By Larry Redd, P.E. Redd Engineering Report for TCCE Annual Meeting Ken Spear, P.E. WYDOT Contracts & Estimates Engineer.

Slides:



Advertisements
Similar presentations
TM OBTransformation.com. C-Level Trends of Note ISSUES OF NOTE Funding New Business Entering New Markets Globalization REQUIRES Innovation Flexibility.
Advertisements

Market risk management of public debt First Annual Meeting of Latin American and Caribbean Public Debt Management Specialists Ove Sten Jensen & Morten.
MANAGEMENTS DISCUSSION & ANALYSIS NMASBO Fall Conference 2012 Taos, New Mexico Presented by Leslie Smith, Retired Business Manager.
Use of reference biospheres to prove long-term safety of repositories for radioactive waste Workshop, Berlin, August 2008.
PROJECT RISK MANAGEMENT
FY16 Budget Discussion 11/03/14
Will CO2 Change What We Do?
1 AFDC MAFC Training Program Shanghai 8-12 December 2008 Interest Rate Risk Management Christine Brown Associate Professor Department of Finance The University.
Tina Byles Williams, CEO & CIO December 10, 2008 MANAGER OF EMERGING MANAGERS STRATEGIES “Survival of the Nimble” Why Smaller Investment Managers Outperformed.
Presented by: Jerri Bohard, ODOT Transportation Development Division Administrator Paul Mather, ODOT Highway Division Administrator Travis Brouwer, ODOT.
Managing Risks in the Project Pipeline Minimizing the Impacts of Highway Funding Uncertainties Larry Redd, P.E. Tim McDowell, WYDOT, P.E. Larry Redd LLC.
Contract Types. Forms of Contracts Completion – A product is delivered –Cost or Fixed Price –Product must be delivered –Contract completed on delivery.
Days Of Supply Protects the plant from variation between forecasted and actual usage between vessels, and vessel delays.
Option Theory and Housing Jeff Kelsh. Housing  Owning a house is a right and not an obligation, therefore it is an option.  Option to buy or rent 
CHAPTER 13 Measurement of Interest-Rate Risk for ALM What is in this Chapter? INTRODUCTION RATE-SHIFT SCENARIOS SIMULATION METHODS.
FASAB Update CIGIE/GAO Financial Statement Audit Conference Wendy Payne Executive Director March 30, 2011.
CHAPTER 13 Measurement of Interest-Rate Risk for ALM What is in this Chapter? Introduction Gap Reports Contractual-Maturity Gap Reports Estimating Economic.
Service Level Agreements. Introduction  Pre IT economies, services contracted out were remote from the core business activities of the customer. Most.
Due to Congestion Presented By: Alexander Knapp.
The Weighted Cost of Capital. Objectives n Define the concept of cost of capital. n Use the concept of cost of capital to link the investment decisions.
Vladimir Liberzon Oksana Sakhraui Victoria Shavirina Spider Management Technologies, Moscow, Russia
1 Western Wind and Solar Integration Study Site Selection Analysis 5/14/2008.
Sampa Video, Inc. A small video chain is deciding whether to engage in a new line of delivery business and is conducting an economic analysis of the valuation.
© 2008 Pearson Education Canada5.1 Chapter 5 The Behaviour of Interest Rates.
1 MONEY & BANKING Week 3: The behavior of Interest rates Chapter 5.
Putting a price tag on the Common Core: How much will smart implementation cost ? Patrick Murphy Elliot Regenstein with Keith McNamara For the Thomas B.
Economic Analysis: Applications to Work Zones March 25, 2004.
A New Perspective to investing.
American Library Association 2009 Annual Conference Chicago, IL FY 2010 Total ALA Budget Presentation (Annual Estimate of Income & Budgetary Ceiling) Presented.
Phoenix Convention Center Phoenix, Arizona Using Private Financing to Maximize Energy and Cost Savings Track 5: Project Financing Session 7: Economics.
Reducing Social Security PRA Risk at the Individual Level — Lifecycle Funds and No-Loss Strategies Pathways to a Secure Retirement Conference, August 2006,
Presentation Ling Zhang Date: Framework of the method 1 Using Distribution Fitting for Assumptions 2 monte – carlo simulation 3 compare different.
FAMILY ECONOMICS & FINANCIAL EDUCATION © Family Economics & Financial Education – Revised November 2004 – Investing Unit – Language of the Stock Market.
1 IFSWF Subcommittee #2 Case Study #2: Managing Currency Exposures of Financial and non-Financial Assets.
One Step Ahead: Using a Finance Plan for Regional Water System Operations Deena Hood Central Wyoming Regional Water System Carol Malesky Integrated Utilities.
1 Casualty Loss Reserve Seminar September 14, 1999 Presented by: Susan E. Witcraft Milliman & Robertson, Inc. DYNAMIC FINANCIAL ANALYSIS What Does It Look.
COMMUNITY CHOICE AGGREGATION: TECHNICAL STUDY RESULTS Peninsula Clean Energy September 24,2015.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
Network Life Cycle Analysis for Bridge Management Rebecca Curtis, P.E. Michigan Department of Transportation Bridge Management Engineer 2015 Transportation.
Surviving A Wild Ride: The Impact of College and University Endowment Performance on College and University Budgets-- Today and Tomorrow Ken Redd Director,
Explaining Hedge Fund Performance With Risk Sigma Asset Management March 1, 2001.
IIASA analysis of near-term mitigation potentials and costs in Annex I countries.
Managing Market Risk. Board of Directors The Boards defines –Market risk –Management policies –Procedures –Prudential risk limits –Review mechanisms –Reporting.
Chapter 8 Capital Asset Selection and Capital Budgeting.
PRSPs, Macroeconomic Constraints and Fiscal Policy Humberto Lopez (PRMPR)
CIA Annual Meeting LOOKING BACK…focused on the future.
© English Matthews Brockman Business Planning in Personal Lines using DFA A Talk by Mike Brockman and Karl Murphy 2001 Joint GIRO/CAS Conference.
Estimating future scenarios for farm-watershed nutrient fluxes using dynamic simulation modelling – Can on-farm BMPs really do the job at the watershed.
Two Models for Decision-Making Support in Computer Assisted Exercise Nikolay Zhivkov Institute of Mathematics and Informatics Bulgarian Academy of Sciences.
Adaptive Sleep Scheduling for Energy-efficient Movement-predicted Wireless Communication David K. Y. Yau Purdue University Department of Computer Science.
Trust Business Plan 2004/5 b Overview - this year against last year b Financial summary b Follow up action.
Northwest Power and Conservation Council The Northwest Experience with Energy Efficiency As A Resource Option Tom Eckman Manager, Conservation Resources.
Making Bath & North East Somerset an even better place to live, work & visit BUDGET FAIR 2012 Tim Richens Divisional Director of Finance.
Fourth Quarter / Full Year Earnings 2008 Kimberly Ross Chief Financial Officer March 2, 2009.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
ROTH IRA VS. TRADITIONAL IRA TEAM 6 Vicente C. Gonzaga & Erl Malboeuf.
Northwest Power and Conservation Council The Role of Electric Energy Efficiency in Reducing PNW Carbon Emissions Tom Eckman Manager, Conservation Resources.
 SCDOT has over 41,000 miles of pavements and over 8,400 bridges.  4 th largest state maintained system in the country.  Started working on the TAMP.
From Economic Activity to Ecosystems Protection in Europe
Designing Resilient Bridges:
Step Free Access Programme
Enron Energy Services Energy Management Outsourcing Overview
Economic balance of the institute
Roth IRA vs. Traditional IRA
BUDGET WORKSHOP February 15, 2017.
From Economic Activity to Ecosystems Protection in Europe
ACEC Bobby Lewis August 2017.
FIN 360: Corporate Finance
Dick Dietrich, Accounting & MIS Anil Makhija, Finance
Concept Technical Approach Application Collaborations
Presentation transcript:

by Larry Redd, P.E. Redd Engineering Report for TCCE Annual Meeting Ken Spear, P.E. WYDOT Contracts & Estimates Engineer

Reason for study Types of projects in Wyoming 1R/2R/3R/4R Understanding uncertainties and risks related to project delivery Balancing the Hurry Up Costs with Holding Costs 2

Getting projects into the pipeline Conflicts between over- and under- programming Holding costs vs hurry up costs Try for a balance Simulation model Dynamic because of scenario analyses Projects placed in STIP Asset management Project Selection 3

Two major strategy methodologies Core Strategies Critical Project Method List of ‘on the shelf’ projects Control of Design Time Balanced budget of projects Good Estimates System & Organizational Improvement Strategies Organizational Transportation Asset Management Funding Economic Project Management Software 5

3 Strategies to load pipeline Constant No futuristic assumptions Tracked Assume constant funding No assumptions with regard to avg. dollar amount over time Projected Strategies Projected projects, projected two years funding 8

Two strategies for draining projects from pipeline Traditional method Targeted mix of projects Critical project method Priority to higher end projects More costly to delay higher level projects Funding Scenarios for draining pipeline LowHigh HighLow 10

Conclusion Significant savings Process improvements Further research Questions?