Congestion Revenue Rights 1 TCR to CRR Transition Plan NOIE Workshop Nodal CRR registration process for NOIEs (REVISED) Beth Garza.

Slides:



Advertisements
Similar presentations
Lead from the front Texas Nodal 1 Texas Nodal Registration Meeting #3 Matt Mereness July 30 th, 2007.
Advertisements

March 13, 2013 ERCOT Public CRR Transaction Limits NPRR463 Implementation Update Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
1 Shams Siddiqi, Ph.D. Representing LCRA and Rates and Resources Council (RRC) consisting of 31 NOIEs serving Central Texas TAC.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
Arizona Electric Power Cooperative, Inc.
Enter your personal details select the Prepaid customer radio button and click on the submit button.
Texas Nodal 1 Texas Nodal Settlements Mini-Market - CRR July 31, 2007.
October 22, 2007 TPTF Meeting Early Delivery Systems Status Update and Forecast Daryl Cote/John Webb/John Hall.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
2009 Bidders Workshop Attachment D August 3, 2009.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
Role of Account Management at ERCOT Market Engagement and Readiness (MER) Training Update TPTF Meeting June 26 th, 2007 Market Education.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
March 20 & 22, 2013 ERCOT Public ERCOT NPRR463 Market Call NPRR463/CRR Rolling Auction Implementation Update ERCOT CRR Team Manager: Matt Mereness.
Lead from the front Texas Nodal 1 EDS 4 Release 9.1 DAM/RUC/SASM Market Call January 11, 2008.
Texas Nodal Section 9: Invoicing ERCOT, Settlements & Billing SDAWG - August 2007.
Congestion Revenue Rights Market Trials Call 19 February, 2010.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
Lead from the front Texas Nodal 1 Texas Nodal CRR Requirements Overview of Requirements for TPTF Shawna Jirasek and Beth Garza September.
Lead from the front Texas Nodal 1 Registration and RARF Update to TPTF August 27, 2007.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Lead from the front Texas Nodal 1 Texas Nodal Congestion Revenue Rights (CRR) EDS 3 Release 7 - Overview EDS 3 Phase 2 MP Planning.
March 6, 2012 ERCOT Public ERCOT CRR Update Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
CRR Shortfall – Revenue Equalization Part 3 (Continuation from 3/5/08 TPTF discussion) Bill Barnes/Sharon Wang TPTF 3/21/2008.
April 2, 2008 CRR Team Update PCRRs CRR Team UpdateApril 2, 2008 Table of contents 1.What is a PCRR? 2.Which NOIEs are eligible for PCRRs? 3.What.
MCWG Update to WMS 08/14/2013. MCWG Update to WMS General Update -July 31 st Joint MCWG/CWG Meeting Review NPRRs All operational except – NPRR 552 – Additional.
1 Market Trials QSE Qualifications Weekly Update January 22, 2010.
1 Market Trials Congestion Revenue Rights Weekly Update May 6, 2010.
1 Market Trials Congestion Revenue Rights Weekly Update April 30, 2010.
CRR Issues Transparency provided by CRR Reports CRR EDS handbook Business process NPRR TPTF November 27, 2007.
Lead from the front Texas Nodal 1 Texas Nodal Registration Kick-off Meeting Matt Mereness June 6 th, 2007.
Lead from the front Texas Nodal 1 Texas Nodal Day-Ahead CRR Settlements Business Requirements TPTF Presentation ERCOT Settlements.
1 WMS Report To TAC May In Brief One Working Group Reports One Working Group Reports Two Task Force Reports Two Task Force Reports One Staff report.
Unit-Specific Bid Limits based on Modified Generic Cost.
1 Market Trials Congestion Revenue Rights Weekly Update September 3, 2010.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
TCR to CRR Transition Plan Proposed method for TCR Auction Revenue refunds Contingency plans For TAC Nov 1st, 2007.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Invoices Business Requirements Settlements and.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
Long-Term Congestion Rights (LTCR) Weekly Testing Call January 5, Project Pinnacle.
DAM Performance Issues with CRR Offers Steve Reedy Market Design Manager NATF 31 August 2010.
ERCOT Clarification for PCRR Allocation Terms and Conditions Should this sentence be included under Refund option [Section 7.4.2(c)(i)] Before the applicable.
NPRR533, Clarification of PCRR Eligibility Requirements, Workshop Brad Jones Vice President, Commercial Operations Chad V. Seely Assistant General Counsel.
Market Readiness Seminar Update Nodal Cutover Update July 28, 2010 Market Readiness Seminar #5.
Lead from the front Texas Nodal 1 Registration Update to TPTF Patrick Coon / Matt Mereness August 13 th, 2007.
14 Minute Ramp Period Testing Workshop June 30, 2009.
Resource Registration Update Dana Showalter Patrick Coon March 4, 2008.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1 Market Trials Real-Time Market / LFC Weekly Update April 2, 2010.
1 Market Trials DAM/RUC/SASM Weekly Update March 19, 2010.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF – December 4 th, 2006 ERCOT Qualification.
Lead from the front Texas Nodal 1 Nodal Transitional Qualification Approach to Qualifications for the Nodal Market August 16, 2007.
Retail Workshop ERCOT Nodal Update October 06, 2010.
DAM Performance Issues with CRR Offers Steve Reedy Market Design Manager TAC 2 September 2010.
Network Operations Model Go-Live Decision Kenneth Ragsdale TAC July 1, 2010.
1 Market Trials Real-Time Market / LFC Weekly Update March 26, 2010.
1Texas Nodal NATF Readiness Update Vikki Gates May 4, 2010.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program MIS Web Portal Business Requirements Review Current.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
Annual ARR Registration Workshop January 7, 2015.
Lead from the front Texas Nodal 1 Texas Nodal Registration meeting- RARF Question &Answer Matt Mereness August 9 th, 2007.
1 Market Trials Update NATF January 5, 2010.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
August 11, 2008 TPTF Early Delivery Systems Status Daryl Cote.
1 10/1/2016 Cut-Over Milestones 01 September 2010Market Readiness Seminar.
CRR Deration and NPRR821 WMS 09/06/2017.
Market Trials Congestion Revenue Rights
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Role of Account Management at ERCOT
Presentation transcript:

Congestion Revenue Rights 1 TCR to CRR Transition Plan NOIE Workshop Nodal CRR registration process for NOIEs (REVISED) Beth Garza September 18 th 2007

Congestion Revenue Rights 2 Agenda Timeline SFA and CRR AH Allocation Eligibility Form PCRR types Any other questions

Congestion Revenue Rights 3 Dates to remember… By Sep 28 th 2007:  Submit Standard Form Agreement* – By Dec 1 st 2007:  Indicate intention to participate in EDS 3 Release 7 – send to  Submit Allocation Eligibility Form – form available end of Sept  Declare NOIE Load Zone (if so desired) – form available end of Sept  Submit CRR Account Holder application* – By Jan 15 th 2007:  Complete required CRR Training – 1 concept course and 1 UI course Start of EDS testing (Phase 1) CRR Training deadline Allocation Eligibility Form, NOIE Load Zone declaration and intention to participate in EDS deadline 2/4/081/15/0812/1/07 End Sept Standard Form Agreement deadline 10/15/07 Market notice *Deadline is earlier for NOIEs than rest of MPs.

Congestion Revenue Rights 4 Details to remember in SFA and CRR AH forms… Remember to tick the box below in your Standard Form Agreement: Remember to tick the following box in your CRR Account Holder application:

Congestion Revenue Rights 5 Information submitted through the Allocation Eligibility Form… Type of information that will be requested in Allocation Eligibility Form: Name of NOIE If NOIE has long-term contractual commitment*: –Date contract was signed –Date contract expires –MW contractual amount –Type of generation resource in the contract –Copy of contract (or proof of contract) *Note: above-mentioned contracts are those entered into before Sep (including revisions/extensions to those contracts) If NOIE owns generation resource: –Net MW unit capacity owned –Name of generation resource –Proof of ownership

Congestion Revenue Rights 6 Available PCRR types will depend on Allocation Eligibility Form … NOIEs may nominate themselves (for test) for PCRRs during EDS, or nominate themselves (for real) for PCRRs when CRR goes live Types of PCRRs that NOIEs may nominate themselves for depend on the Resources that the NOIE owns, or the Resources that NOIE has a long-term contractual commitment with (information submitted to ERCOT through the Allocation Eligibility Form). Types of Point-to-Point (PTP) PCRRs that nominations are based upon: 1.Baseload: Nuclear, coal, lignite or combined-cycle Resources 2.Capacity*: Gas steam Resources and Hydro, wind, simple cycle, or other Resources 3.Refund: Gas steam Resources and Hydro, wind, simple cycle, or other Resources *NOIEs (or a group of NOIEs linked by common pre-1999 power supply arrangements) that had a 2003 NOIE peak Load in excess of 2,300 MW must use the capacity option Note: Baseload can be only a PTP Option or PTP Obligation or combination Capacity can be only a PTP Option (Capacity) or PTP Obligation (Capacity) or combination Refund can be only a PTP Option with Refund or PTP Obligation with Refund or combination

Congestion Revenue Rights 7 Any additional questions? Feel free to questions to