Quad Chart – Format Photograph or artist’s concept of the project end- item. Ideally, this will convey the main idea of the final capability/use of the.

Slides:



Advertisements
Similar presentations
Systems Analysis and Design in a Changing World
Advertisements

TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
4 1 4 C H A P T E R Software: Systems and Application Software.
BAA for Advancement of Technologies in Equipment for Use by Special Operations Forces (Solicitation Number: BAAST-12) U.S. Special Operations Command (USSOCOM)
1 Quiz Preparation l Have Quiz sheet ready. Title = QUIZ 12 »Name (L, F, MI), »Today’s date 11/6/12, »Lab day, time »section number.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Lecture 13 Revision IMS Systems Analysis and Design.
Fundamentals of Information Systems, Second Edition
©2003 Prentice Hall Business Publishing, Accounting Information Systems, 9/e, Romney/Steinbart 18-1 Accounting Information Systems 9 th Edition Marshall.
Computers: Tools for an Information Age
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
Project Plan Development
Copyright © 2003 by Prentice Hall Computers: Tools for an Information Age Chapter 14 Systems Analysis and Design: The Big Picture.
S/W Project Management
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
Project web site: old.libqual.org LibQUAL+™ from a Technological Perspective: A Scalable Web-Survey Protocol across Libraries Spring 2003 CNI Task Force.
Software Development *Life-Cycle Phases* Compiled by: Dharya Dharya Daisy Daisy
The Systems Proposal What the book calls the “Updated Baseline Project Plan” - no standard name for it Presents the different options to the customer along.
System Development Process Prof. Sujata Rao. 2Overview Systems development life cycle (SDLC) – Provides overall framework for managing system development.
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
ACCOUNTING INFORMATION SYSTEMS
IT133 Software Applications
Business Advisor Service Co. Web Office presented by Mr. Joseph Har, Senior Consultant
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution Structured programming Product SW.
Title of Project PI Name PI Organization Co-PI + Co-PI organization Team members Basic Research Technical Review.
Lockheed Martin Aeronautics Company Candidate Collaborative Projects for Net-Centric Application Michael F. Siok, PE Lockheed Martin Aeronautics Company.
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
COMP 208/214/215/216 – Lecture 8 Demonstrations and Portfolios.
Operational Capability to be Provided: Micro-sized sound and temperature monitoring devices can be distributed in and around high risk agricultural communities.
Systems Analysis and Design in a Changing World, Fourth Edition
Request for Proposal (RFP)
Fundamentals of Information Systems, Second Edition 1 Systems Development.
CISN: Draft Plans for Funding Sources: OES/FEMA/ANSS/Others CISN-PMG Sacramento 10/19/2004.
Systems Development Life Cycle
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
第 11 組 MIS 報告. Phases of any information system ~ recognition of a business problem or opportunity ~ recognition of a business problem or opportunity.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 11 Selecting.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
Tata McGraw CHAPTER 4 Product and Service Design.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
111 Media General Cable Year 2000 Project Chief Executive Officer Status Report Briefing.
1 Sean Aluoto Anthony Keeley Eric Werner. 2 Project Plan Overview Project Lifecycle model Time line Deliverables Organization plan Risk management Design.
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
Objective: Develop hybrid biological semiconductors which are EMP resistant and whose electronic properties can be directly manipulated by environmental.
Principal Investigator ESTCP Selection Meeting
EXAMPLE Biological Semiconductors with Unique Electronic Properties
Project Management Information and Tracking Advanced Concepts
Principles of Information Systems Eighth Edition
Software Planning Guidelines
Principal Investigator ESTCP Selection Meeting
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Project Title Kelvin Cheu(PI), Ron Askin (co-I)
Request for Proposal (RFP)
Product Development Scenario Overview
CLINICAL INFORMATION SYSTEM
The Systems Proposal What the book calls the “Updated Baseline Project Plan” - no standard name for it Presents the different options to the customer along.
Enter Participant Organization here Enter System / Activity Name here
Quad Template (Replace above title with name of candidate technology.)
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Principal Investigator ESTCP Selection Meeting
Milestone Presentation Format
FORCOMD Innovation Proposal: Concept Name (Arial Font, Size 20)
Principal Investigator ESTCP Selection Meeting
Technology Maintenance
Title or label as appropriate Operational and Performance Capabilities
Presentation transcript:

Quad Chart – Format Photograph or artist’s concept of the project end- item. Ideally, this will convey the main idea of the final capability/use of the prototype. It should further give an idea of the size and weight of the end item. Operational Capability: Describe how the system would provide new or enhanced operational capability to user agencies. Describe system specifications to be met. If known, list specific agencies that have expressed interest in this approach. BAA Number: (Number of the BAA Announcement) Mission Area: (Title of Mission Area from BAA Package) Requirement Number: (Only 1 Per Chart)/(Document Identifier) (See paragraph ) Proposal Title: (Brief/short Title to describe offeror’s proposed effort) Proposed Technical Approach : Specifically, how will the problem be approached. Describe tasks to be performed. Describe any actions done to date. Describe any related on-going effort by the offeror. Describe the technology involved and how it will be used to solve the problem. Rough Order of Magnitude Cost and Schedule : Provide any milestone decision points that will be required. Describe period of performance and total costs. If there are phases, provide funding per phase. Deliverables : Include all hardware and the following data deliverables: monthly status report, final report, test plans, test reports, specifications, computer program end items, user’s manual, drawings, transition plan, etc. Corporate Information : You must include Offeror Name, POC full name, address, phone numbers and . Offeror Name Date

Operational Capability to be Provided: Compile database of blast debris generated from actual events and field testing. Empirical model that will predict size, mass, velocity and distribution of debris produced inside buildings by bombs. –Model will consider windows, walls, utility systems, office equipment, and furnishings as sources. –Model will use charge weight, location, building characteristics, and equipment as input data User friendly windows version of model will add credibility to force protection vulnerability assessments, show benefit of upgrades to facilities. ROM Cost & Schedule: Proposed Technical Approach: New effort Corporate Information: Deliverables Gather data from actual blast events and tests. (Embassy Bombings, TSWG-sponsored wall studies, British, Israeli tests). Evaluate and tabulate data into categories with like characteristics and distribution patterns as a function of charge weight, location, building characteristics, and source of debris. ABC Inc, Jane Doe, 111 Main Street, Anytown, VA Phone: (703) , Fax: (703) Technical Report describing debris data sources & complied results Technical Report describing model and techniques to replicate compiled data and blast debris response scenarios Software model for rapid distribution and use by force protection teams User Manuals; Database Description; Computer Program End Item; Progress/Status Reports; Final Report, Video; Transition Plan Task 1 period of performance is 4 months; Task 2 begins after the completion of Task 1 for a period of 8 months. Total Period of Performance is 12 months Task 1 - ROM Cost of $20,000 Task 2 - ROM Cost of $100,000; $20,000 for Govt Validation Total Cost is $140,000 Broad Agency Announcement N Q-0101 Mission Area: Physical Security Requirement Number: 664 / PS-664-ABC Proposal Title: Blast Distribution Modeling for Buildings ABC Inc. 4/10/2001 Proprietary Blast Distribution Modeling for Buildings SAMPLE Task 1: Task 2: Develop debris distribution model(s) that replicate debris data showing size, mass, velocity, & distribution. Validate model against new tests and other data sources. Develop user friendly Blast Debris Model software and manual to run in Windows 98/NT environment.