CLIC workshop ”Two beam hardware and integration” working group Module layout and main requirement G. Riddone, A. Samoshkin 17.10.2007.

Slides:



Advertisements
Similar presentations
COOLING TUBE ACCELERATING STRUCTURE MANIFOLD COUPLER VACUUM INTERFACE FLANGE RF INTERFACE FLANGE TUNING STUD ENGINEERING DESIGN AND FABRICATION OF X-BAND.
Advertisements

CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on.
PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
SLAC workshop 7-10 July 2009 WP1: microwave based accelerators Status of CLIC X-band high-power components G. Riddone, (contribution from A.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
Design of Standing-Wave Accelerator Structure
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
Different mechanisms and scenarios for the local RF
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
Drive beam magnets powering strategy Serge Pittet, Daniel Siemaszko CERN, Electronic Power Converter Group (TE-EPC) OUTLINE : Suggestion of.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
2nd CLIC Advisory Committee (CLIC-ACE), CERN January 2008 Introduction to the CLIC Power Extraction and Transfer Structure (PETS) Design. I. Syratchev.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
Cost Model including Civil Engineering and Conventional Facilities Hans-H. Braun, CLIC ACE, June 20, 2007  Cost model goals  Methodology  Scaling assumptions.
The CLIC decelerator Instrumentation issues – a first look E. Adli, CERN AB/ABP / UiO October 17, 2007.
CTC, Outcome from Two-beam Module Review on15/ G. Riddone,
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
cern.ch International Workshop on Linear Colliders 2010 CLIC TWO-BEAM MODULE DESIGN & INTEGRATION 21-Oct-2010 WG 8 «TECHNICAL SYSTEMS»
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
TBTS Test Program & Schedule G. Riddone
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
CLIC accelerating structures: study of the tolerances and short range wakefield considerations R. Zennaro CERN.
Principals of fast injection and extraction R. Apsimon.
Peak temperature rise specification for accelerating structures: a review and discussion CLIC meeting
CLIC meeting CLIC module status G. Riddone on behalf of the CLIC Module WG,
Risto Nousiainen, CLIC workshop ” Technical Issues, Integration & Cost ” working group Progress on Study of Module Cooling Risto Nousiainen.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
1 Design and objectives of test accelerating structures Riccardo Zennaro.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
GOLD- ELECTROPLATING COOLING FITTING ADAPTER ACCELERATING STRUCTURE CONCEPTUAL DESIGN OF X-BAND ACCELERATING STRUCTURE TD26 CC SIC Abstract Many accelerating.
Structure Wakefields and Tolerances R. Zennaro. Parameters of the CLIC structure “CLIC G” (from A. Grudiev) StructureCLIC_G Frequency: f [GHz]12 Average.
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
Status of the CLIC module R&D G. Riddone on behalf of the CLIC module WG (special contributions from A. Samoshkin, D. Gudkov, A. Solodko, N. Gazis)
Two-beam module layout
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
Status of CIEMAT work on PETS
LCWS11 WG4 Fully featured accelerating structure engineering design
CLIC Parameter Working Group Two Beam Module Design
CLIC module working group
CLEX* Status and Plans CTF3 complex CLEX
Thermal review of CLIC module
RF Power Generation and PETS Design
Have a chance to operate your own beam at CERN
List of changes and improvements for the next generation CLIC module
Tolerances: Origins, Requirements, Status and Feasibility
LCWS 2017 – 26th October C. Rossi
Advanced Research Electron Accelerator Laboratory
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

CLIC workshop ”Two beam hardware and integration” working group Module layout and main requirement G. Riddone, A. Samoshkin

G. Riddone, CLIC07 workshop, Content Introduction and general CLIC parameters Layout Main system requirement Tunnel integration Conclusions

Introduction

G. Riddone, CLIC07 workshop, Several activity domains

G. Riddone, CLIC07 workshop, CLIC layout

G. Riddone, CLIC07 workshop, Main parameters

Layout

G. Riddone, CLIC07 workshop, Standard module x Accelerating structures: x Power extraction and transfer energy PETS: x 71500

G. Riddone, CLIC07 workshop, Quadrupole type modules Type 1 (x 286) Type 2 (x 1328)

G. Riddone, CLIC07 workshop, Quadrupole type modules Type 3 (x 948) Type 4 (x 1440)

G. Riddone, CLIC07 workshop, CLIC module Type 1 quadrupole module

G. Riddone, CLIC07 workshop, Standard module Main beam 8 accelerating structures Drive beam 4 PETS (1x 2 acc. str.) 2 quadrupoles

G. Riddone, CLIC07 workshop, Module cross-section

G. Riddone, CLIC07 workshop, Module top-view

Main components

G. Riddone, CLIC07 workshop, Main components: structures OFF: 20 msec ON: 20 sec PETS parameters:  Aperture = 23 mm  Period = mm (90 0 /cell)  Iris thickness = 2 mm  R/Q = 2258 Ω  V group=  Q = 7200  P/C = 13.4  E surf. (135 MW)= 56 MV/m  H surf. (135 MW) = 0.08 MA/m (ΔT max (240 ns, Cu) = 1.8 C 0 ) Accelerating structure (A. Grudiev) PETS (I. Syratchev)

G. Riddone, CLIC07 workshop, Main components: Quadrupoles Aperture radius:13.0 mm Integrated gradient: 14.3 Tm/m Nominal gradient: 67.1 T/m Total length:270 mm Magnet width:390 mm Magnet weight:180 kg Distance between opposite coils: 118 mm Water cooling Aperture radius:4.00 mm Integrated gradient: 70 (170, 270, 370 ) Tm/m Nominal gradient: 200 T/m Total length:420 (920, 1420, 1920) mm Magnet width:< 200 mm Magnet height:< 200 mm Magnet weight:~ 75 (110, 135, 270) kg Water cooling Drive beam Main beam See talk T. Zickler

G. Riddone, CLIC07 workshop, Main components Waveguide connection between PETS and accelerating structures: –Choke mode flanges (see talk D. Carrillo) High power loads Waveguides External supports Vacuum equipment Alignment equipment

Systems

G. Riddone, CLIC07 workshop, System specification –Structure fabrication and assembly –RF network definition –Alignment/supporting system (close collaboration with beam dynamics working group) –Stabilization system –Vacuum system –Cooling system –BPM definition and beam instrumentation These activities have to be developed in close collaboration with integration study  tunnel integration, transport and installation

G. Riddone, CLIC07 workshop, Tolerances Tolerances of the structures: 4 kinds of tolerances: Machining (Δx, Δy, Δz) (see talk of M. Taborelli) Assembly (Δx, Δy, Δz) Alignment (Δx, Δy, Δz) Operation [Cooling] (ΔT (t) water in, ΔT (z)) 3 kinds of problems Alignment (wakefield effects) Bookshelf (transverse kick) RF matching (reflected power, phase errors) Predictable: operational temperature, longitudinal elongation, transverse elongation Unpredictable: water temperature instability, RF power variation

G. Riddone, CLIC07 workshop, Alignment system Standard module Special module See talk of H. Mainaud-Durand Transverse tolerances

G. Riddone, CLIC07 workshop, Stabilisation system Performance will be limited by vibration of the focusing quadrupoles More stringent requirement in vertical direction (CLIC note 530) Resistive quadrupoles  they incorporate water cooling circuits, which will increase the vibration level of the quadrupoles  cooling induced vibration –preliminary promising tests done (CLIC NOTE 578) –But detailed study and dedicated development required See talk of A. Jeremie CERN vibration test stand Stability requirements (> 4 Hz) for a 2% loss in luminosity MagnetIxIy Linac (2600 quads)14 nm1.3 nm Final Focus (2 quads)4 nm0.2 nm Need active damping of vibrations

G. Riddone, CLIC07 workshop, Vacuum system Main beam and drive beam: same vacuum  via waveguide interconnections Requirement dictated by beam dynamics – mbar for transfer lines –10 -8 mbar could be accepted for main beam Pumping –during nominal operation –during breakdown –P recovery between breakdowns (main beam 8 m 2 surface to be pumped) Pre-evacuation: Mobile TM stations (access needed) Holding pumps: Ion+ Sublimation pumps Sectorisation  length of sector determined by –Operation: in case of failure or modification all the length vented=> reconditionning. Failure rate? –Additional space required (~ 20 cm) –Additional cost See talks of N. Hilleret, A. Latina, P. Costa-Pinto

G. Riddone, CLIC07 workshop, Supporting system Mechanical and thermal stability required See talk of R. Nousiainen, F. Toral Main beam –Accelerating structures on girders Girder attached to cradles at the two extremities Alignment system integration (pre- and beam based alignment) –Main beam quadrupole on dedicated supports Stabilisation and alignment system integration Drive beam –PETS and quadrupoles on the same girders –Pre-alignment system integration Cradles mechanically attached to a girder and linked by rods to the adjacent one

G. Riddone, CLIC07 workshop, Cooling system Water cooling for accelerating structures, quadrupoles and loads Water cooling for PETS to be confirmed Different operation modes to be taken into account More stringent requirement: cooling of the acc. structures (~ 600 W/as) –Different cooling configurations according to under study  consequence on the needed volumetric flow Temperature stabilisation +/- 0.1 K Temperature drop across acc. structure: 1.5 K See talks of J. Inigo-Golfin, R. Nousiainen

G. Riddone, CLIC07 workshop, Beam instrumentation See talks of L. Soby, G. Montoro

Tunnel integration

G. Riddone, CLIC07 workshop, CLIC tunnel cross section See talks of B. Jeanneret and L. Rinolfi Transport: see talk of K. Kershaw

G. Riddone, CLIC07 workshop, See talk of J. Osborne

G. Riddone, CLIC07 workshop, Drive beam return loop Special zone: to be carefully studied

G. Riddone, CLIC07 workshop, Conclusions Dedicated development programs of systems including, micron precision pre-alignment, nanometer stabilization, cooling, vacuum, beam instrumentation, active alignment and beam dynamics, etc. are needed An important issue is the integration of these various systems into the CLIC module which will be repeated over twenty thousand times along the length of CLIC  optimization, reliability, scheduling (see talk of M. Gastal) and cost The module study raises feasibility issues, identifies areas needing study and design, addresses important aspects of cost and provides basic parameters for other areas of the study Test module in CLEX from 2008 (see talks of K. Alam and F. Toral [TBL]): –System integration –Alignment system –Stabilization system

G. Riddone, CLIC07 workshop, CLEX layout TL2 TBL – decelerator two-beam test stand CALIFES probe-beam linac Space reserved for ITB – Instrumentation Test Beam line

G. Riddone, CLIC07 workshop, Acknowledgment to the members of the CLIC module working group Layout W. Wuensch I. Syratchev: PETS A. Grudiev: accelerating structures T. Zickler: Quadrupoles Transfer lines: B. Jeanneret, L. Rinolfi Module integration A. Samoshkin, R. Leuxe T. Sahner - M. Taborelli W. Wuensch Vacuum system P. Costa-Pinto - P. Chiggiato N. Hilleret Alignment/supporting system H. Mainaud-Durand – T. Touzet (survey/alignment) R. Nousiainen (supports) J. Huopana (structure assembly) Cooling system J. Inigo-Golfin, R. Nousiainen Beam dynamics and stabilisation D. Schulte Beam instrumentation L. Søby PETS on-off mechanism B. Nicquevert Tunnel integration, installation J. Osborne G. Riddone, A. Samoshkin Radiation H. Vincke Cost estimate G. Riddone