FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size; ~6mm x 6mm Full.

Slides:



Advertisements
Similar presentations
LCFI Collaboration Status Report LCWS 2004 Paris Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, RAL.
Advertisements

CO2 cooling for FPCCD Vertex Detector Yasuhiro Sugimoto KEK 1.
1 FPCCD Vertex Detector for ILC Yasuhiro Sugimoto  Concept of FPCCD VTX  FPCCD prototype  VTX inner radius.
Simulation Studies of a (DEPFET) Vertex Detector for SuperBelle Ariane Frey, Max-Planck-Institut für Physik München Contents: Software framework Simulation.
FPCCD option of ILD vertex detector Yasuhiro Sugimoto KEK for FPCCD VTX
LCWS 31/5/2007Erik Johnson STFC,RAL1 ILC Vertex Detector Mechanical Studies Erik Johnson On behalf of the LCFI collaboration STFC, Rutherford Appleton.
1 Integration issues of FPCCD VTX Yasuhiro Sugimoto May 22,
Victoria04 R. Frey1 Silicon/Tungsten ECal Status and Progress Ray Frey University of Oregon Victoria ALCPG Workshop July 29, 2004 Overview Current R&D.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
A new idea of the vertex detector for ILC Y. Sugimoto Nov
R&D Status of FPCCD Vertex Detector Dec.1, 2006 Yasuhiro Sugimoto KEK.
1 Conceptual design adopts state-of-the-art silicon sensor techniques (compare ATLAS/CMS/ALICE inner tracker layers, BaBar tracking of B mesons). Design.
Study of FPCCD Vertex Detector 12 Jul. th ACFA WS Y. Sugimoto KEK.
Fine Pixel CCD Option for the ILC Vertex Detector
LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
ILC VXD Review, Fermilab, October 2007 Ariane Frey, MPI für Physik DEPFET Vertex Detector Simulation and Physics Performance Ariane Frey for the DEPFET.
R&D status of FPCCD VTX and its cooling system Yasuhiro Sugimoto for FPCCD VTX group 1.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
1 R&D Status and plan for FPCCD VTX Yasuhiro Sugimoto
FPCCD VTX Overview Yasuhiro Sugimoto KEK Tokubetsu-Suisin annual meeting 11.
Vertex Detector for GLD 3 Mar Y. Sugimoto KEK.
1 Engineering issues for FPCCD VTX Detector Y. Sugimoto KEK July 24, 2007.
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
Fine Pixel CCD for ILC Vertex Detector ‘08 7/31 Y. Takubo (Tohoku U.) for ILC-FPCCD vertex group ILC vertex detector Fine Pixel CCD (FPCCD) Test-sample.
2006 Work Plan Y. Sugimoto 25-Apr Study Items Basic study of fully depleted CCD Simulation studies for FPCCD VTX Radiation damage Thin wafer and.
FPCCD VTX Overview Yasuhiro Sugimoto KEK Tokubetsu-Suisin annual meeting 11.
FPCCD option Yasuhiro Sugimoto 2012/5/24 ILD 1.
FPCCD Vertex detector 22 Dec Y. Sugimoto KEK.
Tracking and Vertexing with a Thin CMOS Pixel BeamTelescope and Thin Ladder Studies M Battaglia JM Bussat, D Contarato, P Giubilato, LE Glesener, LC Greiner,
LC Tracking Review at Amsterdam Overview of Asian Tracking R&D Vertex Detector Silicon µ-Strip Intermediate Tracker Central Tracker - Jet Chamber.
you me  when it all started to work  progress made  outlook.
FPCCD VTX Overview Yasuhiro Sugimoto KEK Tokubetsu-Suisin annual meeting 11.
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
M. Deveaux, CBM-Collaboration-Meeting, 25 – 28. Feb 2008, GSI-Darmstadt Considerations on the material budget of the CBM Micro Vertex Detector. Outline:
1 FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. 2 FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size chip; ~6mm.
R&D Status and plan for FPCCD VTX Yasuhiro Sugimoto
Gossip/GridPix – guidelines, facts, and questions for review Version 1: Norbert Version 2: Tatsuo Version 3: Werner.
R&D Plan in FY2003 Vertex Detector Subgroup Y. Sugimoto 11 Apr
LHCb Vertex Detector and Beetle Chip
Pixel detector development: sensor
1 Nick Sinev, ALCPG March 2011, Eugene, Oregon Investigation into Vertex Detector Resolution N. B. Sinev University of Oregon, Eugene.
Vertex detector update 1 Oct Y. Sugimoto KEK.
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
INSTR L.Shekhtman 1 Triple-GEM detectors for KEDR tagging system V.M.Aulchenko, A.V.Bobrov,A.E.Bondar, L.I.Shekhtman, E.V.Usov, V.N.Zhilich,
1 Performance of a CCD tracker at room temperature T. Tsukamoto (Saga Univ.) T. Kuniya, H. Watanabe (Saga Univ.); A. Miyamoto, Y. Sugimoto (KEK); S. Takahashi,
TRACKING AND VERTEXING SUMMARY Suyong Choi Korea University.
Oct/12/07 Su DongSiD Tracking Meeting1 Thoughts on VXD Sensor Configuration Su Dong.
Vertex detector R&D Work Plan in /3/11 Y. Sugimoto for KEK-Tohoku-TohokuGakuin-Niigata- ToyamaCMT Collaboration.
6/19/06 Su DongSiD Advisory: VXD DOD Summary II1 VXD DOD Summary (II) Sensors & Other system Issues.
CBM 12 th Meeting, October 14-18, 2008, Dubna Present status of the first version of NIHAM TRD-FEE analogic CHIP Vasile Catanescu and Mihai Petrovici NIHAM.
Sonja Hillert, University of Oxford2 nd ECFA LC workshop, Durham, 1 st September 2004 p. 0 Recent results from R&D towards a vertex detector at the international.
Highlights from the VTX session Marc Winter & Massimo Caccia R&D reports: – DEPFET (M. Trimpl) – CCD (S. Hillert) – UK-CMOS (J.Velthuis) – Continental-CMOS.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
Goals and requirements 1 st flexible geometry version Next geometry version development Conclusions and outlook A realistic and flexible VTX geometry in.
FP-CCD GLD VERTEX GROUP Presenting by Tadashi Nagamine Tohoku University ILC VTX Ringberg Castle, May 2006.
The SuperB Silicon Vertex Tracker Abstract : The SuperB project aims to build an asymmetric e+ - e- collider capable of reaching.
Towards Snowmass Jul. 13, 2005 Y.Sugimoto. Charge for Detector WGs Charge for Concept Groups: work towards a baseline design define performance criteria.
Hybrid Pixel R&D and Interconnect Technologies
R&D status of FPCCD VTX for ILD
Requirements and Specifications for Si Pixels Sensors
The SuperB Silicon Vertex Tracker
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
FPCCD Vertex Detector for ILC
Yasuhiro Sugimoto KEK 17 R&D status of FPCCD VTX Yasuhiro Sugimoto KEK 17
CCD based Vertex Detector for GLC
FPCCD Vertex Detector for ILC
Status of CCD Vertex Detector R&D for GLC
SVT detector electronics
Presentation transcript:

FPCCD VTX Work Plan Y. Sugimoto 2010/1/22

FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size; ~6mm x 6mm Full size; ~10mm x 62.5mm –Low-noise (<50 e) readout electronics Front-end ASIC Clock driver Digital signal processor –Tests of Spatial resolution 2-hit separation –Software development for FPCCD FPCCD digitizer B.G. rejection by cluster shape Flavor tagging capability

FPCCD: Features and R&D issues (2/2) Thin active layer thickness (~15  m) –Wafer thinning (~ 50  m ?) –Low mass ladder using RVC (Carbon foam) Low temp. (~  40 o C) operation for radiation immunity –R&D for cooling system Cold nitrogen gas, or Two-phase CO2 –Radiation hardness study of sensors Readout during train intervals –No need for “power pulsing”

Timeline By 2011 summer: Parameters which give impact on physics should be frozen –Wafer thinning –Ladder design –Cryostat/Cooling system design –Design of CCD and readout electronics: Power consumption –Demonstration of tracking capability and radiation immunity –Software development ( Background rejection, Flavor tag) By 2012 summer: Detailed design to be described in the report –Baseline option will be fixed –Full size prototype ladder –Detailed engineering design

Timeline