Texas Nodal © 2005 - 2006 Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Operations Energy Settlements Business Requirements.

Slides:



Advertisements
Similar presentations
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 RT Energy Settlements Mini Market Examples Formulas.
Advertisements

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Market Ancillary Services Business Requirements.
Lead from the front Texas Nodal 1 Texas Nodal Settlements Mini-Market - CARD July 27, 2007.
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
CSWG Update Blake Holt ERCOT CSWG 02/23/ CRR Balancing Account $2,179, CRRBACRTOT $67,789.11CRRFEETOT DACRRSAMTTOT $500, $1,747,349.16CRRBAF.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Ancillary Services – Day-Ahead & Real Time Markets Mini Market.
QSE Managers Working Group July 11, 2011 Base Point Deviation – NPRR377 ERCOT Settlement & Billing Group.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 8, 2008.
1 Review of Aging Projects Additional Materials July 16, 2015.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
January 14, New logic and invoices used in January 2015 when closing out December 2014 New Bill Determinants: CRRBAFA- CRR Balancing Account Fund.
1Texas Nodal Texas Nodal Commercial Systems COMS CSD Presentation By ERCOT Wednesday, 1/10/2007.
Texas Nodal Section 9: Invoicing ERCOT, Settlements & Billing SDAWG - August 2007.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Reliability Must Run Settlements Business Requirements.
Settlement Stability 2015 Q1 Update to COPS Mandy Bauld ERCOT COPS 04/15/2015.
Nodal Settlement Delta Calculations and Statements – 7/11/06 Workshop  Objective: Describe design concepts of nodal settlement delta calculations and.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
Calculation of Net Energy for Load COPS. 2 2 Outline  Definition of Net Energy for Load  How Net Energy for Load is calculated in ERCOT.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 NPRR to Clarify RUC Capacity Shortfall Ratio Share Formula.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
Lead from the front Texas Nodal 1 Texas Nodal Day-Ahead CRR Settlements Business Requirements TPTF Presentation ERCOT Settlements.
Market Credit Working Group Update to WMS Wed. Sept 16, 2009.
Application of High Sustainable Limit With PRR 666/676 WMS November 15, 2006 Ino Gonzalez ERCOT Settlements.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 8, 2008.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Invoices Business Requirements Settlements and.
Protocol Revision Subcommittee Tom Burke September 7, 2012.
Technical Advisory Committee (TAC) update to RMS Kathy Scott January 3, 2013Technical Advisory Committee 1.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Dispute Management System Business Requirements ERCOT.
Settlement Update Blake Holt ERCOT 2/15/2016. Agenda NPRR689 – R1 – 02/10/16 NPRR744 – Buy-Back notification NPRR746 – Negative load impacts 2016 Settlement.
Default Uplift Max MWh Activity Total Matthew Tozer Manager, Settlements and Billing WMS 1/8/2014.
November 27, 2012 NPRR322, Real-Time PTP Option Modeling Implementation Overview.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
ORDC Settlements Overview Matthew Tozer & Blake Holt ERCOT CSWG 4/21/2014.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
October, 2011 MCWG/CWG Review of Abacus Loss Allocation ERCOT Mandy Bauld.
Protocol Revision Subcommittee Tom Burke January 3, 2013.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Mini Market Mini Market Walk Through for Day-Ahead.
Settlement Stability 2015 Q1 Update to COPS- DRAFT Blake Holt ERCOT COPS 07/15/2015.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Reliability Unit Commitment (RUC) Settlements Business Requirements.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Market Energy Settlements Business Requirements.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Voltage Support Settlements Business Requirements.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
QSE Managers Working Group October 12, 2010 Base Point Deviation Issues – Short Term and Long Term Solutions Nodal Settlement & Billing Group.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Statements and Calendar Business Requirements Settlements.
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
Real Time Revenue Neutrality CSWG 2/27/2012 Jim Galvin.
Settlement Update Austin Rosel ERCOT February 27, 2017.
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
John Dumas Director, Wholesale Market Operations
Ancillary Service Trades and Ancillary Service Settlement
QSE Managers Working Group July 11, 2011 Base Point Deviation – NPRR377 ERCOT Settlement & Billing Group 1.
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Presentation transcript:

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Operations Energy Settlements Business Requirements Settlements and Billing August 22, 2006

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 2 Agenda Relevant Charge Type Calculations Highlights of Business Requirements –Calculation Map –Calculation –Outstanding Issues or Assumptions

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 3 Charge Type Calculations Real-Time Energy Imbalance Payment or Charge at a Resource Node, Load Zone, or Hub (PR , PR , PR , PR (h)) Real-Time Energy Payment for DC-Tie Import (PR , PR (i)) Real-Time Payment for a Block Load Transfer Point (PR , PR (j)) Real-Time Energy Charge for DC Tie Export represented by the QSE under Oklaunion Exemption (PR , PR (k)) Real-Time Congestion Payment or Charge for Self-Schedules (PR 6.6.4, PR (l)) Base Point Deviation Charge for Over Generation (PR , PR (m)) Base Point Deviation Charge for Under Generation (PR , PR (m)) IRR Generation Resource Base Point Deviation Charge (PR , PR (m)) Base Point Deviation Payment (PR , PR (n)) Real-Time Revenue Neutrality Allocation (PR , PR (aa)) ERCOT System Administration Charge (PR , PR (rr))

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 4 Real-Time Energy Imbalance Payment or Charge (1)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 5 Real-Time Energy Imbalance Payment or Charge (2) Requirement IdFR 10 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (2) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the Real-Time Energy Imbalance Payment or Charge by QSE and a Resource Node Settlement Point for each 15-Minute Settlement Interval in the Operating Day. RTEIAMT_ _ =(-1) * RTSPP_ * { RTMG_ _ _ + (SSSK_ _ * ¼) + (DAEP_ _ * ¼) + (RTQQEP_ _ * ¼) - (SSSR_ _ * ¼) – (DAES_ _ * ¼) – (RTQQES_ _ * ¼)} Requirement IdFR 11 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (2) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the Real-Time Energy Imbalance Payment or Charge by QSE and a Load Zone Settlement Point for each 15-Minute Settlement Interval in the Operating Day. RTEIAMT_ _ =(-1) * RTSPP_ * { (SSSK_ _ * ¼) + (DAEP_ _ * ¼) + (RTQQEP_ _ * ¼) – (SSSR_ _ * ¼) – (DAES_ _ * ¼) – (RTQQES_ _ * ¼) – RTAML_ _ }

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 6 Real-Time Energy Imbalance Payment or Charge (3) Requirement IdFR 12 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (2) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the Real-Time Energy Imbalance Payment or Charge by QSE and a Hub Settlement Point for each 15-Minute Settlement Interval in the Operating Day. RTEIAMT_ _ =(-1) * RTSPP_ * { (SSSK_ _ * ¼) + (DAEP_ _ * ¼) + (RTQQEP_ _ * ¼) – (SSSR_ _ * ¼) – (DAES_ _ * ¼) – (RTQQES_ _ * ¼) } Requirement IdFR 13 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (3), PR (3), PR (3) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the total of RTEIAMT across all Settlement Points for each QSE and for each 15-Minute Interval in the Operating Day. RTEIAMTQSETOT_ =RTEIAMT_ _ Requirement IdFR 14 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (2) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the total of RTEIAMT across all QSEs and all Settlement Points for each 15-Minute Interval in the Operating Day. RTEIAMTTOT= RTEIAMTQSETOT_

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 7 Real-Time Energy Payment for DC-Tie Import (1)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 8 Real-Time Energy Payment for DC-Tie Import (2) Requirement IdFR33 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (1) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the RTDCIMPAMT for a QSE, DC Tie Settlement Point, Operating Day, and 15-minute interval. RTDCIMPAMT_ _ =(-1) * RTSPP_ * (RTDCIMP_ _ * ¼) Requirement IdFR34 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (2) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the total payment to a QSE for energy imported into the ERCOT System through all DC Tie Settlement Points, for the Operating Day and 15-minute interval. RTDCIMPAMTQSETOT_ =RTDCIMPAMT_ _ Requirement IdFR 35 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (2) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the total payment to of the RTDCIMPAMT payments for the Operating Day and 15-minute interval. RTDCIMPAMTTOT= RTDCIMPAMTQSETOT_ An NPRR is necessary to modify the terminology in PR to refer to RTDCIMPAMTTOT instead of RTBTBIMPATMTOT, in order to be consistent with PR

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 9 Real-Time Energy Payment for a BLT Point (1)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 10 Real-Time Energy Payment for a BLT Point (2) Requirement IdFR48 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (1) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the BLTRAMT for a QSE, Load Zone Settlement Point, and BLT Settlement Point for an Operating Day, and 15-minute Settlement Interval. BLTRAMT _ _ _ =(-1) * RTSPP_ * BLTR_ _ _ Where is the Load Zone Settlement Point where the load normally locates and the BLTP has been configured within the Settlement System. Requirement IdFR49 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (2) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the total of the payments to each QSE for energy delivered to ERCOT Loads through BLT Points for an Operating Day and 15- minute Settlement Interval. BLTRAMTQSETOT_ = BLTRAMT _ _ _ Where is the Load Zone Settlement Point where the load normally locates and the BLTP has been configured within the Settlement System. Requirement IdFR50 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (2) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the total of the payments for energy delivered into the ERCOT System through BLT Points for the Operating Day and 15- minute Settlement Interval. BLTRAMTTOT= BLTRAMTQSETOT_

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 11 Real-Time Energy Payment for DC-Tie Export (1)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 12 Real-Time Energy Payment for DC-Tie Export (2) Requirement IdFR63 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (1) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RTDCEXPAMT for a QSE, DC Tie Settlement Point, Operating Day, and 15-minute interval. RTDCEXPAMT_ _ =RTSPP_ * (RTDCEXP_ _ * ¼) Requirement IdFR64 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (2) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the total of the RTDCEXPAMT charges to the QSE for the Operating Day and 15-minute interval. RTDCEXPAMTQSETOT_ =RTDCEXPAMT_ _ Requirement IdFR65 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (2) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the total of all RTDCEXPAMT charges to the market for the Operating Day and 15-minute interval. RTDCEXPAMTTOT= RTDCEXPAMTQSETOT_ An NPRR is necessary to modify the terminology in PR to refer to RTDCEXPAMTTOT instead of RTBTBEXPATMTOT, in order to be consistent with PR

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 13 RT Congestion Pmt or Chg for Self-Schedules (1)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 14 RT Congestion Pmt or Chg for Self-Schedules (2) Requirement IdFR78 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (1) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RTCCAMT by QSE, Source and Sink Settlement Point pair, Operating Day, and 15-minute interval, for all QSEs with a Self-Schedule for the Source and Sink Settlement Point pair. RTCCAMT_ _ _ = (RTSPP_ - RTSPP_ ) * (SSQ_ _ _ * ¼) Requirement IdFR79 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (2) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the total RTCCAMT for a QSE, Operating Day, and 15-minute interval. RTCCAMTQSETOT _ =RTCCAMT_ _ _ Requirement IdFR80 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (2) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the total RTCCAMT to the market for the Operating Day and 15-minute interval. RTCCAMT_ _ =RTCCAMTQSETOT _ (NOTE: Change required to the requirements, to use the RTCCAMTQSETOT.)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 15 Base Point Deviation Charge

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 16 Base Point Deviation Charge Requirement IDFR92 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description The ERCOT Settlement system shall determine the resource type from the resource name within the AABP bill determinant. If the resource type is an Intermittent Renewable Resource (IRR) Generation Resource, then the ERCOT Settlement system shall perform the Calculation Process for IRR Generation Resources; otherwise the ERCOT Settlement system shall perform the Calculation Process for Generation Resources, Excluding IRRs. If AABP_ _ _ resource type = IRR Then Perform Calculation Process for IRR Generation Resources Otherwise Perform Calculation Process for Generation Resources, excluding IRR

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 17 Base Point Deviation Charge for IRRs Requirement IDFR93 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description For IRR Generation Resources: If AABP_ _ _ > (HSL_ _ _ – QIRR) Then BPDAMT_ _ _ =0 Otherwise BPDAMT_ _ _ =Max (0, RTSPP_ ) * Max (0, TWTG_ _ _ – ¼ * AABP_ _ _ * (1 + KIRR))

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 18 Base Point Deviation Charge excluding IRRs Requirement IDFR94 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description For all Generation Resources, except Intermittent Renewable Resources, the ERCOT Settlement system shall determine whether or not the Generation Resource over-generated or under-generated, on an interval by interval basis, as compared to the resource’s Base Point. If AABP_ _ _ > TWTG_ _ _ Then Perform Calculation Process for Generation Resources, excluding IRRs, for Over Generation. Otherwise Perform Calculation Process for Generation Resources, excluding IRRs, for Under Generation

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 19 Base Point Deviation Charge excluding IRRs for Over Generation Requirement IDFR95 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description BPDAMT_ _ _ =Max (0, RTSPP_ ) * Max [ 0, ( TWTG_ _ _ – ¼ * Max ( ((1 + K1) * AABP_ _ _ ), (AABP_ _ _ + Q1) ) )]

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 20 Base Point Deviation Charge excluding IRRs for Under Generation Requirement IDFR95 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description BPDAMT_ _ _ =Max (0, RTSPP_ ) * Min (1, KP) * Max [ 0, ( Min ( ((1 – K2) * ¼(AABP_ _ _ )), ¼ (AABP_ _ _ – Q2) ) – TWTG_ _ _ )]

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 21 Requirement IDFR105 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description LABPDAMT_ =(-1) * BPDAMTTOT_ * LRS_ Requirement IDFR106 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description BPDAMTTOT= BPDAMTQSETOT_ Requirement IDFR107 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description BPDAMTQSETOT_ = BPDAMT_ _ _ Base Point Deviation Payment

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 22 Real-Time Revenue Neutrality Allocation (1)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 23 Real-Time Revenue Neutrality Allocation (2) Requirement IdFR114 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (2) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the RT Revenue Neutrality Allocation by QSE for each 15-minute interval in the Operating Day. LARTRNAMT_ = (-1) * (RTEIAMTTOT + BLTRAMTTOT + RTDCIMPAMTTOT + RTDCEXPAMTTOT + RTCCAMTTOT + RMRDAESRTVTOT + RTOBLAMTTOT / 4 + RTOPTAMTTOT / 4 + RTOPTRAMTTOT /4) * LRS q (NPRR change required: Modify the terminology in PR to refer to RTDCIMPAMTTOT and RTDCEXPAMTTOT instead of RTBTBEXPAMTTOT and RTBTBEXPAMTTOT in order to be consistent with PR and PR ) There are “cleanup” issues in – an NPRR is necessary in order to correct some of the textual description as well as the variable definitions table.

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 24 ERCOT System Administration Charge (1)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 25 ERCOT System Administration Charge (2) Requirement IdFR132 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the ERCOT System Administration Charge by QSE and Operating Day for a 15-minute interval. ESACAMT_ =LAFF * ( RTAML_ _ ) (NPRR change required: Modify so that the equation sums the RTAML across Settlement Points before applying the Load Administration Fee Factor.)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 26 Summary The following Protocol versions were used as the basis of the RT Energy Settlements requirements: –Nodal Protocols Section 6 (NPRR 009 approved by TAC on 08/03/2006) –Nodal Protocols Section 9 (NPRR 007 approved by the Board on 07/18/2006).