Emergency Interruptible Load Service Paul Wattles ROS Subgroup Feb. 7, 2006.

Slides:



Advertisements
Similar presentations
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Advertisements

ERCOT Under Frequency Load Shed Testing
February 25, 2011 Demand Side Working Group EILS Update Mark Patterson ERCOT, Manager Demand Integration.
Recent ERCOT Events Lessons Learned
ERCOT Emergency Load Response Sam Jones Paul Wattles Steve Krein PUC Demand Response Workshop Sept. 15, 2006.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Intermittent Resources and Demand Response Integration 2007–2016 Long-Term Reliability Assessment Workshop Bill Bojorquez VP, System Planning August 16,
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 7, 2006.
32853 Evaluation of Demand-Response Programs in the Competitive Electric Market Workshop 1 September 15, 2006 Shawnee Claiborn-Pinto.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
Long Term Solution Task Force TAC Report 5/5/07 Presented by: Bob Wittmeyer - LTSTF Co-Chair.
ERCOT Emergency Interruptible Load Program Kent Saathoff Ken Donohoo Paul Wattles Mark Patterson Steve Krein PUC Demand Response Workshop Oct. 2, 2006.
ERCOT Emergency Interruptible Load Program Paul Wattles Steve Krein WMS Oct. 13, 2006.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
Technical Advisory Committee Presentation to the ERCOT Board of Directors October 17, 2006.
Evaluation of Historical and Proposed Alert and EECP Pricing True North Associates 1.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
EECP External Communications ERCOT Governmental Relations & Communications COPS June 27, 2006.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
ERCOT Emergency Interruptible Load Service Customer & Stakeholder Workshops July 2007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 9, 2009.
Role of Account Management at ERCOT TAC Report to the ERCOT Board of Directors 2006 Accomplishments and 2007 TAC & Subcommittee Goals February 20, 2007.
Unit-Specific Bid Limits based on Modified Generic Cost.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
Operations Report Kent Saathoff System Operations ERCOT.
Emergency Interruptible Load Task Force Report to TAC November 3, 2006.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
Technical Advisory Committee Presentation to the ERCOT Board of Directors March 21, 2007.
Emergency and Other Event Communications ERCOT Board of Directors Richard Gruber, Director of Market Services Paul Wattles, Manager, Governmental Relations.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
PRR 705 ERCOT Emergency Interruptible Load Service PRS January 22, 2007.
WMS Update Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
EILS Discussion February WMS. Charge to WMS from PRS The benefit. The cost based on the EILS PRRs. Changes in Market since April 17, 2006.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee September 4, 2003.
Operations Update ERCOT Board Meeting March 18, 2003.
1 TAC Report to the ERCOT Board November 14, 2006.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
PRR 525 Update Prepared by ERCOT Compliance December 2005.
DSWG Update to WMS 8/10/2011. DSWG Goals #DSWG GoalDeliverable Target Date Primary Owner Team MembersStatus 1SCED Load Participation Complete analysis.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
QSE Managers Working Group Report to WMS September 19, 2007.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
H.B. “Trip” Doggett President and Chief Executive Officer Review of February 2, 2011 Energy Emergency Alert (EEA) Event Emergency Event Coordination Workshop.
11/3/2011 Technical Advisory Committee TAC Update Kyle Patrick.
Presentation to the ERCOT Technical Advisory Committee July 1, 2010.
1 WMS Report To TAC October In Brief One Working Group Report One Working Group Report One Task Force Report One Task Force Report Three Staff.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Energy Emergency Alert (EEA) UPDATE F EBRUARY 8, 2011.
1 EEA Workshop 3 April 2, /3/2015For the purpose of discussion only.
Weather-Sensitive ERS Pilot Project Proposal March 7, 2013 TAC Meeting.
Draft NPRR Weather Sensitive ERS Loads December 2012.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Long-term Solution Task Force Ellis Rankin & Bob Wittmeyer Co-Chairs.
OOM During Alerts ERCOT TAC June 7, 2007 Dan Jones Potomac Economics.
Long Term Solution Task Force TAC Report 5/5/07 Presented by: Bob Wittmeyer - LTSTF Co-Chair.
TAC Report to the ERCOT Board
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Intermittent Resources and Demand Response Integration 2007–2016 Long-Term Reliability Assessment Workshop Bill Bojorquez VP, System Planning August.
Presentation transcript:

Emergency Interruptible Load Service Paul Wattles ROS Subgroup Feb. 7, 2006

2 2 ROS Subgroup PresentationFebruary 7, 2007 Abbreviated History May 2005TAC/WMS ask Demand Side WG to work on the issue of an emergency load program to address 1-in-10-year LOLE July 2005TAC rejects new ancillary service for alternative fuels; cites ‘demand-side services for emergency curtailments’ as alternative Oct. 2005DSWG presents emergency load proposal to WMS; WMS defers decision in light of PUC rulemaking July 2006Emergency Load Response dropped from proposed rule; deferred to Demand Response project (32853) Q4 2006ERCOT presents EILS proposal to PUC Demand Response workshop & ERCOT stakeholders; subgroups develop proposals; Commissioners propose parallel rulemaking Q1 2007WMS resolution expresses lack of confidence that EILS is necessary; PRS tables PRRs pending new information; PUC rulemaking initiated

3 3 ROS Subgroup PresentationFebruary 7, 2007 PUC Rulemaking Project #33457 Regular rulemaking with expedited timeline (not an emergency rule) Proposal for publication approved by Commission Feb. 2 Comment period now open –Comments due March 2 Projected effective date: April 11 Based on PRR 705 Rule will sunset Oct. 1, 2007, provided that: –Alternative PRR acceptable to PUC and ERCOT is approved –Solution continuously in place with no interruption of protection offered by EILS EILS may be extended if a solution is not implemented by Oct. 1

4 4 ROS Subgroup PresentationFebruary 7, 2007 ERCOT Emergency Operations A new tool for the ERCOT toolbox Event/ActionTrigger ADVISORY Physical responsive below 3000 MW ALERT: Start RMR units, suspend unit testing, deploy RPRS & NSRS Physical responsive below 2500 MW Emergency Electric Curtailment Plan Step 1: Dispatch all generation, DC Ties Physical responsive below 2300 MW Step 2: Deploy LaaRs, issue public media appeal Physical responsive below 1750 MW Step 3: Instruct transmission owners to shed firm load Frequency below 59.8 hz New Step: Deploy EILS Resources

5 5 ROS Subgroup PresentationFebruary 7, 2007 EILS: Operational Issues 500 MW floor –Will not operate program if <500 MW subscribed 1,000 MW ceiling Loads deployed thru VDI hotline call to QSEs Loads deployed as single block after all market-based resources have been deployed QSEs responsible for: –Knowing EILS Resources committed at all times –Issuing dispatch instructions to the loads Loads have 10 minutes to shed full commitment of MW Loads must stay at committed level throughout deployment Loads recalled after LaaRs & have 10 hours to return to service ERCOT operators may go directly to Step 4 of EECP if frequency is decaying EILS deployment will allow faster recovery of the system

6 6 ROS Subgroup PresentationFebruary 7, 2007 Questions?