Septum 16 shielding increase: result of phase 2 of “Avant projet” S. Gilardoni (BE/ABP) In collaboration with S. Roesler, D. Forkel-Wirth, S. Damjanovic,

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Radiation Protection aspects of the Switch-Yard operation V. Donate, G. Dumont, Joachim Vollaire on behalf of DGS-RP.
L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013.
1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
Multi-Turn Extraction / L.Ducimetière / Kicker options for MTE Prepared by L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling.
BDS Design Studies John Amann ILC Mechanical Engineering 10/24/06.
Software Quality Assurance Activities
RP PROCEDURE FOR FLUID ANALYSIS Detector Cooling Project - 16 th June 2011 Heinz Vincke, Nadine Conan DGS/RP..... based on EDMS document # prepared.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
TS, Length of YETS EYETS LIU & CONS Project
MG - IEFC meeting 22/01/20101 Linac 3 shielding S. Gilardoni, M. Giovannozzi, S. Baird, R. Brown, S. Damjanovic, T. Otto, M. Widorski, Acknowledgements:
Additional Lift to Access ECA5 Etienne Carlier, Jean-Louis Grenard, Damien Lafarge SPS Dump Upgrade Meeting 09/07/2015.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
AN INTEGRATED DESIGN CONCEPT … … FROM UNDERGROUND UP TO THE TOP ODOTECHNIKI LTD CONSULTING ENGINEERS Address: 59, 3 rd September Str.
1 1. Some recent views ( ) 2 Linac tunnel
Status of Radiation Protection studies in support of ELENA R. Froeschl and J. Vollaire DGS-RP-AS.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
F. Regis, LINAC4 – LBS & LBE LINES DUMP DESIGN.
Introduction From a neutron flux (> 20 MeV), with the Leaching model (Lessard) based on SBMS (Tables 1 and 2):
Status of Radiation Protection Studies for the Linac4 beam dumps Joachim Vollaire DGS/RP.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
PS losses during CT extraction, a history about 30 year long... J. Barranco, S. Gilardoni CERN - AB/ABP.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
LIU external beam dump review External beam dump option A: branching off from LSS6 J.L. Abelleira Thanks to: F. Velotti, B. Goddard, M. Meddahi, H. Vincke,
Prof. Roy Levow Session 2.  Define the Project  Develop a Detailed Plan  Launch the Plan  Monitor / Control Project Progress  Close Out the Project.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Overview of HINS Operations and Radiation Shielding Considerations in the Meson Detector Building Bob Webber August 16, 2006.
11/15/20051 Radiation Protection Issues for ILC (not exhaustive) A. Fassò, N. Noriaki, H. Vincke Radiation Physics.
Status of ATF Fast Kicker Experiment
PIP Wednesday March 21, /21/12 Agenda Project Update(s) Pellico - PIP Status Talk(s) 1.Ryan Crawford: Linac Power Distribution - Shutdown 2012 activities.
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
NToF - Radiation Protection M. Brugger, P. Cennini, A. Ferrari, E. Lebbos, V. Vlachoudis CERN AB/ATB/EET.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee.
Optimization of beam envelop at the injection point of PS Chenghui Yu Jan. 30, 2012.
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
R ADIATION P ROTECTION ASPECTS LSS1 LHC f RE - INSTALLATION Cristina Adorisio (CERN - DGS/RP) LTEX Meeting – May 10 th, 2012.
High Intensity Beams in Existing Accelerators for CN2PY: SPS studies, PS issues E. Shaposhnikova Laguna-LBNO General Meeting CERN, Acknowledgments:
ATLAS Forward Project (AFP) Technical review outcome Review done on (morning) September 2013, see agenda
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
Electrial Safety LS2 days November 2016 AP
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
East Hall under construction
(Beam) Impact of MTE on the PS septa
Beam Loss and Radiation Working Group: Conclusions
News from R2E – Safe Room Proposal of local fire-resistant racks agreed upon Performed visit (HSE, EN-EL, R2E) to clarify details Solution already integrated.
Power converters for 2GeV injection
TZ32 tunnel H. MAINAUD DURAND, BE-ABP/SU CTC 07/07/2009.
Special LS1 day on 12 June 2012, EDMS:
SuperB Experimental Hall
Elena Wildner, CERN EUROnu meeting Paris June
Automatic Generation of the Radiation Level Weekly Reports Update 18
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
BT1 SMV10 Stripline Failure
EP Experiments safety validation process Safety Permits
Fassò, N. Nakao, H. Vincke Aug. 2, 2005
PROPOSAL OF APERTURE FOR THE INNER TRIPLET
Beam dump for J-Parc neutrino facility
WP 2 Update Fire Detection and Extinguishing FCC Collaboration
Large Scale Structures
FASER LS2 work coordination meeting
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
Presentation transcript:

Septum 16 shielding increase: result of phase 2 of “Avant projet” S. Gilardoni (BE/ABP) In collaboration with S. Roesler, D. Forkel-Wirth, S. Damjanovic, J. Vollaire, G. Dumont (DGS/RP) H. Damerau, A. Lopez-Hernandez (GS/SE) IEFC – 29 June 2012

Phase 2 of “Avant projet” Goal of the study: -Revise CE design after shielding increase to recover margin (61st IEFC) of factor of 3 in term radiation field (hp: 1.1e13 pot/s and MTE losses) -Optimize shielding to reduce risk for existing structure and optimize cost

RP presentation from 61 st IEFC (S. Damjanovic) The extra-concrete shielding required following HSE recommendations has been converted in earth shielding New max ground level: m

Proposed solution I/III Install pre-stressed concrete beams to support the earth shielding Beams supported by tunnel walls on one side and eventually on micro- pillars on the other side

Proposed solution II/III Section completely supported by tunnel walls

Where samples will be taken (Septum 16) Section supported by tunnel walls and micro-pillars

Soil Sampling Soil sampling on top of rte Goward and SMH16 to check eventual contamination -samples taken, intervention without any issue -Analysis progressing, results expected soon Carottage done near the PS walls to validate CE design for SMH16 - evaluation of geotechnical properties of the molasse under PS tunnel - Phase 3 of design work (CE detailed studies) will take into account these results

Risk assessment, planning, next steps -EDMS document with description of shielding increase will be circulated for comments/approval as done for R.te Goward -Phase 3 of CE studies will be launched to optimize the current design and prepare the detailed project - First revision of the cost: ~ 1.9 MCHF (only main works, without studies) - Duration: 6 months - We are probably reaching the maximum shielding we can put on top of the machine and still keeping the intervention and the risk associated at a reasonable level. -The shielding has been dimensioned to be compatible with MTE operation and the installation of the dummy septum (loss displacement by 1 straight section) A better shielding should not encourage to have more losses….