Presented by: Presented By: MIL-STD 881 Update: NDIA PMSC Meeting Neil F. Albert MCR, LLC 4 February 2010.

Slides:



Advertisements
Similar presentations
ESOH Committee Task Plan
Advertisements

Presented by: Presented By: MIL-STD 881 Update: NDIA PMSC Neil F. Albert MCR, LLC 12 May 2010.
January 6. January 7 January 8 January 9 January 10.
DCIPS Performance Evaluation Administrative Reconsideration Guidance
1 ANSI/EIA A STANDARD Earned Value Management Systems Proposed Changes Discussion January 31, 2007 NDIA Program Management Systems Committee.
Work Breakdown Structures. Purpose The WBS shows different levels within the product hierarchy. For Government program managers levels 1-3 are of prime.
Parts Management Reengineering TLCSM Executive Council Update Gregory Saunders, Director Defense Standardization Program Office 05 Oct 06.
DoD Software Issues and Gap Identification Kristen Baldwin Deputy Director, Software Engineering and System Assurance OUSD(AT&L) April 18, 2007.
Department of Defense Directive (DoDD 4650
Page 1 National Defense Industrial Association (NDIA) Program Management Systems Committee (PMSC). NDIA Earned Value Management Systems Intent Guide Overview.
2009 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Dave Roberts NDIA PMSC.
Systems Engineering in a System of Systems Context
University of Southern California Center for Systems and Software Engineering Software Cost Estimation Metrics Manual 26 th International Forum on COCOMO.
The program work breakdown structure (WBS) establishes the essential
Unclassified. Program Management Empowerment and Accountability Mr. David Ahern Director, Portfolio Systems Acquisition AT&L(A&T) 14 April 2009 The Acquisition.
NDIA PMSC Scheduling Working Group. Exploratory working group Objective Objective Brainstorm and explore concerns and issues in scheduling bring them.
NDIA SE Division Meeting February 13, Developmental Test and Evaluation Committee Beth Wilson, Raytheon Steve Scukanec, Northrop Grumman Industry.
MIL-HDBK 881 Work Breakdown Structure Handbook Update
Copyright © 2009 NDIA PMSC Robert Loop August 2009 NDIA PMSC Guides Working Group Status.
Presented by: Presented By: MIL-STD 881 Update Status Neil F. Albert MCR, LLC 21 May 2009.
1 NASA Earned Value Management Update August 2006.
Work breakdown structure
DoD Parts Management Reengineering Defense Standardization Program Office Industry Day, 8 May 2007 PMRWG Final Report.
XML Working Group Joan Ugljesa NDIA PMSC April,
Earned Value Management Systems (EVMS) Defense Support Team (DST) and Report to Congress Mr. Richard Ginman OUSD(A&T)/DPAP Presentation to National Defense.
JAUS Architecture Overview. Why did we need JAUS? “Stove-Pipe” Design Subsystems common to all Unmanned Systems (US) were previously built from scratch.
Water Supply Planning Initiative State Water Commission November 22, 2004.
1 Community-Based Care Readiness Assessment and Peer Review Team Procedures Overview Guide Department of Children and Families And Florida Mental Health.
Parts Standardization & Management Committee (PSMC) Meeting Oct 22, 2007 San Diego, CA Parts Management Reengineering Implementation Process Team (PMRIPT)
Presented to: NDIA PMSC By: Keith A. Kratzert Date: August 17, 2005 Federal Aviation Administration EVM at the FAA.
Revised Department of Defense Earned Value Management Policy Deborah A. Tomsic Senior Program Analyst Office of the Under Secretary of Defense (Acquisition,
OSD Earned Value Management Activities Update Larry L. Axtell Senior Program Analyst Office of the Under Secretary of Defense (Acquisition, Technology.
© MCR, LLC MCR Proprietary - Distribution Limited Earned Value Management Application, Guidance, and Education Neil F. Albert President/CEO MCR, LLC
1 The Voice of the Industrial Base 1 IBR Guide NDIA PMSC Working Group NDIA PMSC Meeting January 31, 2007 Updated Feb 4, 2007 Prepared by; Joe Houser KM.
Mike Augustus A DCARC Update Jan ● (703) ●
OSD CAIG 1 Walt Cooper OSD Cost Analysis Improvement Group (CAIG) August 13, 2008 Weapon System Sustainment: Collection of Contractor Costs.
XML Working Group Joan Ugljesa NDIA PMSC April 25,
UN/CEFACT XML Schema Status and Data Exchange Requirement Guidelines Joan Ugljesa NDIA PMSC August 26, 2010.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
NDIA SE Division – 2014 Plan - Summary February 12, NDIA Systems Engineering Division 2014 Plan Summary - Annual Planning Meeting December 11-12,
@2002 Copyright, Itreya Technologies CMMI kick off July 2005.
0 Office of Performance Assessments and Root Cause Analyses (PARCA) PARCA EVM Update Presenter: Phone:
XML Working Group Joan Ugljesa NDIA PMSC May 3,
3/17/2008AMATS: Anchorage Metropolitan Transportation Solutions AMATS Air Quality Advisory Committee Informational Update March18, 2008.
Presented to: NDIA PMSC By: Keith Kratzert Date: May 21, 2009 Federal Aviation Administration Improving Program Performance at FAA.
XML Working Group Joan Ugljesa NDIA PMSC August 7,
1 NDIA Earned Value Management Application Guide Status Report August 16-17, 2005 Wayne Abba Walt Berkey David Muzio David Treacy NDIA EVM Application.
NASA Update NDIA PMSC Quarterly Meeting February 4, 2010 Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis Team)
Practice Standard for Scheduling Project Manager’s Meeting Status April 28, 2004 Project Manager – Douglas Clark, CEO of Métier.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
1 Felisha Hitt, Senior Procurement Analyst March 18, 2008 Defense Acquisition Regulations System
SCORM Status. 2 Stabilization, Clarification and Issue Resolution Bug Fixes, Corrections & Clarifications SCORM 2004 January 2004 SCORM nd Edition.
Internal Information Services Risk Management Working Group Gay Infanti Northrop Grumman 15 August 2006.
NASA Update NDIA PMSC Quarterly Meeting August 26, 2010 NDIA PMSC Quarterly Meeting August 26, 2010 Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis.
1 1 Defense Acquisition Guidebook Progress Update March 27, 2012.
NDIA PMCS May Rosslyn, VA Earned Value Management System Acceptance Working Group Buddy Everage Working Group Lead.
UN/CEFACT XML Schema Status and Data Exchange Requirement Guidelines Joan Ugljesa NDIA PMSC January 29,
2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Mary Ann Hale NDIA PMSC.
Parts Management Re-engineering and Warfighter Support International Society of Logistics May 17, 2005 Gregory E. Saunders Director, Defense Standardization.
Presented by: Presented By: MIL-STD 881 Update Neil F. Albert MCR, LLC 26 August 2010.
Strength through Industry & Technology How is the Government Managing for Value? Program Management Systems Committee March 11, 2007 The Voice of the Industrial.
1 The Voice of the Industrial Base 1 IBR Guide NDIA PMSC Working Group NDIA PMSC Meeting August 7, 2007 Prepared by; NDIA IBR Working Group August 2007.
1 The Voice of the Industrial Base 1 IBR Guide NDIA PMSC Working Group NDIA PMSC Meeting April 24, 2007 Prepared by; NDIA IBR Working Group April 15, 2007.
Maj John Tieken HQ AFSPC/A5FG Launch and Test Range Activities Update October 2006.
NDIA PMSC Baseline Stability Working Group February 2010 Neil Albert Pete Wynne.
Dianne Copeland, Director FSIO Oracle CAB December 3, 2008
Implementation Review Team Meeting
Earned Value Management
NDIA Earned Value Management Application Guide
NDIA Intent Guide Update for EVMIG.
Presentation transcript:

presented by: Presented By: MIL-STD 881 Update: NDIA PMSC Meeting Neil F. Albert MCR, LLC 4 February 2010

Background of MIL-STD Update Update initiated in October 2008 with requirement to: –Update to Incorporate Changes to reflect DoD Acquisition Policy and Guidance (DODI ) –Add/Improve upon WBS Definitions –Clarify How WBS can be used with Newer Terms and Processes –Ensure the WBS is characterized as an Acquisition tool –WBS to support budget, cost, schedule, technical, contractual and performance management –Ensure Industry Participation Mr. Young’s memorandum of 9 January 2009 –Establishes MIL-HDBK as MIL-STD to ensure consistency in application –Enforces April 2005 Memorandum - WBS is consistent for Cost Estimating (CCDR), Performance Measurement (EVM), and Scheduling (IMS) –Supports development/maintenance of Central Repository 2

Systems/Appendices Addressed Established focus groups to update WBS and definitions for all appendices and add new appendices –Government and industry participation includes Program Offices, Systems/Software Engineers, Cost Estimating and EVM communities –Systems/Appendices Addressed Aircraft Systems AIS/ERP Systems (new appendix) Electronic Systems including embedded SW (adding templates: Processors, EW, Radar, Comm, Nav/Guide) Missile Systems Launch Vehicles (new appendix) Space Systems Unmanned Aircraft Systems Sea Systems Unmanned Sea Systems (new appendix) Ordnance Systems Surface Vehicle Systems Propulsion Systems (new addendum) Construction (new appendix) Common Elements System of Systems (new addendum) 3

Status of Appendices Aircraft Systems – Draft Completed AIS/ERP Systems (new appendix) – Draft Completed Electronic Systems including embedded SW (adding templates: Processors, EW, Radar, Comm) – Draft Completed (templates to be completed) Missile Systems – Draft Completed Launch Vehicles (new appendix) –Face to face meeting planned for Feb Space Systems – Draft Completed –Rewrote to match flow and wording of MIL-STD Unmanned Aircraft Systems – Draft Completed Sea Systems – No change made to Appendix Unmanned Sea Systems (new appendix) –Face to face meeting planned for Feb 4

Status of Appendices Ordnance Systems – Draft Completed Surface Vehicle Systems – Draft Completed Propulsion Systems (new addendum) –Face to face meeting planned for early March Construction (new appendix) – Will not be included Common Elements –Changes to Appendix in process including the addition of specific elements for each system appendix as well as Interim Contractor Support System of Systems (new addendum) –In process; to be completed by March Policy Document –In process; to be completed by March 5

Conclusion Government and Industry worked together to ensure common definitions and applications Software and technology incorporated into all appendices Construction effort – delayed due to lack of participation from Corps of Engineers and Navy Facitilities Coordinated effort with Logistics/O&M effort by OSD CAPE Anticipated Schedule –Finish definitions and rewrite by end March –Send to Government/Industry review April - March –Publish final version August