 Cost Behavior: Analysis and Use. Variable Costs Total Variable Cost Graph Total Costs $300,000 $250,000 $200,000 $150,000 $100,000 $50,
Cost Behavior Analysis Chapter 3. I Made R. Natawidnyana, Ak., CPMA Cost Accounting – Third Sesion Recall the summary of our cost behavior discussion.
Cost Behavior Management Accounting: The Cornerstone for Business Decisions Copyright ©2006 by South-Western, a division of Thomson Learning. All rights.
Chapter 3 Cost Behaviour
Cost Concepts - 1 COST CONCEPTS AND CLASSIFICATIONS Fixed vs Direct vs Variable Indirect Functional vs Behavioral.
1 CHAPTER M4 Cost Behavior © 2007 Pearson Custom Publishing.
Cost concepts, Cost Classification and Estimation
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 13 Linear Regression and Correlation.
Chapter 11 Simple Regression
Linear Regression and Correlation
3 CHAPTER Cost Behavior 3-1.
Activity Cost Behavior
3-1 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Activity Cost Behaviour 3 PowerPresentation® prepared by David J. McConomy, Queen’s.
Chapter 5 Cost Behavior: Analysis and Use. © The McGraw-Hill Companies, Inc., 2005 McGraw-Hill /Irwin Types of Cost Behavior Patterns Recall the summary.
Chapter 7 Cost Drivers and Cost Behavior IDIS 364 – Spring 2007.
Predicting Cost Behavior Chapter 2, Appendix 2A ACCTG 404 A2A-1.
Principles of Managerial Accounting Chapter 5 Types of Cost Behavior Patterns Variable True Variable Step-variable Fixed Committed Discretionary Mixed.
Accounting 3020 Chapter 5 – Cost Behavior: Analysis and Use.
The Activity Base A measure of what causes the incurrence of a variable cost. Units produced Miles driven Machine hours Labor hours 5-1.
Learning Objective 1 Explain the two assumptions frequently used in cost-behavior estimation. Determining How Costs Behave – Chapter10.
Chapter 12: Linear Regression 1. Introduction Regression analysis and Analysis of variance are the two most widely used statistical procedures. Regression.
Copyright © 2003 Pearson Education Canada Inc. Slide Chapter 10 Determining How Costs Behave.
Controlling Manufacturing Costs: Standard Costs
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
Basic Concepts of Economics Use basic economic concepts to explain changes in natural resource base and environmental quality Prepared by Husam Al-Najar.
Cost Behavior Management Accounting: The Cornerstone for Business Decisions Copyright ©2006 by South-Western, a division of Thomson Learning. All rights.
3-1 Cost Analysis Prepared by Douglas Cloud Pepperdine University Prepared by Douglas Cloud Pepperdine University 3.
© 2007 Pearson Education Canada Slide 3-1 Measurement of Cost Behaviour 3.
The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin DSS-ESTIMATING COSTS.
2-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Measurement of Cost Behavior Chapter.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Slide Cost Estimation.
Basic Managerial Accounting Concepts Cost Behavior: Fixed Costs Fixed vs. Variable Relevant range: normal production levels Behavior of fixed costs as.
1 COST BEHAVIOR PATTERNS Chapter 2 Accounting Principles II AC Fall Semester, 1999.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Activity Cost Behavior
Chapter 10: Determining How Costs Behave 1 Horngren 13e.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
COST MANAGEMENT Accounting & Control Hansen▪Mowen▪Guan COPYRIGHT © 2009 South-Western Publishing, a division of Cengage Learning. Cengage Learning and.
Copyright © 2013 Nelson Education Ltd.
1 Measurement of Cost Behavior ©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Learning.
©The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin Linear Regression and Correlation Chapter 13.
Introduction to Management Accounting Chapter 3 Introduction to Management Accounting Measurement of Cost Behavior.
Prepared by Diane Tanner University of North Florida ACG Cost Estimation 4-1.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
Activity Analysis, Cost Behavior, and Cost Estimation Chapter 6 McGraw-Hill/Irwin Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction.
Determining How Costs Behave
Analyzing Mixed Costs Appendix 5A.
MANAGEMENT ACCOUNTING
Analyzing Mixed Costs Appendix 5A.
AMIS 310 Foundations of Accounting
Determining How Costs Behave
MANAGEMENT ACCOUNTING
© 2017 by McGraw-Hill Education
Cornerstones of Managerial Accounting, 5e
DSS-ESTIMATING COSTS Cost estimation is the process of estimating the relationship between costs and cost driver activities. We estimate costs for three.
Presentation transcript:

PPT 3 -1 Don R. Hansen Maryanne M. Mowen COST MANAGEMENT

PPT 3 -2 Activity Cost Behavior Chapter Three

PPT 3 -3 Learning Objectives l Define and describe fixed, variable, and mixed costs. l Explain the use of resources and activities and their relationship to cost behavior. l Separate mixed costs into their fixed and variable components using the high-low method, the scatterplot method, and the method of least squares.

PPT 3 -4 Learning Objectives (continued) l Evaluate the reliability of the cost formula. l Explain how multiple regression can be used to assess cost behavior l Discuss the use of managerial judgment in determining cost behavior.

PPT 3 -5 Fixed Cost BehaviorVariable Cost Behavior $ $ Relevant Range Activity Activity Cost Behavior

PPT 3 -6 Total Costs $Cost Number of Units Produced Fixed Costs Variable Costs Linearity Assumption Y = F + VX The Behavior of a Mixed Cost

PPT 3 -7 Basic Terms Activity capacity is the ability to perform activities. Practical capacity is the efficient level of activity performance. Resources are economic inputs that are consumed in performing activities.

PPT 3 -8 Types of Fixed Resources l Flexible Resources l Committed Resources l Discretionary Fixed Costs

PPT 3 -9 Flexible Resources Flexible resources are supplied as used and needed. They are acquired from outside sources, where the terms of acquisition do not require any long-term commitment for any given amount of the resource. Example: Materials and energy

PPT Committed Resources Committed resources are supplied in advance of usage. They are acquired by the use of either an explicit or implicit contract to obtain a given quantity of resource, regardless of whether the amount of the resource available is fully used or not. Committed resources may have unused capacity. Example: Buying or leasing a building or equipment

PPT Committed Resources (continued) Committed fixed expenses are costs incurred for the acquisition of long-term capacity. Example: Plant, equipment, warehouses, vehicles, and salaries of top employees Discretionary fixed expenses are shorter-term committed resources. Example: The hiring of new receiving clerks

PPT Resource Relationships The relationship between resources supplied and resources used is expressed by the following equation: Resources available = Resources used + Unused capacity

PPT Available orders = Orders used + Orders unused 7,500 orders = 6,000 orders + 1,500 orders Fixed engineering rate = $150,000/7,500 = $20 per change order Variable engineering rate = $90,000/6,000 = $15 per change order Example

PPT Cost of orders supplied= Cost of orders used + Cost of unused orders = [($20 + $15) x 6,000] + ($20 x 1,500) = $240,000 Of course, the $240,000 is precisely equal to the $150,000 spent on engineers and the $90,000 spent on supplies. The $30,000 of excess engineering capacity means that a new product could be introduced without increasing current spending on engineering. Example (continued)

PPT $Cost Number of Units Produced Linearity Assumption Narrow Width Step-Variable Costs

PPT $Cost Number of Units Produced Linearity Assumption Wider Width Step-Fixed Costs

PPT Methods for Measuring the Fixed and Variable Components of a Mixed Cost l The High-Low Method l Scatterplot Method l The Method of Least Squares

PPT Month Utility Costs Units Produced January $2, February 2, March 4, April 5, May 7,5001,000 High-Low Method: An Example

PPT Y= F + VX Variable Cost Rate (V)= (Y 2 - Y 1 )/(X 2 - X 1 ) V= ($7,500-$2,000)/(1, ) V= $5,500/800 V= $6.875 per unit The High-Low Method (continued)

PPT Y=F + VX $7,500= F + $6.875 (1,000) F=$7,500 - $6,875 F= $625 The cost formula using the high-low method is: Y = $625 + $6.875 (X) The High-Low Method (continued)

PPT Units Produced Utility Cost $8,000 6,000 4,000 2, , Analyst can fit line based on his or her experience Important: Cost function is only relevant within relevant range Scatterplot Method

PPT Nonlinear Relationship Activity Cost 0 Activity Output * * * * *

PPT Upward Shift in Cost Relationship Activity Cost 0 Activity Output * * * * * *

PPT Presence of Outliers Activity Cost 0 Activity Output * * * * * *

PPT Least Squares Constant250 Std Err of Y Est R squared No. of Observations5 Degrees of Freedom3 X Coefficient(s) 6.75 Std Err of Coef

PPT Least Squares (continued) The results gives rise to the following equation: Utility Costs = $250 + ($6.75 x # of units produced) R 2 =.944, or 94.4 percent of the variation in setup costs is explained by the number of setup hours variable.

PPT Using Confidence Intervals: Given: *T-value for sample size of 5 at 95% confidence level is (two-tale test and 3 degrees of freedom) *Standard error of estimate for this sample at the 95% confidence level is The confidence interval for 300 units is: TC = $ (300) + (3.192 x $598.6) = $ $1911 Least Squares (continued)

PPT TC = b 0 + b 1 X 1 + b 2 X b 0 = the fixed cost or intercept b i = the variable rate for the ith independent variable X i = the ith independent variable Multiple Regression

PPT Utility MonthMHrsSummerCost January1,3400$1,688 February1,29801,636 March1,37601,734 April1,40501,770 May1,50012,390 June1,43212,304 July1,32212,166 August1,41612,284 September1,37011,730 October1,58001,991 November1,46001,840 December1,45501,833 Multiple Regression (continued)

PPT Constant Std Err of Y Est R squared No. of Observations12 Degrees of Freedom9 X Coefficient(s) Std Err of Coef Multiple Regression (continued)

PPT Multiple Regression (continued) The results gives rise to the following equation: Utilities cost = $ $1.097(MH) + $510.49(Summer) R2 = 0.967, or 96.7 percent of the variation in utilities cost is explained by the machine hours and summer variables.

PPT l Use past experience l Try to confirm results with operating personal l Use common sense to confirm statistical studies Some Tips Cost Behavior and Managerial Judgment

PPT End of Chapter 3