Transmission Workstream Andrew Morris 2 December 2010 BBL Agent Consultation.

Slides:



Advertisements
Similar presentations
Mod 0260 Post-Emergency Claims: Implementation Update Transmission Workstream - December 2009.
Advertisements

EU Developments. September Update  ACER Framework Guidelines on interoperability rules  Scoping paper still to be published  Rather than conduct a.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
A presentation to Transmission Workstream Angus Paxton 5 th February 2009 Network Modelling Software Review.
Reliable Power Reliable Markets Reliable People ISO Rules Update – – Outage Cancellation – Long Lead Time Energy Dispatch Compliance.
CSEPs Update Chris Warner. 2 Background  Review Group 0157  Incremental Improvements (eg: UNC Modifications 0167, 0180V, 0200)  Ofgem CSEP Group 
Exercise Opus Findings Gas Customer Forum 10 th March 2008.
The European Agricultural Fund for Rural Development: Europe investing in rural areas RDPE Regional Implementation Plan (RIP) East Midlands Proposal for.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposer: Matthew Hatch Panel Date: 15 th May : EU Capacity Regulations – Capacity Allocation Mechanisms with Congestion Management Procedures.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Planning and Community Development Department Housing Element City Council February 03, 2014.
Transmission Planning Informational Workshop Montpelier, VT September 19, 2005 Allocating the Cost of New Transmission in New England Stephen J. Rourke.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
UP presentation Transmission wstream Jan 08 1 user pays services implementation January 2008.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Code Governance Review Major Policy reform Proposals Gas Customer Forum 26 January 2009.
Bacton blending feasibility study Gas Quality Workshop 23 April 2007 Dr Nick Bates, National Grid Gas Transmission.
Mod Clarifications Transmission Workstream 6 August 2009.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Gas Regional Initiative North-West Transmission Transparency Transmission Transparency Project GRI North-West Operators‘ Group Stakeholder Group Meeting.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
D EMO W IND 2 – Delivering Cost Reduction in Offshore Wind ERA-NET Briefing Event 1 December, 2015 Sally Fenton, DemoWind Co-ordinator For further information,
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
Performance Assurance 21st May Incentives. USRV’s – Incentive Regime Charges are based on a range of standards USRV Period runs from 21 st of one month.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Review of the UNC Post-emergency Claims Arrangements Strawman February 2009.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –26 th November 2009 Distribution Workstream.
European Transparency Requirements - update Transmission Workstream 1 st May 2008.
EU Phase 3 Customer communications
User Pays User Committee 12th November 2013
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00031
Transmission Workstream 6 January 2011
Moffat - Capacity System Entry Point
Modifications iGT 039 and GT 0440 re iGT Agency Services background
Implicit XB ID BE-NL Meeting 26/07/2010.
Grid Code Review Panel 16th August 2017
Introduction of Code Contingency Guidelines Document
PN UNC Workgroup Invoicing 4th October 2011.
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
How to claim your free gift
European Transparency Requirements
The SAT will be given at ECHS on the dates below!
The SAT will be given at ECHS on the dates below!
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
NTS Entry Charging Review Update
NG Strawman – Ofgem response
0332 – Impact of combining the Entry and Exit Capacity credit processes Chris Shanley.
CSS Update for CoMC 19th September 2018
Draft Capacity & Connection Plan
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Modification 501 slides for Workgroup
Project Nexus Workgroup
Introduction of Code Contingency Guidelines Document
MOD Deemed applications – User pays initial thoughts.
Proposed Transitional Gas Exit Arrangements
Mod 230: QSEC and AMSEC Timings
Gas European Network Code Implementation
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
IECR Incremental Step Size
UNC MOD 213: USER PAYS GOVERNANCE ARRANGEMENTS
Transmission Workstream 05 November 2009
Gas Customer Forum 28 July 2008
EU CAM Network Code and CMP Guideline Proposal Update
Presentation transcript:

Transmission Workstream Andrew Morris 2 December 2010 BBL Agent Consultation

Background BBL IRF service implemented October 2010 CSEP Ancillary Agreement completed November 2010 – One shipper signed up so far – An Agent is required to allocate gas between multiple shippers BACL is a non-profit company set up by shippers to manage the matching and allocation at the Bacton IUK CSEP BACL along with six shippers are driving the implementation of an allocation agent for BBL Exit Point for 1 January 2011 Proposed principles and rules are based on the existing Bacton Agent and Claims Validation Agent arrangements. Transmission Workstream 2/12/102

3 Main points of the consultation Proposed governance and agreement structure Cost recovery mechanisms Information exchange process Allocation rules Modification process Same as Bacton Agent Same as Bacton Agent with some cost sharing Similar to CVA Similar principles to Bacton Agent and CVA Same as Bacton Agent

Pöyry Energy Consulting King Charles House Park End Street Oxford, UK OX1 1JD +44 (0) Andrew Morris Matthieu Mollard Pöyry Energy (Oxford) Ltd. Registered in England No King Charles House, Park End Street, Oxford OX1 1JD. Target implementation date 1 January 2011 Deadline for consultation 10 December 2010 Decisions being made & agreements signed 21 December 2010 Further information and copies of the draft agreements are available from contacts below